← Back
Elevator apt, semi-fireproof without stores
1701 CLAY AVENUE
BRONX · BIN 2007324
💬 Discuss this project
2022Year Built
6Stories
D1Building Class
R7-1Zoning
12,235 sfGross Floor Area
17Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: CLAY ESTATES LLC · 2,850 sf lot · 4.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Roof105p · 2 filings · 20 docs
Floor 6101p · 1 filing · 20 docs
Floor 5100p · 1 filing · 20 docs
Floor 4101p · 1 filing · 20 docs
Floor 3100p · 1 filing · 20 docs
Floor 2103p · 1 filing · 20 docs
Floor 1116p · 1 filing · 20 docs
Mezzanine116p · 1 filing · 20 docs
Cellar99p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RENNON CONSTRUCTION807/08/2026
VETA CONSTRUCTION403/22/2026
CLAY ESTATES403/21/2026
POINTY DEVELOPMENTS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/25/2021$665K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING2203/21/2026
BMG GROUP USA903/21/2026
EXPRESS FILING INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RED BRICK PROPERTY MNGMTGeneral Contractor2907/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor307/08/2026
MPI PLUMBING CORPPlumbing307/08/2026
DESIGN N SAFETY INCGeneral Contractor203/21/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161906/14/2023
Building Lifecycle
All (177)Filed (26)Permit Issued (22)Signed Off (9)Inspection (10)Objection (80)Special Inspection (30)
11/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/01/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/13/2023
Permit issued — General Construction
X00516005-I1-GC
07/13/2023
Signed off — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-S1
07/03/2023
Signed off — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-S7
06/29/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/27/2023
Objection resolved — Addressed
06/23/2023
Objection raised — Other
06/23/2023
Objection resolved — Addressed
06/21/2023
Objection raised — Other
06/14/2023
Filed — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-A3
06/12/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/12/2023
Special inspection requirement — Lighting controls
FAHAD FATEH
06/12/2023
Special inspection requirement — Sprayed fire-resistant materials
FAHAD FATEH
06/12/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/12/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/12/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
06/12/2023
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
06/12/2023
Special inspection requirement — Exterior lighting power
FAHAD FATEH
06/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/12/2023
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
06/12/2023
Special inspection requirement — Underpinning
FAHAD FATEH
06/12/2023
Special inspection requirement — Masonry
FAHAD FATEH
06/12/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
06/12/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
06/12/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
06/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/12/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
06/12/2023
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
06/12/2023
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/12/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/12/2023
Special inspection requirement — Metering
FAHAD FATEH
06/12/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/12/2023
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
06/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/12/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/12/2023
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
06/12/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/01/2023
Signed off — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-S2
05/30/2023
Objection raised — Other
05/30/2023
Objection resolved — Addressed
05/19/2023
Filed — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-A1
05/18/2023
Filed — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-A2
05/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/16/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/15/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/10/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/02/2023
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00540694-I1
03/31/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS, SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
X08011727-I1
03/31/2023
Signed off — Alteration
INSTALLATION OF 130' NEW SIDEWALK SHED AT 1701 CLAY AVENUE BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00561616-I1
03/29/2023
Objection resolved — Addressed
03/21/2023
Objection raised — Scope
03/14/2023
Filed — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-P9
01/13/2023
Signed off — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-S5
01/12/2023
Signed off — New Building
SPRINKLER FILING FILED SUBSEQUENT TO NB X00516005
