BuildNYC
Public elementary, junior or senior high
P.S. 80 the Thurgood Marshall Magnet School of Multimedia and Communication
171-05 137TH AVENUE · BIN 4270056
💬 Discuss this project
1963Year Built
3Stories
W1Building Class
R6Zoning
94,794 sfGross Floor Area
5Units
LL97 Covered12 Active Violations 0 unresolved · 12 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 108,900 sf lot · 0.87 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 80 the Thurgood Marshall Magnet School of Multimedia anUnder Construction40p · 2 filings · 20 docs
Floor 3P.S. 80 the Thurgood Marshall Magnet School of Multimedia anUnder Construction4p · 1 filing · 20 docs
Floor 2P.S. 80 the Thurgood Marshall Magnet School of Multimedia anUnder Construction45p · 3 filings · 20 docs
Floor 1P.S. 80 the Thurgood Marshall Magnet School of Multimedia anUnder Construction46p · 4 filings · 20 docs
CellarP.S. 80 the Thurgood Marshall Magnet School of Multimedia anUnder Construction13p · 3 filings · 20 docs
Site & exteriorP.S. 80 the Thurgood Marshall Magnet School of Multimedia anUnder Construction46p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority11110/17/2026
NYC Department of Parks and Recreation1503/22/2026
National Grid103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Urbahn Architects503/21/2026
Bladykas Engineering2003/21/2026
Socotec403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maric Mechanicalspecialty_contractor3607/08/2026
Maric MechanicalScaffold1907/08/2026
Forsythe P&HPlumbing508/25/2026
Archinova BuildersGeneral Contractor407/08/2026
N.B.A. ConstructionGeneral Contractor407/08/2026
Panili Plumbing & HeatingPlumbing307/08/2026
A&H Express Plumbing & HeatingPlumbing310/04/2026
Charan Electrical Enterp'sElectrical203/22/2026
Core Electric MEP IndsElectrical103/22/2026
Brandl ElectricElectrical103/21/2026
Prince ElectricElectrical103/21/2026
A & S ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4003110/16/2026
MP Engineers & Architects1438111/09/2023
Building Lifecycle
All (229)Filed (36)Permit Issued (61)Violation (60)Inspection (8)Objection (34)Special Inspection (30)
10/16/2026
Filed — Alteration
PS 80Q - Domestic Water Piping, Gas Piping, and Domestic Water Heater associated with boiler replacement. No change in use, egress, or occupancy.
Q00702253-P6
09/15/2026
Filed — Alteration
Room renovations - Multimedia room 219 and 223 along with ceiling patchwork in rooms 115 and 116
Q00943613-P6
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
08/24/2026
Permit issued — Plumbing
Q00702253-S2-PL
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/13/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/06/2026
Filed — Alteration
Room renovations - Multimedia room 219 and 223 along with ceiling patchwork in rooms 115 and 116
Q00943613-P5
06/09/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
06/09/2026
Special inspection requirement — Interior lighting power
NELSON LOPEZ
06/09/2026
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
06/09/2026
Special inspection requirement — Heating Systems
NELSON LOPEZ
06/09/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
06/09/2026
Special inspection requirement — Chimneys and vents
NELSON LOPEZ
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
06/09/2026
Special inspection requirement — Lighting controls
NELSON LOPEZ
06/09/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
06/09/2026
Special inspection requirement — Final
NELSON LOPEZ
06/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
NELSON LOPEZ
06/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
06/09/2026
Special inspection requirement — Electrical motors and elevators
NELSON LOPEZ
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
06/08/2026
Filed — Alteration
PS 80Q - Domestic Water Piping, Gas Piping, and Domestic Water Heater associated with boiler replacement. No change in use, egress, or occupancy.
