← Back
Single or multiple dwelling with stores or offices
1706 CHURCH AVENUE
BROOKLYN · Flatbush · BIN 3117078
💬 Discuss this project
1910Year Built
3Stories
S9Building Class
R7AZoning
5,550 sfGross Floor Area
7Units
Rent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: LINCE PLUS, LLC · 2,025 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Floor 32p · 1 filing · 2 docs
Floor 22p · 1 filing · 2 docs
Floor 19p · 3 filings · 20 docs
Site & exterior9p · 3 filings · 9 docs
Filed — no permit issued19p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HD CONTRACTORS907/08/2026
1708 CHURCH AVENUE PROPERTIES703/22/2026
LINCE PLUS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JD DESIGN ASSOCIATES INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HD CONTRACTORS CORPGeneral Contractor907/08/2026
TRISTAR DEVELOPING INCGeneral Contractor203/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing207/08/2026
THOMAS JOCELYN IIIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCHENERY TESTING LAB9181206/07/2024
KCE CONSULTING ENGINEERIN3712111/11/2022
BUTTERFIELD & O'CONNOR4189105/09/2022
Building Lifecycle
All (80)Filed (11)Permit Issued (8)Signed Off (6)Violation (31)Inspection (4)Special Inspection (20)
11/24/2025
Violation issued (HPD, closed)
I
08/22/2024
Signed off — Alteration
RE POINTING AND CORNICE REPAIR AS PER PLAN. NO CHANGE IN USE, OCCUPANCY WITH THIS APPLICATION.
B01048493-I1
08/21/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B01049181-I1
06/13/2024
Permit issued — General Construction
B01048493-I1-GC
06/07/2024
Filed — Alteration
RE POINTING AND CORNICE REPAIR AS PER PLAN. NO CHANGE IN USE, OCCUPANCY WITH THIS APPLICATION.
B01048493-I1
05/10/2024
Permit issued — Sidewalk Shed
B01049181-I1-SH
05/09/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B01049181-I1
05/08/2024
Special inspection requirement — Final
TREVOR O. FLOWERS
05/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
05/08/2024
Special inspection requirement — Masonry
TREVOR O. FLOWERS
11/28/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/11/2022
Filed — Alteration
B00757507-I1
11/11/2022
Special inspection requirement — Construction Operations Influencing Adjacent Structures
09/01/2022
Signed off — Alteration
B00709413-I1
09/01/2022
Signed off — Alteration
POINTING AS PER PLAN. NO CHANGE IN USE , EGRESS OR OCCUPANCY WITH THIS APPLICATION.
B00720112-I1
06/23/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
06/21/2022
Permit issued — Sidewalk Shed
B00709413-I1-SH
06/14/2022
Special inspection requirement — Structural Steel - Details
Kemba Walcott
06/14/2022
Special inspection requirement — Post-installed Anchors
Kemba Walcott
06/14/2022
Special inspection requirement — Structural Wood Frame
Kemba Walcott
06/14/2022
Special inspection requirement — Final
Kemba Walcott
06/14/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Kemba Walcott
06/14/2022
Special inspection requirement — Structural Steel - Welding
Kemba Walcott
05/17/2022
Permit issued — General Construction
B00720112-I1-GC
05/09/2022
Filed — Alteration
POINTING AS PER PLAN. NO CHANGE IN USE , EGRESS OR OCCUPANCY WITH THIS APPLICATION.
B00720112-I1
03/31/2022
Permit issued — Sidewalk Shed
B00709413-I1-SH
03/30/2022
Filed — Alteration
B00709413-I1
11/19/2021
Signed off — Alteration
PLUMBING WORK FOR EXISTING STORE ON 1ST FLOOR AND CELLAR.
B00559306-I1
11/08/2021
Special inspection requirement — Maintenance information
Erik Street
11/05/2021
Filed — Alteration
PLUMBING WORK FOR EXISTING STORE ON 1ST FLOOR AND CELLAR.
B00559306-P2
11/04/2021
Special inspection requirement — Maintenance information
Erik Street
11/02/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/01/2021
Signed off — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PARTITION WORK ON 1ST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00559299-I1
10/28/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2021
Special inspection requirement — Interior lighting power
Erik Street
10/26/2021
Special inspection requirement — Lighting controls
Erik Street
10/25/2021
Permit issued — Plumbing
B00559306-I1-PL
10/22/2021
Filed — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PARTITION WORK ON 1ST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00559299-P2
10/22/2021
Special inspection requirement — Lighting controls
Erik Street
10/22/2021
Special inspection requirement — Interior lighting power
Erik Street
09/08/2021
Filed — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PARTITION WORK ON 1ST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00559299-P1
09/07/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/01/2021
Special inspection requirement — Interior lighting power
Erik Street
09/01/2021
Special inspection requirement — Lighting controls
Erik Street
08/13/2021
Filed — Alteration
PLUMBING WORK FOR EXISTING STORE ON 1ST FLOOR AND CELLAR.
B00559306-P1
08/13/2021
Special inspection requirement — Maintenance information
Erik Street
07/22/2021
Permit issued — Plumbing
B00559306-I1-PL
07/22/2021
Permit issued — General Construction
B00559299-I1-GC
07/19/2021
Filed — Alteration
PLUMBING WORK FOR EXISTING STORE ON 1ST FLOOR AND CELLAR.
