← Back
Over six families without stores
1703 TOPPING AVENUE
BRONX · BIN 2007350
💬 Discuss this project
1910Year Built
2Stories
C1Building Class
R7-1Zoning
3,290 sfGross Floor Area
8Units
Rent Stabilized3 Open Violations ▸
Over six families without stores · Owner of record: 1703 SZ DE LLC · 2,375 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 23p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Basement3p · 1 filing · 20 docs
1 job · most recent 02/10/2025
Sprinkler System
FiledStatusContractorScope
02/10/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 job · most recent 02/10/2025
Storm Water/Sanitary
FiledStatusContractorScope
02/10/2025Signed-offPRIME PIPING & HEATING INStorm, Water/Sanitary
2 jobs · most recent 12/03/2024
General Wiring
FiledStatusContractorScope
12/03/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
07/03/2024CompletePOWER DIRECT ELECTRIC INC—
1 job · most recent 02/10/2025
Steel
FiledStatusContractorScope
02/10/2025Signed-offH BUILDERS NYC LLCSteel
Building Lifecycle
All (106)Filed (9)Permit Issued (5)Signed Off (4)Violation (11)Inspection (9)Objection (38)Special Inspection (30)
04/22/2025
Violation issued (HPD, open)
C
04/22/2025
Violation issued (HPD, closed)
A
04/22/2025
Violation issued (HPD, closed)
A
04/22/2025
Violation issued (HPD, closed)
A
04/22/2025
Violation issued (HPD, closed)
C
04/22/2025
Violation issued (HPD, closed)
A
04/22/2025
Violation issued (HPD, closed)
A
04/22/2025
Violation issued (HPD, closed)
A
04/22/2025
Violation issued (HPD, open)
B
04/22/2025
Violation issued (HPD, open)
C
02/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERTING AN EXISTING TWO STORY AND BASEMENT, 1 UNIT BUILDING TO A TOTAL OF 9 RESIDENTIAL UNITS
X01038106-P4
02/06/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
02/06/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/06/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/06/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
02/06/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/06/2025
Special inspection requirement — Metering
FAHAD FATEH
02/06/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
02/06/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/06/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/06/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/27/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERTING AN EXISTING TWO STORY AND BASEMENT, 1 UNIT BUILDING TO A TOTAL OF 9 RESIDENTIAL UNITS
X01038106-P3
11/26/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/26/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/26/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/26/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/26/2024
Special inspection requirement — Air barrier — testing
FAHAD FATEH
11/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/26/2024
Special inspection requirement — Metering
FAHAD FATEH
11/26/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/26/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
11/26/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/11/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONVERTING AN EXISTING TWO STORY AND BASEMENT, 1 UNIT BUILDING TO A TOTAL OF 9 RESIDENTIAL UNITS
X01038106-S1
11/08/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONVERTING AN EXISTING TWO STORY AND BASEMENT, 1 UNIT BUILDING TO A TOTAL OF 9 RESIDENTIAL UNITS
X01038106-S4
11/01/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONVERTING AN EXISTING TWO STORY AND BASEMENT, 1 UNIT BUILDING TO A TOTAL OF 9 RESIDENTIAL UNITS
X01038106-S2
10/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/10/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONVERTING AN EXISTING TWO STORY AND BASEMENT, 1 UNIT BUILDING TO A TOTAL OF 9 RESIDENTIAL UNITS
X01038106-S3
10/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/10/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/29/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERTING AN EXISTING TWO STORY AND BASEMENT, 1 UNIT BUILDING TO A TOTAL OF 9 RESIDENTIAL UNITS
X01038106-P2
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/28/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/19/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/16/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERTING AN EXISTING TWO STORY AND BASEMENT, 1 UNIT BUILDING TO A TOTAL OF 9 RESIDENTIAL UNITS
X01038106-P1
08/15/2024
Permit issued — Mechanical Systems
X01038106-S2-MS
08/02/2024
Violation issued (ECB, closed)
Construction
07/31/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/22/2024
Permit issued — Plumbing
X01038106-S3-PL
07/22/2024
Permit issued — Sprinklers
X01038106-S4-EW-SP
Latest 60 of 106 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SCG CAPITAL2407/08/2026
1703 SZ DE LLC103/22/2026
H BUILDERS NYC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/04/2024$405K—Private party → 1703 SZ LLC$123/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT402/10/2025
VASILIOS ARTEMIOU PE408/29/2024
ROBERT SIQECA PE105/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDERS NYC LLCGeneral Contractor307/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616902/10/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offH BUILDERS NYC LLC08/15/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/22/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/22/2024
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC07/03/2024
DOB NOWStructuralSigned-offH BUILDERS NYC LLC06/21/2024
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/10/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/19/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/31/2024Pass-Final PL - UndergroundPassView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
02/06/2025Maintenance informationFAHAD FATEHenergy_progress
02/06/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/06/2025Permanent certificateFAHAD FATEHenergy_progress
02/06/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/06/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/06/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/06/2025Air barrier — testing FAHAD FATEHenergy_progress
02/06/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
02/06/2025MeteringFAHAD FATEHenergy_progress
02/06/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
02/06/2025Fenestration air leakageFAHAD FATEHenergy_progress
02/06/2025Interior lighting powerFAHAD FATEHenergy_progress
02/06/2025Fenestration areasFAHAD FATEHenergy_progress
11/26/2024Maintenance informationFAHAD FATEHenergy_progress
11/26/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/26/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/26/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/26/2024Fenestration air leakageFAHAD FATEHenergy_progress
11/26/2024Interior lighting powerFAHAD FATEHenergy_progress
11/26/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
11/26/2024Air barrier — testing FAHAD FATEHenergy_progress
11/26/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/26/2024MeteringFAHAD FATEHenergy_progress
11/26/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/26/2024Permanent certificateFAHAD FATEHenergy_progress
Latest 25 of 52.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026X01038106-P1Request digital key ↗
08/20/2026X01038106-S4Request digital key ↗
08/20/2026X01038106-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026X01038106-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026X01038106-S1Open ↗
08/26/2026X01038106-P2Open ↗
08/25/2026X01038106-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026X01038106-S4Open ↗
08/20/2026X01038106-S2Open ↗
08/20/2026X01038106-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/18/2026X01038106-S4Open ↗
09/01/2026X01038106-S1Open ↗
08/26/2026X01038106-P2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026X01038106-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026X01038106-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026X01038106-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026X01038106-S4Open ↗
08/20/2026X01038106-S3Open ↗
08/20/2026X01038106-S2Open ↗
Showing 3 of 9 on file for this type
▸Other Documents8
▸DOB NOWSite Survey: Initial4
08/20/2026X01038106-P1Open ↗
08/20/2026X01038106-P4Open ↗
08/20/2026X01038106-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026X01038106-P1Open ↗
08/20/2026X01038106-P4Open ↗
08/20/2026X01038106-P3Open ↗
Showing 3 of 4 on file for this type