BuildNYC
Two stories - detached, small or mid-size
1701 POPHAM AVENUE
BRONX · BIN 2008922
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R5Zoning
3,331 sfGross Floor Area
1Units
Rent Stabilized4 Active Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 1701 Popham · 4,335 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof13p · 1 filing · 20 docs
Floor 310p · 1 filing · 20 docs
Floor 247p · 1 filing · 20 docs
Floor 1Unit 148p · 1 filing · 20 docs
Basement41p · 1 filing · 20 docs
Site & exterior34p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1701 Popham103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/22/2024$605K—350 PATTON LLC → 1701 POPHAM LLC$182/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nikolai Katz Architect908/05/2026
Chun Engineering Consultant303/11/2026
Vasilios Artemiou207/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prime Piping & Heatingspecialty_contractor207/08/2026
True Power ElectricalElectrical103/22/2026
Builders Group USAGeneral Contractor104/09/2026
Builders Group USAspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161208/05/2026
Building Lifecycle
10/16/2026
Objection raised — Admin
10/16/2026
Objection raised — Structural
10/16/2026
Objection raised — Other
09/15/2026
Ftm rw-rw along EXP3 lotline ~ 20FT & 100FT in lngth, shared w/ propty @ 1704...undercliff ave & 1705 popham ave. The rw has missinsectns&…
DOB violation · open
09/08/2026
Objection resolved — Addressed
123 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBuilders Group USA06/06/2024
DOB NOWGeneral ConstructionPermit IssuedBuilders Group USA05/21/2024
DOB NOWPlumbingSigned-offPrime Piping & Heating05/16/2024
DOB NOWSprinklersSigned-offAmb Mechanical05/16/2024
1 project · most recent 08/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
08/05/2026Signed-offBuilders Group USAHeating and Air Conditioning Systems
1 project · most recent 08/05/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/05/2026Signed-offAmb MechanicalStorm, Water/Sanitary
1 project · most recent 03/04/2025
General Wiring
FiledStatusContractorScope
03/04/2025CompleteTrue Power ElectricalGeneral Wiring
1 project · most recent 08/05/2026
Steel
FiledStatusContractorScope
08/05/2026Signed-offBuilders Group USASteel
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/30/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/28/2024Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
08/04/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/04/2026Interior lighting powerFAHAD FATEHenergy_progress
08/04/2026Fenestration areasFAHAD FATEHenergy_progress
08/04/2026MeteringFAHAD FATEHenergy_progress
08/04/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
08/04/2026Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
08/04/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/04/2026Maintenance informationFAHAD FATEHenergy_progress
08/04/2026Fenestration air leakageFAHAD FATEHenergy_progress
08/04/2026Permanent certificateFAHAD FATEHenergy_progress
08/04/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/04/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
08/04/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/02/2026Concrete - Cast-In-Place—special
03/02/2026Structural Stability – Alterations of existing buildings—special
02/12/2026Structural Steel - High Strength Bolting—special
02/12/2026Final—progress
02/12/2026Structural Steel - Welding—special
02/12/2026Structural Steel - Details—special
02/12/2026Structural Stability – Alterations of existing buildings—special
02/12/2026Fire-Resistant Penetrations and Joints—special
01/14/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
01/14/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
01/14/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
01/14/2026Structural Cold-Formed SteelSHAHRIAR QUAYYUMspecial
Latest 25 of 97.