Q00702253-P8
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
05/29/2026
Special inspection requirement — Heating Systems
NELSON LOPEZ
05/29/2026
Special inspection requirement — Final
NELSON LOPEZ
05/29/2026
Special inspection requirement — Chimneys and vents
NELSON LOPEZ
05/29/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
05/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
05/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
05/29/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
05/29/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
05/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
05/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2026
Permit issued — General Construction
Q00692508-I1-GC
05/08/2026
Permit issued — Structural
Q00702253-S4-ST
05/08/2026
Permit issued — General Construction
Q00702253-S3-GC
05/08/2026
Permit issued — Mechanical Systems
Q00702253-I1-MS
05/04/2026
Permit issued — Plumbing
Q00805709-S1-PL
04/30/2026
Filed — Alteration
Room renovations - Multimedia room 219 and 223 along with ceiling patchwork in rooms 115 and 116
Q00943613-P4
03/06/2026
Objection raised — Other
03/04/2026
Violation issued (FDNY_NOV, closed)
03/02/2026
Filed — Alteration
Q00805709-P2
02/13/2026
Permit issued — Plumbing
Q00943613-S1-PL
02/13/2026
Objection raised — Plumbing
02/03/2026
Filed — Alteration
Room renovations - Multimedia room 219 and 223 along with ceiling patchwork in rooms 115 and 116
Q00943613-P3
01/27/2026
Permit issued — General Construction
Q00943613-I1-GC
12/22/2025
Permit issued — Plumbing
Q00955926-I1-PL
10/23/2025
Violation issued (ECB, open)
Construction
10/23/2025
Violation issued (ECB, open)
Construction
10/23/2025
Violation issued (ECB, open)
Construction
Latest 60 of 229 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedForsythe P&H08/24/2026
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical05/08/2026
DOB NOWStructuralPermit IssuedMaric Mechanical05/08/2026
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical05/08/2026
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical05/08/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating05/04/2026
DOB NOWPlumbingPermit IssuedPanili Plumbing & Heating02/13/2026
DOB NOWGeneral ConstructionPermit IssuedN.B.A. Construction01/27/2026
DOB NOWPlumbingPermit IssuedPanili Plumbing & Heating12/22/2025
DOB NOWGeneral ConstructionPermit IssuedArchinova Builders09/29/2025
DOB NOWPlumbingPermit IssuedForsythe P&H09/22/2025
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical07/16/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical07/16/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating04/28/2025
DOB NOWSupported ScaffoldPermit IssuedMaric Mechanical04/07/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/19/2025
DOB NOWSupported ScaffoldPermit IssuedMaric Mechanical03/19/2025
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/19/2025
DOB NOWStructuralPermit IssuedMaric Mechanical03/19/2025
DOB NOWGeneral ConstructionPermit IssuedArchinova Builders02/24/2025
DOB NOWPlumbingPermit IssuedPanili Plumbing & Heating02/11/2025
DOB NOWGeneral ConstructionPermit IssuedN.B.A. Construction01/17/2025
DOB NOWConstruction FencePermit IssuedMaric Mechanical01/17/2025
DOB NOWSupported ScaffoldPermit IssuedMaric Mechanical01/16/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical01/16/2025
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical01/16/2025
DOB NOWMechanical SystemsSigned-offMaric Mechanical01/16/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical01/16/2025
DOB NOWStructuralPermit IssuedMaric Mechanical01/16/2025
DOB NOWGeneral ConstructionPermit IssuedArchinova Builders01/13/2025
DOB NOWBoiler EquipmentSigned-offChampion Combustion01/03/2025
DOB NOWPlumbingPermit IssuedForsythe P&H10/21/2024
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical06/18/2024
DOB NOWPlumbingPermit IssuedAggressive Fire Protection04/12/2024
DOB NOWGeneral ConstructionPermit IssuedArchinova Builders04/11/2024
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/22/2024
DOB NOWConstruction FencePermit IssuedMaric Mechanical03/22/2024
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical03/19/2024
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/19/2024
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/19/2024
+ 30 more permits on file
1 project · most recent 10/16/2026
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
10/16/2026Permit IssuedMaric MechanicalAssociated Ducts and Piping
Ducts & Piping
— Greenheck 480 CFM · Exhaust Fan ×3
3 projects · most recent 10/16/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
10/16/2026Permit IssuedForsythe P&HGas, Water/Sanitary
09/15/2026Permit IssuedPanili Plumbing & HeatingWater/Sanitary
06/27/2025Permit IssuedPanili Plumbing & HeatingStorm, Water/Sanitary
19 projects · most recent 10/16/2026
General Wiring
FiledStatusContractorScope
10/16/2026CompleteA & S Electric—
04/27/2026Permit IssuedJK ElectricalGeneral Wiring
04/11/2026Permit IssuedJK ElectricalGeneral Wiring
03/28/2026Permit IssuedDVM Electrical ServicesGeneral Wiring
07/09/2025Permit IssuedEverest ElectricGeneral Wiring
01/07/2025CompleteMNBC ElectricalGeneral Wiring
11/22/2024CompleteCharan Electrical Enterp's—
04/19/2024CompleteMNBC ElectricalGeneral Wiring
01/03/2024CompleteGemini Electric Co—
08/04/2023CompleteUrban ElectricalGeneral Wiring
05/09/2023CompleteTribeca ElectricalGeneral Wiring
01/10/2023CompleteTribeca Electrical—
12/07/2022CompleteTribeca Electrical—
08/17/2021CompleteCore Electric MEP IndsGeneral Wiring
01/21/2020CompleteCharan Electrical Enterp's—
2 projects · most recent 10/16/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/16/2026Permit IssuedForsythe P&HSteel, Concrete, Masonry
