← Back
Elevator apt, semi-fireproof without stores
Berry (NYCHA)
1700 RICHMOND ROAD · BIN 5109568
💬 Discuss this project
1960Year Built
6Stories
D1Building Class
R5Zoning
448,500 sfGross Floor Area
506Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 483,150 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 17 docs
Cellar4p · 2 filings · 20 docs
10 jobs · most recent 02/15/2024
General Wiring
FiledStatusContractorScope
02/15/2024CompleteEMENAR ELECL SVCS CONSTGeneral Wiring
11/06/2023CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
11/06/2023CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
05/30/2023CompleteEQUINOX ELECTRIC LLCGeneral Wiring
05/19/2023CompleteEQUINOX ELECTRIC LLCGeneral Wiring
12/22/2022CompleteDAVEN ELECTRIC CORP—
11/29/2021CompleteOHM'S ELECTRICAL CORPGeneral Wiring
09/12/2020Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
09/12/2020Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
11/29/2018CompleteGILSTON ELEC'L CONTR. CORGeneral Wiring
Building Lifecycle
All (38)Filed (5)Permit Issued (3)Signed Off (2)Violation (1)Inspection (4)Objection (12)Special Inspection (11)
08/02/2023
Signed off — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 4 - INSTALL NEW CHIMNEY FOR THE EXHAUST VENTS ON THE TWO (2) NEW GAS FIRED HOT WATER HEATERS, AS PER PLANS. INSTALL NEW FIRE RATED DOOR, AND FILL EXISTING WALL OPENINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00611053-I1
07/28/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
07/28/2023
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
07/28/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
07/28/2023
Special inspection requirement — Chimneys and vents
GEORGE GHEBRYAL
07/28/2023
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
07/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
07/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
07/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
07/18/2023
Filed — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 4 - INSTALL NEW CHIMNEY FOR THE EXHAUST VENTS ON THE TWO (2) NEW GAS FIRED HOT WATER HEATERS, AS PER PLANS. INSTALL NEW FIRE RATED DOOR, AND FILL EXISTING WALL OPENINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00611053-P1
05/30/2023
Signed off — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 4 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00611038-I1
05/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
05/08/2023
Filed — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 4 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00611038-P2
03/08/2023
Permit issued — General Construction
S00611053-I1-GC-CX
10/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2022
Objection resolved — Addressed
09/27/2022
Objection raised — Scope
09/22/2022
Filed — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 4 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00611038-P1
09/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2022
Permit issued — Plumbing
S00611038-I1-PL
04/07/2022
Permit issued — Mechanical Systems
S00611053-I1-GC-CX
02/16/2022
Objection raised — Scope
02/16/2022
Objection resolved — Addressed
02/16/2022
Objection raised — Energy
02/16/2022
Objection resolved — Addressed
02/16/2022
Objection raised — Inspections
02/16/2022
Objection resolved — Addressed
02/16/2022
Objection raised — Scope
02/16/2022
Objection resolved — Addressed
02/16/2022
Objection raised — Fire_Protection
02/16/2022
Objection resolved — Addressed
01/25/2022
Filed — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 4 - INSTALL NEW CHIMNEY FOR THE EXHAUST VENTS ON THE TWO (2) NEW GAS FIRED HOT WATER HEATERS, AS PER PLANS. INSTALL NEW FIRE RATED DOOR, AND FILL EXISTING WALL OPENINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00611053-I1
01/25/2022
Filed — Alteration
NYCHA BOILER - BERRY HOUSES, BUILDING 4 - DEMOLISH EXISTING STEAM FIRED HOT WATER TANK AND ASSOCIATED PIPING. PROVIDE ALL NEW GAS FIRED HOT WATER HEATER SYSTEM FOR THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00611038-I1
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA1407/08/2026
NYC HOUSING AUTHORITY1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VENTROP ENGINEERING CONSULTING GROU507/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAZINI ENGINEERING P C1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC US, INCGeneral Contractor307/08/2026
RYBURN PHILLIPSElectrical303/21/2026
GOLDSTEIN, JElectrical103/21/2026
MIRANDA, JOSEElectrical103/21/2026
NYEAST ASSOCIATES, LLCElectrical103/21/2026
EQUINOX ELECTRIC LLCElectrical103/22/2026
DYNAMIC CONTRACTING CORPPlumbing107/08/2026
GILSTON ELEC'L CONTR. CORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106307/18/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDYNAMIC US, INC03/08/2023
