← Back
BuildNYC
Five to six families
1705 PALMETTO STREET
QUEENS · Ridgewood · BIN 4082487
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R6BZoning
5,700 sfGross Floor Area
6Units
Rent Stabilized1 Active Violation ▸
Five to six families · Owner of record: 1705 Palmetto · 2,800 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Unit 3A, Unit 3L17p · 2 filings · 20 docs
Floor 2
Floor 1Unit 1L, Unit 1R11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1705 Palmetto203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/03/2020$1.0M—Private party → 1705 PALMETTO LLC$180/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Frank S Caminiti, RA508/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P.wolfe Consultants1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Paltas ServicesGeneral Contractor303/21/2026
A & A Plumbing SystemsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129408/15/2023
Building Lifecycle
11/10/2026
Boiler inspection report filed
Initial · no defects · Payment Verification In Progress
11/28/2025
Boiler inspection report filed
Initial · no defects · Accepted
01/26/2025
§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF BOLT WITH EYE CAPABLE OF BEING PADLOCKED AT BULKHEAD DOOR AT PUBLIC HALL AT 3RD…
HPD violation · open
11/07/2024
Boiler inspection report filed
Initial · no defects · Accepted
02/15/2024
Signed off — Alteration
FILING HEREWITH TO RENOVATE THE FIRST AND THIRD FLOORS, INCLUDING BUT NOT LIMITED TO COMBINING/RE-LAYOUT OF SPACES. REMOVAL/ INSTALLATION OF NON-LOAD BEARING WALLS, AS PER SUBMITTED PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q00819007-I1
44 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA & A Plumbing Systems07/19/2023
DOB NOWGeneral ConstructionSigned-offPaltas Services07/18/2023
1 project · most recent 07/12/2023
General Wiring
FiledStatusContractorScope
07/12/2023Permit IssuedGemini ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/07/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
08/28/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
08/28/2023FinalFrank Caminitiprogress
08/15/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
08/15/2023FinalFrank Caminitiprogress
08/15/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account