X00516005-S4
01/12/2023
Permit issued — General Construction
X00516005-I1-GC
01/12/2023
Permit issued — General Construction
X00516005-I1-GC
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRED BRICK PROPERTY MNGMT11/13/2023
DOB NOWGeneral ConstructionPermit IssuedRED BRICK PROPERTY MNGMT01/12/2023
DOB NOWGeneral ConstructionPermit IssuedRED BRICK PROPERTY MNGMT01/12/2023
DOB NOWGeneral ConstructionPermit IssuedRED BRICK PROPERTY MNGMT12/20/2022
DOB NOWMechanical SystemsSigned-offRED BRICK PROPERTY MNGMT12/20/2022
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/13/2022
DOB NOWConstruction FenceSigned-offRED BRICK PROPERTY MNGMT11/04/2022
DOB NOWSupported ScaffoldSigned-offRED BRICK PROPERTY MNGMT09/30/2022
DOB NOWStructuralSigned-offRED BRICK PROPERTY MNGMT08/19/2022
DOB NOWEarth WorkSigned-offRED BRICK PROPERTY MNGMT08/18/2022
DOB NOWSupport of ExcavationSigned-offRED BRICK PROPERTY MNGMT08/18/2022
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP08/11/2022
DOB NOWEarth WorkSigned-offRED BRICK PROPERTY MNGMT07/12/2022
DOB NOWSupport of ExcavationSigned-offRED BRICK PROPERTY MNGMT07/08/2022
DOB NOWPlumbingSigned-offYG SERVICES INC06/23/2022
DOB NOWFoundationSigned-offRED BRICK PROPERTY MNGMT05/18/2022
DOB NOWSupport of ExcavationSigned-offRED BRICK PROPERTY MNGMT05/12/2022
DOB NOWGeneral ConstructionPermit IssuedRED BRICK PROPERTY MNGMT01/05/2022
DOB NOWMechanical SystemsSigned-offRED BRICK PROPERTY MNGMT12/27/2021
DOB NOWConstruction FenceSigned-offRED BRICK PROPERTY MNGMT11/29/2021
DOB NOWConstruction FenceSigned-offDESIGN N SAFETY INC08/11/2021
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP07/26/2021
BISEQISSUEDCHESAKL ENTERPRISES INC06/30/2022
BIS—ISSUEDDESIGN N SAFETY INC08/30/2021
1 project · most recent 06/14/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/14/2023Permit IssuedRED BRICK PROPERTY MNGMTAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin FTX09NMVJU 9,000 BTU · Heat Pump Outdoor ×1
RX12AXVJU 9,000 BTU · Heat Pump Outdoor ×1
Heating
Daikin RXSQ24TAVJU 25,800 BTU · Vrf Outdoor ×16
RXTQ36TAVJ9 40,000 BTU · Vrf Outdoor ×12
RXTQ36TAVJU 40,000 BTU · Vrf Outdoor ×2
RXTQ48TAVJU 52,000 BTU · Vrf Outdoor ×2
RXTQ60TAVJU 57,500 BTU · Vrf Outdoor ×2
Ventilation
Renewaire EV450RT 490 CFM · Erv ×1
1 project · most recent 06/14/2023
Sprinkler System
FiledStatusContractorScope
06/14/2023Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 06/14/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/14/2023Signed-offKEY PLBNG & HTG SOL CORPGas, Storm, Water/Sanitary
4 projects · most recent 08/12/2022
General Wiring
FiledStatusContractorScope
08/12/2022CompleteHIGH QUALITY ELECTRIC OF—
07/06/2022CompleteFOSTER ELEC'L SVC., INC.General Wiring
12/29/2021CompleteSELECT ELECTRICAL GROUP I1 meters, 1 new_meters
07/21/2021CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 06/14/2023
Steel Concrete
FiledStatusContractorScope
06/14/2023Permit IssuedRED BRICK PROPERTY MNGMTSteel, Concrete
1 project · most recent 06/14/2023
Earthwork
FiledStatusContractorScope
06/14/2023Permit IssuedRED BRICK PROPERTY MNGMTEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/01/2023Fail-Final CND-Occupancy InspectionFailView ↗
05/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/05/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/29/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/16/2022Pass-Final House ConnectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/29/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/29/2023Sprinkler SystemsFAHAD FATEHspecial
06/12/2023Interior lighting powerFAHAD FATEHenergy_progress
06/12/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/12/2023Exterior lighting powerFAHAD FATEHenergy_progress
06/12/2023Fenestration air leakageFAHAD FATEHenergy_progress
06/12/2023Maintenance informationFAHAD FATEHenergy_progress
06/12/2023Insulation placement and R valuesFAHAD FATEHenergy_progress
06/12/2023MeteringFAHAD FATEHenergy_progress
06/12/2023Air barrier continuity plan testingFAHAD FATEHenergy_progress
06/12/2023Lighting controlsFAHAD FATEHenergy_progress
06/12/2023Sprayed fire-resistant materialsFAHAD FATEHspecial
06/12/2023Concrete - Cast-In-PlaceFAHAD FATEHspecial
06/12/2023UnderpinningFAHAD FATEHspecial
06/12/2023MasonryFAHAD FATEHspecial
06/12/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
06/12/2023Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
06/12/2023Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
06/12/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/12/2023Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
06/12/2023Subgrade InspectionsFAHAD FATEHspecial
06/12/2023Post-installed AnchorsFAHAD FATEHspecial
06/12/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/12/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/12/2023Fenestration areasFAHAD FATEHenergy_progress
Latest 25 of 150.
