← Back
BuildNYC
Three families
1704 POPHAM AVENUE
BRONX · BIN 2008923
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R5Zoning
7,400 sfGross Floor Area
3Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Three families · 6,690 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWest 176th St5p · 1 filing · 20 docs
Floor 3West 176th St70p · 1 filing · 20 docs
Floor 2West 176th St72p · 1 filing · 20 docs
Floor 1West 176th St84p · 1 filing · 20 docs
BasementWest 176th St72p · 1 filing · 20 docs
Site & exteriorWest 176th St51p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SCG Realty2710/13/2026
SCG Capital703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2025$1.4M—Private party → 1704 YS LLC$189/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nikolai Katz Architect609/16/2026
Vasilios Artemiou PE908/07/2026
Robert Siqeca PE201/20/2026
Anetonne Architecture203/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H Builders NYCGeneral Contractor607/08/2026
H Builders NYCScaffold303/21/2026
Prime Piping & HeatingPlumbing106/28/2026
Prime Piping & HeatingFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI Consulting Services89041209/16/2026
Building Lifecycle
09/16/2026
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01269626-I1.
X01269626-A5
09/16/2026
Special inspection requirement — Exterior lighting power
MD ISLAM
09/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MD ISLAM
09/16/2026
Special inspection requirement — Interior lighting power
MD ISLAM
09/16/2026
Special inspection requirement — Fenestration air leakage
MD ISLAM
90 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPrime Piping & Heating04/21/2026
DOB NOWPlumbingSigned-offPrime Piping & Heating04/21/2026
DOB NOWConstruction FenceSigned-offH Builders NYC02/05/2026
DOB NOWStructuralSigned-offH Builders NYC02/03/2026
DOB NOWFoundationSigned-offH Builders NYC02/02/2026
DOB NOWMechanical SystemsSigned-offH Builders NYC01/27/2026
DOB NOWGeneral ConstructionPermit IssuedH Builders NYC01/21/2026
1 project · most recent 09/16/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/16/2026Signed-offH Builders NYCHeating and Air Conditioning Systems
1 project · most recent 09/16/2026
Sprinkler System
FiledStatusContractorScope
09/16/2026Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 09/16/2026
Water/Sanitary
FiledStatusContractorScope
09/16/2026Signed-offPrime Piping & HeatingWater/Sanitary
1 project · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026Permit IssuedHivolts ElectricalGeneral Wiring
1 project · most recent 09/16/2026
Wood
FiledStatusContractorScope
09/16/2026Signed-offPrime Piping & HeatingWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/01/2026Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
09/16/2026Lighting controlsMD ISLAMenergy_progress
09/16/2026Electrical motors and elevatorsMD ISLAMenergy_progress
09/16/2026Exterior lighting powerMD ISLAMenergy_progress
09/16/2026Fenestration and door U-factor and product ratingsMD ISLAMenergy_progress
09/16/2026Interior lighting powerMD ISLAMenergy_progress
09/16/2026Fenestration areasMD ISLAMenergy_progress
09/16/2026Fenestration air leakageMD ISLAMenergy_progress
09/16/2026Lighting in dwelling unitsMD ISLAMenergy_progress
09/16/2026Fire-Resistance Rated ConstructionMD ISLAMprogress
09/16/2026Energy Code Compliance InspectionsMD ISLAMprogress
09/16/2026Structural Stability – Alterations of existing buildingsMD ISLAMspecial
09/16/2026Fire-Resistant Penetrations and JointsMD ISLAMspecial
09/16/2026MeteringMD ISLAMenergy_progress
09/16/2026Air barrier - visual inspectionMD ISLAMenergy_progress
09/16/2026Maintenance informationMD ISLAMenergy_progress
08/28/2026Post-installed AnchorsMD ISLAMspecial
08/28/2026Duct leakage testing, insulation and designMD ISLAMenergy_progress
08/28/2026HVAC-R and service water heating system controlsMD ISLAMenergy_progress
08/28/2026Shutoff dampersMD ISLAMenergy_progress
08/28/2026HVAC-R and service water heating equipmentMD ISLAMenergy_progress
08/28/2026Maintenance informationMD ISLAMenergy_progress
08/28/2026Energy Code Compliance InspectionsMD ISLAMprogress
08/28/2026FinalMD ISLAMprogress
08/28/2026Structural Stability – Alterations of existing buildingsMD ISLAMspecial
08/28/2026Mechanical SystemsMD ISLAMspecial
Latest 25 of 110.
156 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account