← Back
BuildNYC
Library
Mapleton Branch Library
1702 60TH STREET · BIN 3132091
💬 Discuss this project
1954Year Built
2Stories
P8Building Class
R5Zoning
18,744 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Library · Owner of record: Brooklyn Public Library · 13,116 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMapleton Branch LibraryUnder Construction31p · 6 filings · 18 docs
BulkheadMapleton Branch Library1p · 1 filing · 12 docs
Floor 2Mapleton Branch LibraryUnder Construction26p · 3 filings · 18 docs
Floor 1Mapleton Branch LibraryUnder Construction26p · 3 filings · 18 docs
CellarMapleton Branch LibraryUnder Construction27p · 5 filings · 18 docs
Site & exteriorMapleton Branch Library5p · 1 filing · 7 docs
Filed — no permit issuedMapleton Branch Library37p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction3010/04/2026
Brooklyn Public Library1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Berzak Schoen Consultants803/21/2026
Loring Consulting Engineers403/21/2026
K & M Associates403/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sasco Construction SvceScaffold1407/08/2026
C. D. E. Air-ConditioningGeneral Contractor507/08/2026
Louis L.buttermark & SonsPlumbing407/08/2026
National Mechanical Services PlumbingPlumbing407/08/2026
G.S.H. ElectricElectrical203/21/2026
Sasco Construction SvceGeneral Contractor207/08/2026
The Metro GroupGeneral Contractor107/08/2026
Ogc Electrical ContractorElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CSA Group NY Architects A6928409/22/2026
Tectonic Engineering Cons106402/26/2026
Bazini Engineering1808206/15/2021
Building Lifecycle
All (110)Filed (20)Permit Issued (20)Signed Off (3)Violation (21)Inspection (7)Objection (9)Special Inspection (30)
09/24/2026
Special inspection requirement — HVAC and service water heating equipment
Luis Rivera
09/24/2026
Special inspection requirement — HVAC insulation and sealing
Luis Rivera
09/24/2026
Special inspection requirement — Mechanical Systems
Luis Rivera
09/24/2026
Special inspection requirement — Final
Luis Rivera
09/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Luis Rivera
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
Luis Rivera
09/24/2026
Special inspection requirement — Maintenance information
Luis Rivera
09/24/2026
Special inspection requirement — HVAC and service water heating system controls
Luis Rivera
09/24/2026
Special inspection requirement — Shutoff dampers
Luis Rivera
09/22/2026
Filed — Alteration
replacement of existing rooftop HVAC and split system air ac units and all new controls.
B00298829-P1
06/16/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00937746-I1
05/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2026
Objection raised — Cost
04/16/2026
Filed — Alteration
install new gas piping from cellar to roof top HVAC units.
B00298838-P1
04/16/2026
Special inspection requirement — Maintenance information
Luis Rivera
04/16/2026
Special inspection requirement — Shutoff dampers
Luis Rivera
04/16/2026
Special inspection requirement — HVAC and service water heating equipment
Luis Rivera
04/16/2026
Special inspection requirement — HVAC and service water heating system controls
Luis Rivera
04/16/2026
Special inspection requirement — Mechanical Systems
Luis Rivera
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Luis Rivera
04/16/2026
Special inspection requirement — Final
Luis Rivera
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Luis Rivera
04/16/2026
Special inspection requirement — HVAC insulation and sealing
Luis Rivera
03/17/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/12/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/26/2026
Filed — Alteration
B00495387-P1
01/05/2026
Permit issued — Mechanical Systems
B00298829-I1-MS
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/18/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/18/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/18/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
12/18/2025
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
12/05/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Admin
11/26/2025
Objection resolved — Addressed
11/24/2025
Permit issued — Plumbing
B00495387-I1-PL
11/13/2025
Filed — Alteration
Column repairs , reinforcement of sealed beam , reinforcement of existing spandrel beam, installation of guard rails into existing parapet. no change to use, egress, or occupancy
B00495369-P1
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Rivera
10/14/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
10/14/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
10/14/2025
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
10/14/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
10/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
08/07/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Other
07/25/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Admin
07/18/2025
Objection raised — Other
07/16/2025
Permit issued — Supported Scaffold
B00937746-I1-SH
07/09/2025
Filed — Alteration
Development of existing library yard into a new library garden as accessory space to the library. The design provides flexible program spaces, seatings, and enhanced plantings.No change in use, egress, or occupancy.
