← Back
Factory, heavy manufacturing, fireproof
1700 BATHGATE AVENUE
BRONX · BIN 2009585
💬 Discuss this project
1983Year Built
1Stories
F1Building Class
M1-4Zoning
110,000 sfGross Floor Area
1Units
LL97 Covered21 Open Violations ▸
Factory, heavy manufacturing, fireproof · 122,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
Mechanical
Roof2p · 1 filing · 4 docs
Floor 22p · 1 filing · 4 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC ECONOMIC DEVELOPMENT CORP1607/08/2026
RELIABLE ENTERPRISES504/09/2026
PORT AUTHORITY OF NY NJ203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
NEW YORK ENGINEERING ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE USA CONSTR COMP INC*General Contractor407/08/2026
MAXWELL PLUMB MECH. CORPPlumbing207/08/2026
RICHARD NEUElectrical103/22/2026
RELIABLE ENTERPRISES INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930105/30/2025
NEW YORK ENGINEERS, P.C.3868102/18/2025
NEW YORK ENGINEERING ASSO851208/10/2021
Building Lifecycle
All (46)Filed (5)Permit Issued (5)Violation (24)Inspection (4)Special Inspection (8)
05/26/2026
Permit issued — General Construction
X01087942-I1-GC
01/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/05/2025
Permit issued — General Construction
X01087942-I1-GC
10/31/2025
Permit issued — Sidewalk Shed
X01311313-I1-SH
10/30/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01311313-I1
05/30/2025
Filed — Alteration
FACADE REPAIR
X01087942-I1
02/18/2025
Filed — Alteration
Mechanical System replacement in the Stability Chamber. No change to use, occupancy or intended use.
X01146109-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/24/2021
Permit issued — Boiler Equipment
X00541264-I1-BE
08/23/2021
Permit issued — Boiler Equipment
X00538954-I1-BE
08/10/2021
Filed — Alteration
REGISTER NEW GAS BOILER.
X00541264-I1
08/10/2021
Filed — Alteration
REGISTER REPLACEMENT BOILER GAS BOILER.
X00538954-I1
07/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
07/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/16/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/16/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
06/16/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/16/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
06/16/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
06/16/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/22/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/16/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/1986
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBLUE USA CONSTR COMP INC*05/26/2026
DOB NOWGeneral ConstructionPermit IssuedBLUE USA CONSTR COMP INC*11/05/2025
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC10/31/2025
DOB NOWBoiler EquipmentPermit IssuedMAXWELL PLUMB MECH. CORP08/24/2021
DOB NOWBoiler EquipmentPermit IssuedMAXWELL PLUMB MECH. CORP08/23/2021
BISEQISSUEDYORK SCAFFOLDING10/10/1996
BISOTISSUEDWASOFF PLBG & UTILITY CO04/13/1995
BISPLISSUEDWASOFF PLBG & UTILITY CO04/13/1995
1 project · most recent 02/18/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2025——Heating and Air Conditioning Systems
Heat / Cool
Lg ZRUM048GSS4 4 tons · Vrf Outdoor ×2
2 projects · most recent 10/31/2025
General Wiring
FiledStatusContractorScope
10/31/2025Permit IssuedRICHARD NEU—
11/02/2021Permit IssuedSCIENTIFIC ELEC. CO. INCGeneral Wiring
1 project · most recent 10/30/2025
Sidewalk Shed
FiledStatusContractorScope
10/30/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/02/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
07/02/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/16/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/16/2021Heating SystemsLOUIS ARENAspecial
06/16/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/16/2021Heating SystemsLOUIS ARENAspecial
06/16/2021Maintenance informationLOUIS ARENAenergy_progress
06/16/2021Maintenance informationLOUIS ARENAenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026X00541264-I1Request digital key ↗
08/25/2026X00538954-I1Request digital key ↗
08/20/2026X01146109-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X00541264-I1Open ↗
09/23/2026X00541264-I1Open ↗
09/23/2026X00541264-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026X00541264-I1Open ↗
08/25/2026X00538954-I1Open ↗
08/13/2026X01146109-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X00538954-I1Open ↗
09/23/2026X00541264-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01087942-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026X01311313-I1Open ↗
08/13/2026X01087942-I1Open ↗
08/13/2026X01146109-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026X01146109-I1Open ↗