B00559306-I1
07/19/2021
Filed — Alteration
INTERIOR RENOVATION EXISTING STORE WITH PARTITION WORK ON 1ST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00559299-I1
04/21/2021
Violation issued (HPD, closed)
I
11/01/2018
Violation issued (HPD, closed)
I
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/11/2009
Violation issued (ECB, closed)
Boilers
09/11/2009
Violation issued (ECB, open)
Boilers
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHD CONTRACTORS CORP06/13/2024
DOB NOWSidewalk ShedSigned-offHD CONTRACTORS CORP05/10/2024
DOB NOWSidewalk ShedSigned-offHD CONTRACTORS CORP06/21/2022
DOB NOWGeneral ConstructionSigned-offHD CONTRACTORS CORP05/17/2022
DOB NOWSidewalk ShedSigned-offHD CONTRACTORS CORP03/31/2022
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP10/25/2021
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP07/22/2021
DOB NOWGeneral ConstructionSigned-offTRISTAR DEVELOPING INC07/22/2021
BISFPISSUEDNY FIRETECH INC10/10/2018
BISMHISSUEDPROSPERITY CONSTRUCTION*06/15/2018
BISPLISSUEDSO PLUMBING & HEATING INC03/26/2018
BISEQISSUEDPROSPERITY CONSTRUCTION*03/16/2018
BISOTISSUEDPROSPERITY CONSTRUCTION*03/16/2018
BISFPISSUEDIDEAL FIRE CONTROL INC08/23/2005
BISFPISSUEDARROW MECHANICAL SYSTEMS06/09/1993
3 projects · most recent 10/20/2023
General Wiring
FiledStatusContractorScope
10/20/2023Permit IssuedSCIENTIFIC ELEC. CO. INC5 meters, 2 new_meters
10/25/2018CompleteKJK ELECTRIC INC4 meters, 4 new_meters
10/25/2018CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/02/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/07/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/08/2024FinalTREVOR O. FLOWERSprogress
05/08/2024Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
05/08/2024MasonryTREVOR O. FLOWERSspecial
11/11/2022Construction Operations Influencing Adjacent Structures—special
06/23/2022Structural Stability – Alterations of existing buildingsKemba Walcottspecial
06/14/2022Structural Steel - DetailsKemba Walcottspecial
06/14/2022Post-installed AnchorsKemba Walcottspecial
06/14/2022Structural Wood FrameKemba Walcottprogress
06/14/2022FinalKemba Walcottprogress
06/14/2022Structural Steel - High Strength BoltingKemba Walcottspecial
06/14/2022Structural Steel - WeldingKemba Walcottspecial
11/08/2021Maintenance informationErik Streetenergy_progress
11/04/2021Maintenance informationErik Streetenergy_progress
10/26/2021Interior lighting powerErik Streetenergy_progress
10/26/2021Lighting controlsErik Streetenergy_progress
10/22/2021Lighting controlsErik Streetenergy_progress
10/22/2021Interior lighting powerErik Streetenergy_progress
09/01/2021Interior lighting powerErik Streetenergy_progress
09/01/2021Lighting controlsErik Streetenergy_progress
08/13/2021Maintenance informationErik Streetenergy_progress
▾Documents — 130 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026B00559299-P2Request digital key ↗
09/01/2026B00559299-I1Request digital key ↗
09/01/2026B00559299-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION10
08/07/2018321480125Open ↗
07/19/2018340589410Open ↗
07/16/2018340589410Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION6
10/12/2018321480125Open ↗
03/26/2018340589410Open ↗
03/26/2018340589410Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
10/10/2018340589410Open ↗
10/10/2018340589410Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00559306-P1Open ↗
09/01/2026B00559299-P1Open ↗
09/01/2026B00559299-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00559299-I1Open ↗
09/01/2026B00559299-P1Open ↗
09/01/2026B00559299-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026B00757507-I1Open ↗
08/28/2026B00757507-I1Open ↗
08/28/2026B00757507-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/10/2019340589410Open ↗
08/22/2012320609383Open ↗
08/21/2012320609374Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/22/2012320609383Open ↗
08/21/2012320609374Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/22/2012320609383Open ↗
08/21/2012320609374Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/13/2018340589410Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/13/2018340589410Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/13/2018340589410Open ↗
▸Trade Schedules & Equipment11
▸BISRPZ/DDCV TEST REPORT : GEN215B6
08/22/2012320609383Open ↗
08/22/2012320609383Open ↗
08/22/2012320609383Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING2
07/16/2018340589410Open ↗
03/13/2018340589410Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/15/2018340589410Open ↗
07/26/2018340589410Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/16/2018321480125Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/07/2018321480125Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00559299-I1Open ↗
09/01/2026B00559299-P1Open ↗
09/01/2026B00559299-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/07/2018321480125Open ↗
03/13/2018340589410Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/26/2018340589410Open ↗
03/13/2018340589410Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/31/2026B00559306-I1Open ↗
08/13/2026B00559299-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/10/2019340589410Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/13/2018340589410Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/10/2019340589410Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/26/2018340589410Open ↗
03/13/2018340589410Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/10/2019340589410Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION8
01/06/2014320426142Open ↗
01/06/2014320426142Open ↗
01/06/2014320426142Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
08/21/2012320609383Open ↗
08/21/2012320609374Open ↗
01/23/2012320426142Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/10/2019340589410Open ↗
11/16/2018321480125Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
09/10/2019340589410Open ↗
11/16/2018321480125Open ↗
08/07/2018321480125Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET4
08/07/2018321480125Open ↗
08/22/2012320609383Open ↗
08/21/2012320609374Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
10/31/2018340589410Open ↗
07/19/2018340589410Open ↗
▸BISBOROUGH INTAKE FORM2
09/10/2019340589410Open ↗
11/16/2018321480125Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/13/2018340589410Open ↗
▸Other Documents2
▸BISPlot Diagram2
01/06/2014320426142Open ↗
01/06/2014320426142Open ↗