B01181879-I1
06/26/2025
Filed — Alteration
Development of existing library yard into a new library garden as accessory space to the library. Regrading is required to ensure ADA accessibility, and a new entrance will be created at the library building. There is no change in use, egress,or occupancy
B01174861-I1
06/24/2025
Filed — Alteration
Development of existing library yard into a new library garden as accessory space to the library. No change in use, egress, or occupancy.
B01174813-I1
06/17/2025
Filed — Alteration
B01174866-I1
05/09/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
04/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/26/2025
Permit issued — Structural
B00495369-I1-ST
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedC. D. E. Air-Conditioning01/05/2026
DOB NOWPlumbingSigned-offLouis L.buttermark & Sons11/24/2025
DOB NOWSupported ScaffoldSigned-offSasco Construction Svce07/16/2025
DOB NOWStructuralSigned-offSasco Construction Svce03/26/2025
DOB NOWSupported ScaffoldSigned-offSasco Construction Svce03/26/2025
DOB NOWPlumbingPermit IssuedLouis L.buttermark & Sons03/03/2025
DOB NOWMechanical SystemsPermit IssuedC. D. E. Air-Conditioning02/03/2025
DOB NOWPlumbingSigned-offLouis L.buttermark & Sons12/10/2024
DOB NOWStructuralSigned-offSasco Construction Svce10/07/2024
DOB NOWSidewalk ShedSigned-offSasco Construction Svce07/31/2024
DOB NOWSidewalk ShedSigned-offSasco Construction Svce07/15/2024
DOB NOWSidewalk ShedSigned-offSasco Construction Svce03/07/2024
DOB NOWSidewalk ShedSigned-offSasco Construction Svce03/07/2024
DOB NOWPlumbingPermit IssuedLouis L.buttermark & Sons03/07/2024
DOB NOWMechanical SystemsPermit IssuedC. D. E. Air-Conditioning03/04/2024
DOB NOWBoiler EquipmentSigned-offNational Mechanical Services Plumbing06/29/2021
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing06/29/2021
DOB NOWGeneral ConstructionPermit IssuedThe Metro Group03/15/2021
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing03/11/2021
DOB NOWBoiler EquipmentSigned-offNational Mechanical Services Plumbing03/11/2021
BISOTISSUEDC. D. E. Air-Conditioning07/02/2025
BISOTISSUEDC. D. E. Air-Conditioning05/06/2025
BISOTISSUEDC. D. E. Air-Conditioning05/06/2025
BISOTISSUEDC. D. E. Air-Conditioning09/11/2024
BISOTISSUEDC. D. E. Air-Conditioning09/11/2024
BISOTISSUEDSasco Construction Svce08/29/2024
BIS—ISSUEDInterboro Sign & Electric Maintenance03/21/2005
BIS—ISSUEDInterboro Sign & Electric Maintenance03/21/2005
BIS—ISSUEDInterboro Sign & Electric Maintenance03/21/2005
BISOTISSUEDJCH Delta Contracting08/18/2004
BISMHISSUEDMEC-Con Associates01/20/2004
BISOTISSUEDJCH Delta Contracting01/23/2003
BISPLISSUEDChinatown Plumbing & Heating09/11/2002
BISMHISSUEDMEC-Con Associates08/30/2002
BISMHISSUEDCSM Enterprises09/17/1998
BISPLISSUEDMJM Plumbing04/30/1998
BISOTISSUEDCSM Enterprises02/20/1998
BISOTISSUEDCSM Enterprises02/20/1998
BISEQISSUEDCSM Enterprises02/20/1998
BISPLISSUEDMetropolitan Heat & Power Co10/21/1996
1 project · most recent 09/22/2026
Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
09/22/2026Permit IssuedC. D. E. Air-ConditioningAir Conditioning Systems, Others
Cooling
Lg ARUM216BTE5 120,000 BTU · Vrf Outdoor ×5
LSU243HLV3 24,000 BTU · Condensing Unit ×5
Tempmaster ACCU-1 YE090C00A2GLB5 90,000 BTU ×5
Other
Tempmaster RTU-3 CH18T3DP2A1CGH34B3, RTU-4 CH20T3DP2A1CGH34B3 413,760 BTU ×10
1 project · most recent 04/16/2026
Gas
FiledStatusContractorScope
04/16/2026Permit IssuedLouis L.buttermark & SonsGas
5 projects · most recent 10/15/2026
General Wiring Boiler Controls
FiledStatusContractorScope
10/15/2026Permit IssuedG.S.H. ElectricGeneral Wiring
04/17/2026Permit IssuedG.S.H. ElectricGeneral Wiring