▾Documents — 216 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/25/2026X00540694-P2Request digital key ↗
08/25/2026X00540694-I1Request digital key ↗
08/25/2026X00540694-P1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits11
▸BISBPP-5 - Authorization to the Department of Transportation6
04/24/2023240305399Open ↗
04/24/2023240305399Open ↗
10/12/2021240305399Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
06/24/2022240331547Open ↗
06/16/2021240305399Open ↗
04/19/2021220737175Open ↗
▸BISWORK PERMIT APPLICATION2
06/30/2022240331547Open ↗
09/03/2021220737175Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026X00516005-P2Open ↗
08/13/2026X00516005-A2Open ↗
08/13/2026X00516005-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026X00516005-P9Open ↗
08/13/2026X00516005-P2Open ↗
08/13/2026X00516005-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00516005-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/25/2026X00540694-P2Open ↗
08/25/2026X00540694-I1Open ↗
08/25/2026X00540694-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/01/2026X00516005-S7Open ↗
08/30/2026X00516005-S5Open ↗
08/30/2026X00516005-S6Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/30/2026X00516005-S5Open ↗
08/29/2026X00516005-A2Open ↗
08/29/2026X00516005-A2Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/24/2022240331547Open ↗
06/16/2021240305399Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/24/2022240331547Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/16/2021240305399Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/24/2022240331547Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026X00516005-P2Open ↗
08/13/2026X00516005-P9Open ↗
08/13/2026X00516005-A2Open ↗
Showing 3 of 5 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
09/03/2021220737175Open ↗
▸BISGAS CUT-OFF1
09/03/2021220737175Open ↗
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist5
08/24/2026X00516005-P1Open ↗
08/15/2026X00516005-A2Open ↗
08/14/2026X00516005-P9Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES SITE PLAN2
03/03/2023240305399Open ↗
03/03/2023240305399Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/03/2021220737175Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/21/2021240305399Open ↗
▸BISSTREET TREE CHECKLIST1
06/16/2021240305399Open ↗
▸BISSTREET TREE SIGNOFF1
03/03/2023240305399Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/03/2021220737175Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/03/2021220737175Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00516005-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00516005-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00516005-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/03/2021220737175Open ↗
▸BISRODENT CONTROL1
09/03/2021220737175Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026X00516005-S2Open ↗
08/13/2026X00516005-S1Open ↗
08/13/2026X00516005-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00516005-I1Open ↗
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT7
08/13/2026X00516005-S5Open ↗
08/13/2026X00516005-I1Open ↗
08/13/2026X00516005-P3Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/31/2023240331547Open ↗
06/24/2022240331547Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026X00516005-I1Open ↗
08/13/2026X00516005-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00516005-S5Open ↗
08/13/2026X00516005-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/03/2021220737175Open ↗
09/03/2021220737175Open ↗
09/03/2021220737175Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
09/03/2021220737175Open ↗
▸BISFINAL1
01/31/2023240331547Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/02/2023240331547Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT1
06/24/2022240331547Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/30/2023240331547Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/03/2021220737175Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026X00516005-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026X00516005-I1Open ↗
▸Filing & Intake Forms10
▸DOB NOWAI1 Form (from plan PDF)3
08/16/2026X00516005-S7Open ↗
08/16/2026X00516005-S7Open ↗
08/16/2026X00516005-S7Open ↗
▸BISADDITIONAL INFORMATION2
10/12/2021240305399Open ↗
07/21/2021240305399Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/24/2022240331547Open ↗
06/16/2021240305399Open ↗
▸BISEFILING COVER SHEET1
04/19/2021220737175Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/21/2021240305399Open ↗
▸BISBOROUGH INTAKE FORM1
09/03/2021220737175Open ↗
▸Other Documents36
▸DOB NOWPW1 (from plan PDF)6
08/16/2026X00516005-S7Open ↗
08/16/2026X00516005-S7Open ↗
08/16/2026X00516005-S7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSURVEY: INITIAL5
08/13/2026X00516005-A2Open ↗
08/13/2026X00516005-P1Open ↗
08/13/2026X00516005-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPD1 Document5
08/13/2026X00516005-A2Open ↗
08/13/2026X00516005-I1Open ↗
08/13/2026X00516005-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X00516005-P9Open ↗
08/13/2026X00516005-P1Open ↗
08/13/2026X00516005-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
10/12/2021240305399Open ↗
07/21/2021240305399Open ↗
06/16/2021240305399Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026X00516005-P9Open ↗
08/13/2026X00516005-I1Open ↗
08/13/2026X00516005-A2Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
04/24/2023240305399Open ↗
04/24/2023240305399Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00516005-S6Open ↗
08/13/2026X00516005-S5Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
09/03/2021220737175Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/12/2021240305399Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
10/12/2021240305399Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026X00516005-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00516005-I1Open ↗