DOB NOWPlumbingSigned-offDYNAMIC CONTRACTING CORP04/07/2022
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC04/07/2022
BISOTISSUEDA.B.C.D. CONSTRUCTION COR08/20/2015
BISOTISSUEDA.B.C.D. CONSTRUCTION COR06/22/2015
BISEQISSUEDA.B.C.D. CONSTRUCTION COR05/04/2015
BISOTISSUEDA.B.C.D. CONSTRUCTION COR04/29/2015
BISEQISSUEDA.B.C.D. CONSTRUCTION COR04/20/2015
BISEQISSUEDA.B.C.D. CONSTRUCTION COR04/20/2015
BISEQISSUEDZORIA CONSTRUCTION CORP04/09/2004
BISFPISSUEDACTIVE FIRE EXTINGUISHER INC08/21/2001
BISFPISSUEDACTIVE FIRE EXTINGUISHER INC07/06/2001
BISMHISSUEDOLIVER & MCCLELLAN06/07/2001
BISMHISSUEDOLIVER & MCCLELLAN02/27/2001
BISFPISSUEDACTIVE FIRE EXTINGUISHER INC07/28/2000
BISOTISSUEDV.C. VITANZA SONS, INC.01/31/1994
BISPLISSUEDV. C. VITANZA SONS INC01/31/1994
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/28/2023FinalGEORGE GHEBRYALprogress
07/28/2023Mechanical SystemsGEORGE GHEBRYALspecial
07/28/2023Post-installed AnchorsGEORGE GHEBRYALspecial
07/28/2023Chimneys and ventsGEORGE GHEBRYALspecial
07/28/2023Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
07/28/2023HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
07/28/2023HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
07/28/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
05/16/2023HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
05/16/2023HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
05/16/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026S00611038-I1Request digital key ↗
08/24/2026S00611038-P2Request digital key ↗
08/23/2026S00611053-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
08/21/2015540040891Open ↗
06/22/2015540040891Open ↗
05/08/2015520242835Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
05/04/2015520242835Open ↗
04/16/2015540074514Open ↗
04/16/2015540074505Open ↗
Showing 3 of 4 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
05/28/2015540040891Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/29/2015540040891Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026S00611053-I1Open ↗
08/26/2026S00611053-I1Open ↗
08/26/2026S00611053-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/06/2016540040891Open ↗
04/06/2016540040891Open ↗
02/12/2016520242835Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026S00611038-P1Open ↗
08/24/2026S00611038-P2Open ↗
08/24/2026S00611038-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/08/2015520242835Open ↗
04/16/2015540074514Open ↗
04/16/2015540074505Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/16/2015540074514Open ↗
04/16/2015540074505Open ↗
03/27/2014540040891Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/16/2015540074514Open ↗
04/16/2015540074505Open ↗
03/27/2014540040891Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026S00611053-I1Open ↗
09/23/2026S00611053-I1Open ↗
09/23/2026S00611053-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/04/2015520242835Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN 2008 CODE1
03/27/2014540040891Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026S00611038-I1Open ↗
08/13/2026S00611053-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/27/2014540040891Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/03/2016540040891Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/11/2014540040891Open ↗
08/29/2014540040891Open ↗
03/27/2014540040891Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00611038-I1Open ↗
08/13/2026S00611053-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/27/2014540040891Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/06/2016540040891Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/06/2016540040891Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/16/2015540074505Open ↗
▸BISNYCECC ANALYSIS1
03/27/2014540040891Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/16/2015540074514Open ↗
04/16/2015540074505Open ↗
09/11/2014540040891Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/03/2016540040891Open ↗
04/06/2016540040891Open ↗
02/12/2016520242835Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/24/2026S00611038-I1Open ↗
08/24/2026S00611038-P2Open ↗
08/14/2026S00611053-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/12/2016520242835Open ↗
05/04/2015520242835Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/24/2026S00611038-I1Open ↗
08/13/2026S00611053-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/04/2015520242835Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/06/2016540040891Open ↗
03/27/2014540040891Open ↗
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET3
04/16/2015540074514Open ↗
04/16/2015540074505Open ↗
03/27/2014540040891Open ↗
▸BISADDITIONAL INFORMATION1
03/27/2014540040891Open ↗
▸BISEFILING COVER SHEET1
05/04/2015520242835Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/08/2015520242835Open ↗
05/04/2015520242835Open ↗