11/14/2024CancelledG.S.H. ElectricGeneral Wiring
04/02/2024CompleteOgc Electrical ContractorGeneral Wiring
03/25/2021CompleteResponse ElectricBoiler Controls
3 projects · most recent 11/13/2025
Steel
FiledStatusContractorScope
11/13/2025Signed-offSasco Construction SvceSteel
07/09/2025——1 scope_items
06/26/2025——1 scope_items
1 project · most recent 03/05/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/05/2024Signed-offSasco Construction SvceScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/04/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/04/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
09/24/2026HVAC and service water heating equipment Luis Riveraenergy_progress
09/24/2026HVAC insulation and sealing Luis Riveraenergy_progress
09/24/2026Mechanical SystemsLuis Riveraspecial
09/24/2026FinalLuis Riveraprogress
09/24/2026Energy Code Compliance InspectionsLuis Riveraprogress
09/24/2026Fire-Resistance Rated ConstructionLuis Riveraprogress
09/24/2026Maintenance informationLuis Riveraenergy_progress
09/24/2026HVAC and service water heating system controls Luis Riveraenergy_progress
09/24/2026Shutoff dampersLuis Riveraenergy_progress
04/16/2026Maintenance informationLuis Riveraenergy_progress
04/16/2026Shutoff dampersLuis Riveraenergy_progress
04/16/2026HVAC and service water heating equipment Luis Riveraenergy_progress
04/16/2026HVAC and service water heating system controls Luis Riveraenergy_progress
04/16/2026Mechanical SystemsLuis Riveraspecial
04/16/2026Energy Code Compliance InspectionsLuis Riveraprogress
04/16/2026FinalLuis Riveraprogress
04/16/2026Fire-Resistance Rated ConstructionLuis Riveraprogress
04/16/2026HVAC insulation and sealing Luis Riveraenergy_progress
12/18/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/18/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
12/18/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/18/2025FinalGEORGE GHEBRYALprogress
12/18/2025Structural Steel - WeldingGEORGE GHEBRYALspecial
11/03/2025Fire-Resistant Penetrations and JointsLuis Riveraspecial
10/14/2025Post-installed AnchorsGEORGE GHEBRYALspecial
Latest 25 of 38.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mapleton Branch LibraryGovernment / CivicEntire building
Project B01181879 Alteration · Approved · 07/09/2025
Project B01174861 Alteration · Approved · 06/26/2025
Project B01174813 Alteration · Approved · 06/24/2025
Project B01174866 Alteration · Approved · 06/17/2025
Project B00495369 Alteration · Permit Entire · 04/12/2021
Project B00495387 Alteration · Permit Entire · 04/12/2021
Project B00364269 Alteration · Objections · 07/13/2020
Project B00298838 Alteration · Permit Entire · 06/19/2020
Project B00298829 Alteration · Permit Entire · 05/11/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch9
09/01/2026B00495369-P1Request digital key ↗
09/01/2026B00495369-I1Request digital key ↗
08/25/2026B00937746-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026B00476261-I1Request digital key ↗
08/17/2026B00298838-I1Request digital key ↗
08/15/2026B00476261-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00476220-I1Request digital key ↗
09/01/2026B00476220-P2Request digital key ↗
09/01/2026B00476220-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00298829-P1Request digital key ↗
09/02/2026B00298829-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/01/2026B00476115-I1Request digital key ↗
08/15/2026B00476115-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00364269-I1Request digital key ↗
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION25
08/18/2025301912205Open ↗
08/18/2025301912170Open ↗
08/18/2025301912189Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION5
07/02/2025340772364Open ↗
