RoofUnder Construction79p · 5 filings · 20 docs
EquipmentMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Structural
OUTRIGGERS SYSTEM INSTALLATION FOR FACADE REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
INSTALLATION OF 7,000 LB DUAL PERSONNEL HOIST CARS @ EAST AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
4 documents · 1 drawing sheet
INSTALLATION OF 7,100 LB DUAL PERSONNEL HOIST CARS @ WEST AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 59Under Construction21p · 1 filing · 20 docs
Plumbing
Issued Permit Scope
Plumbing
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Floor 58Under Construction34p · 3 filings · 20 docs
Fire ProtectionPlumbing
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Floor 57Under Construction37p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 56Under Construction37p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 55Under Construction39p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 3 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 54Under Construction89p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 53Under Construction89p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 52Under Construction89p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 51Under Construction89p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 50Under Construction89p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 49Under Construction89p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 48Under Construction93p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 4 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 47Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 46Under Construction92p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 3 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 45Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 44Under Construction90p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 43Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 42Under Construction90p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 41Under Construction90p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 40Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 39Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 38Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 37Under Construction90p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 36Under Construction90p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 35Under Construction89p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 34Under Construction90p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 33Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 32Under Construction92p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 3 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 31Under Construction93p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 4 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 30Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 29Under Construction91p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 28Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 27Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 26Under Construction88p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 25Under Construction88p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 24Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 23Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 22Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 21Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 20Under Construction88p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 19Under Construction89p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 18Under Construction88p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 17Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 16Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 15Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 14Under Construction87p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 13Under Construction92p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 4 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 12Under Construction89p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 11Under Construction89p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 2 drawing sheets
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 10Under Construction88p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 9Under Construction88p · 5 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
On file for this job
5 documents
Latest 3 of 5 filings on this floor.
Floor 8Under Construction89p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Latest 3 of 4 filings on this floor.
Floor 7Under Construction92p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
INSTALLATION OF 7,100 LB DUAL PERSONNEL HOIST CARS @ WEST AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
4 documents · 1 drawing sheet
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 6Under Construction92p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 5 drawing sheets
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Latest 3 of 4 filings on this floor.
Floor 5Under Construction92p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 5 drawing sheets
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Latest 3 of 4 filings on this floor.
Floor 4Under Construction92p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 5 drawing sheets
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Latest 3 of 4 filings on this floor.
Floor 3Under Construction96p · 5 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 6 drawing sheets
This application is filed for a Temporary Use permit (field offices and shanties) pursuant to section AC28-111 and building Bulletin 2010-002.
On file for this job
2 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2Under Construction98p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
INSTALLATION AND USE TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 5 drawing sheets
This application is filed for a Temporary Use permit (field offices and shanties) pursuant to section AC28-111 and building Bulletin 2010-002.
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 1Under Construction127p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 7 drawing sheets
This application is filed for a Temporary Use permit (field offices and shanties) pursuant to section AC28-111 and building Bulletin 2010-002.
On file for this job
2 documents · 1 drawing sheet
INSTALLATION OF VERTICAL WALL FORMWORK AND PLATFORMS.
On file for this job
5 documents
MezzanineUnder Construction83p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 4 drawing sheets
CellarUnder Construction129p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Support of Excavation
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 9 drawing sheets
No filed description on record for this job.
On file for this job
30 documents · 1 drawing sheet
Sub-CellarUnder Construction127p · 1 filing · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Superstructure construction for a new building as indicated on the attached drawings.
On file for this job
310 documents · 8 drawing sheets