Two stories - detached, small or mid-size
1701 ASTOR AVENUE
BRONX · Pelham Gardens · BIN 2051070
💬 Discuss this project
1950Year Built
2.5Stories
A1Building Class
R3XZoning
3,229 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · 5,748 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 24p · 1 filing · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
214 Place Realty403/21/2026
Ferazzoli Creative Design307/08/2026
PD103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/03/2020$750K—214 PLACE REALTY, LLC → Private party$232/sf building
10/19/2018$1.2M—Private party → 214 PLACE REALTY LLC$387/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KDV Designs Architects506/30/2023
Frank Petruso Architect112/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & Associates1003/21/2026
Frank Petrusora Aol Com203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D&F Plumbing Mechanical Ispecialty_contractor303/21/2026
Ips PlumbingPlumbing207/08/2026
Robin Electrical CoElectrical103/22/2026
FerazScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SY Engineering5149506/30/2023
Building Lifecycle
01/25/2024
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
X00557661-I1-PL
09/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2023
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X00557661-S1-GC
06/30/2023
Filed — Alteration
INSTALLING NEW GAS METER, NEW GAS DRYER & NEW WASHER AT EXISTING ONE FAMILY DWELLING AS PER PLANS. ALSO REPLACING OLD GAS BOILER WITH NEW AND REPLACING OLD BATHROOM FIXTURES WITH NEW AT EXISTING SECOND FLR AND ATTIC BATHROOMS. NO OTHER WORK TO BE DONE.
X00557661-P3
06/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
31 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedIps Plumbing01/25/2023
DOB NOWGeneral ConstructionPermit IssuedD&F Plumbing Mechanical I07/07/2022
DOB NOWPlumbingPermit IssuedIps Plumbing10/01/2021
DOB NOWConstruction FenceSigned-offFeraz12/03/2019
BIS—ISSUEDFeraz12/06/2019
1 project · most recent 06/30/2023
Gas Water/Sanitary
FiledStatusContractorScope
06/30/2023Permit IssuedIps PlumbingGas, Water/Sanitary
2 projects · most recent 01/27/2023
General Wiring
FiledStatusContractorScope
01/27/2023CompleteRobin Electrical CoGeneral Wiring
12/12/2019CompleteAstro Electrical ContractorsGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/30/2023HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
06/30/2023Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
06/30/2023Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
06/30/2023HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
06/30/2023HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
06/30/2023Maintenance informationSUNGBOM YIenergy_progress
06/01/2023HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
06/01/2023Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
06/01/2023Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
06/01/2023HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
06/01/2023HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
06/01/2023Maintenance informationSUNGBOM YIenergy_progress
10/19/2022FinalDAVIDSON CHRISTMASprogress
10/19/2022Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
12/02/2019FinalFrank Petrusoprogress
88 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account