08/29/2024340727789Open ↗
08/05/2024340727789Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/28/2024340727789Open ↗
08/28/2024340727789Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
09/10/2024340727789Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
08/29/2024340727789Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/27/2024340727789Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
07/08/2024340727789Open ↗
▸Seals & Professional Certifications56
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/02/2026B00298829-P1Open ↗
09/02/2026B00364269-I1Open ↗
09/01/2026B00476261-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
10/05/2026B00298829-P1Open ↗
10/05/2026B00298829-P1Open ↗
10/05/2026B00298829-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/05/2026B00298829-P1Open ↗
10/04/2026B00298829-I1Open ↗
09/23/2026B00476220-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/08/2020340772364Open ↗
05/07/2020322085248Open ↗
05/07/2020322085248Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/07/2020322085248Open ↗
05/07/2020322085248Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/08/2020340772364Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/12/2020340727789Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/07/2020322085248Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00476261-P1Open ↗
09/01/2026B00476261-I1Open ↗
09/01/2026B00476115-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/18/2026B00495387-I1Open ↗
08/13/2026B00495369-I1Open ↗
08/13/2026B00298838-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
04/08/2025340772364Open ↗
08/27/2024340727789Open ↗
03/21/2024322085248Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/28/2024340727789Open ↗
10/08/2020340772364Open ↗
05/12/2020340727789Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/07/2020322085248Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00476115-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/02/2025340772364Open ↗
05/28/2024340727789Open ↗
06/01/2021340727789Open ↗
Showing 3 of 5 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
05/10/2022301241467Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/21/2024322085248Open ↗
▸BIS* CONCRETE 27-6031
05/10/2022301241467Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/02/2026B00298829-P1Open ↗
09/02/2026B00364269-I1Open ↗
09/01/2026B00476261-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
09/02/2026B00298829-P1Open ↗
08/13/2026B00495387-I1Open ↗
08/13/2026B01174866-I1Open ↗
Showing 3 of 12 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
10/08/2020340772364Open ↗
05/12/2020340727789Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
09/01/2026B00495369-I1Open ↗
08/25/2026B00937746-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/24/2021300556306Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT4
04/20/2021340727789Open ↗
10/08/2020340772364Open ↗
05/12/2020340727789Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
08/27/2024340727789Open ↗
08/05/2024340727789Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
08/27/2024340727789Open ↗
08/05/2024340727789Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/15/2021340727789Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION6
07/08/2024340727789Open ↗
05/28/2024340727789Open ↗
10/12/2021340727789Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/08/2020340772364Open ↗
05/12/2020340727789Open ↗
▸BISEFILING COVER SHEET2
05/07/2020322085248Open ↗
05/07/2020322085248Open ↗
▸BISBOROUGH INTAKE FORM1
08/05/2024340727789Open ↗
▸Other Documents2
▸BISFEE EXEMPTION DOCUMENTATION1
10/08/2020340772364Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
05/10/2022301241467Open ↗