09/15/2026Permit IssuedPanili Plumbing & Heating1 scope_items
1 project · most recent 08/01/2024
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
08/01/2024Permit IssuedMaric MechanicalFence, Scaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/13/2025Fail-Final Boiler Equipment InspectionFailView ↗
04/03/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 131
DateRequirementInspectorRole
09/08/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/14/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
06/09/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
06/09/2026Mechanical SystemsNELSON LOPEZspecial
06/09/2026Heating SystemsNELSON LOPEZspecial
06/09/2026FinalNELSON LOPEZprogress
06/09/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
06/09/2026Shutoff dampersNELSON LOPEZenergy_progress
06/09/2026Maintenance informationNELSON LOPEZenergy_progress
06/09/2026Lighting controlsNELSON LOPEZenergy_progress
06/09/2026Electrical motors and elevatorsNELSON LOPEZenergy_progress
06/09/2026Interior lighting powerNELSON LOPEZenergy_progress
06/09/2026HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
06/09/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
06/09/2026Duct leakage testing, insulation and designNELSON LOPEZenergy_progress
06/09/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
06/09/2026Chimneys and ventsNELSON LOPEZspecial
06/09/2026Post-installed AnchorsNELSON LOPEZspecial
05/29/2026Interior lighting powerNELSON LOPEZenergy_progress
05/29/2026Lighting controlsNELSON LOPEZenergy_progress
05/29/2026Duct leakage testing, insulation and designNELSON LOPEZenergy_progress
05/29/2026Electrical motors and elevatorsNELSON LOPEZenergy_progress
05/29/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
05/29/2026Maintenance informationNELSON LOPEZenergy_progress
05/29/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
Latest 25 of 131.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 80 the Thurgood Marshall Magnet School of Multimedia and CommunicationEducationEntire building
Project Q00955926 Alteration · Permit Entire · 11/09/2023
Project Q00943613 Alteration · Permit Entire · 10/16/2023
Project Q00919275 Alteration · Approved · 09/12/2023
Project Q00805709 Alteration · Permit Entire · 12/29/2022
Project Q08009458 Alteration · Permit Entire · 09/27/2022
Project Q00702253 Alteration · Permit Entire · 03/23/2022
Project Q00692508 Alteration · Permit Entire · 03/09/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 280 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch35
08/24/2026Q08009458-P3Request digital key ↗
08/24/2026Q08009458-P1Request digital key ↗
08/24/2026Q08009458-S3Request digital key ↗
Showing 3 of 35 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
01/19/2024440815307Open ↗
10/04/2007410011295Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
04/05/2024440815307Open ↗
01/17/2024440815307Open ↗
▸BISWORK PERMIT APPLICATION1
04/18/2008410011295Open ↗
▸Seals & Professional Certifications85
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/23/2026Q00943613-P6Open ↗
08/24/2026Q08009458-S2Open ↗
08/24/2026Q08009458-S1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
10/06/2026Q00702253-S2Open ↗
09/23/2026Q00943613-P6Open ↗
09/23/2026Q00702253-S5Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
10/06/2026Q00702253-S2Open ↗
10/06/2026Q00702253-S2Open ↗
09/23/2026Q00702253-S5Open ↗
Showing 3 of 19 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/17/2024440815307Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/17/2024440815307Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/04/2007410011295Open ↗
▸Safety & Tenant Protection7
▸DOB NOWNYCSCA - Approved Site Safety Plans5
08/13/2026Q08009458-P3Open ↗
08/13/2026Q08009458-I1Open ↗
08/13/2026Q08009458-P4Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
04/01/2024440815307Open ↗
01/17/2024440815307Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026Q08009458-P2Open ↗
08/14/2026Q08009458-S2Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/30/2007410011295Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/17/2024440815307Open ↗
▸Approvals, Objections & Sign-offs92
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter36
09/23/2026Q00943613-P6Open ↗
08/19/2026Q00955926-I1Open ↗
08/17/2026Q00943613-P1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)36
09/23/2026Q00943613-P6Open ↗
08/19/2026Q00955926-I1Open ↗
08/17/2026Q00943613-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)9
08/24/2026Q08009458-S1Open ↗
08/24/2026Q08009458-I1Open ↗
08/14/2026Q08009458-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP Variance (V5) letter8
08/13/2026Q00805709-I1Open ↗
08/13/2026Q00805709-S1Open ↗
08/13/2026Q00702253-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/23/2008410011295Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
01/17/2024440815307Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/04/2007410011295Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/18/2008410011295Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
04/05/2024440815307Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/17/2024440815307Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/17/2024440815307Open ↗
▸Other Documents46
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal35
09/23/2026Q00943613-P6Open ↗
08/17/2026Q00943613-P4Open ↗
08/17/2026Q00943613-P5Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProof of Historic Building5
08/17/2026Q00943613-P2Open ↗
08/17/2026Q00943613-P1Open ↗
08/17/2026Q00943613-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWNYCSCA Exhibit 25
08/24/2026Q08009458-S3Open ↗
08/24/2026Q08009458-S1Open ↗
08/24/2026Q08009458-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
04/01/2024440815307Open ↗