← Back
One family attached or semi-detached
170A CONTINENTAL PLACE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5093561
💬 Discuss this project
1989Year Built
2Stories
A5Building Class
R3-2Zoning
1,040 sfGross Floor Area
1Units
One family attached or semi-detached · 880 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
StructuralElectrical
Roof2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/03/2024
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
07/10/2024
Permit issued — Solar
S01072755-I1-SL
07/03/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01072755-I1
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/26/2024
Special inspection requirement — Final
Walid Abdulla
06/26/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/10/2024
1 project · most recent 07/03/2024
FiledStatusContractorScope
07/03/2024CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 07/03/2024
FiledStatusContractorScope
07/03/2024Signed-offSUNRUN INSTALLATION SVC8 panels, 3.2 kw, 169.1 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/26/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/26/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/26/2024Energy Code Compliance InspectionsWalid Abdullaprogress
06/26/2024FinalWalid Abdullaprogress
06/26/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01072755-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S01072755-I1Open ↗
09/01/2026S01072755-I1Open ↗
09/01/2026S01072755-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01072755-I1Open ↗
09/01/2026S01072755-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026S01072755-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01072755-I1Open ↗