← Back
Two family converted from one family
171-17 105 AVENUE
QUEENS · South Jamaica · BIN 4217939
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R4-1Zoning
1,922 sfGross Floor Area
2Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Two family converted from one family · 2,800 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof12p · 2 filings · 20 docs
Floor 29p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELMHURST REALTY203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/04/2024$995K—ELMHURST REALTY INC → Private party$518/sf building
06/10/2019$360K—Private party → ELMHURST REALTY INC$187/sf building
06/27/2017$340K—Private party → DEUTSCHE BANK NATIONAL TRUST COMPANY,$177/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC111/12/2024
PIROOZ ENGINEERING, P.C.607/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIKDER HOME IMPROVEMENTSGeneral Contractor707/08/2026
BT'S PLUMBING AND HEATINGPlumbing207/08/2026
L&J PLG & HTG CO OF NY INPlumbing207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/12/2024
PIROOZ ENGINEERING P.C7177407/12/2023
Building Lifecycle
All (70)Filed (7)Permit Issued (7)Signed Off (4)Violation (14)Objection (8)Special Inspection (30)
11/25/2025
Violation issued (HPD, open)
I
05/15/2025
Signed off — Alteration
Q01138294-I1
12/05/2024
Violation issued (HPD, open)
I
11/25/2024
Permit issued — Solar
Q01138294-I1-SL
11/12/2024
Filed — Alteration
Q01138294-I1
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/06/2024
Special inspection requirement — Final
Walid Abdulla
11/06/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/29/2023
Violation issued (HPD, open)
I
09/20/2023
Signed off — Alteration
REPAIR OF AN EXISTING CURB CUT
Q00437938-I1
09/14/2023
Signed off — Alteration
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT 1 JOB # 440650047
Q00437941-I1
07/24/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
PIROOZ SOLTANIZADEH
07/24/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
07/24/2023
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
07/24/2023
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
07/24/2023
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
07/24/2023
Special inspection requirement — Energy Code Compliance
PIROOZ SOLTANIZADEH
07/12/2023
Filed — Alteration
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT 1 JOB # 440650047
Q00437941-P3
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
07/12/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
07/12/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
PIROOZ SOLTANIZADEH
07/12/2023
Special inspection requirement — Energy Code Compliance
PIROOZ SOLTANIZADEH
07/12/2023
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
07/12/2023
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
07/12/2023
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
03/11/2023
Permit issued — Plumbing
Q00437941-I1-PL
01/23/2023
Permit issued — Curb Cut
Q00437938-I1-CC
01/18/2023
Signed off — Alteration
Q00437937-I1
11/18/2022
Violation issued (HPD, open)
I
09/27/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2022
Permit issued — Plumbing
Q00437941-I1-PL
08/11/2022
Filed — Alteration
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT 1 JOB # 440650047
Q00437941-P2
08/07/2022
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
08/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
08/07/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
08/07/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
PIROOZ SOLTANIZADEH
08/07/2022
Special inspection requirement — Energy Code Compliance
PIROOZ SOLTANIZADEH
08/07/2022
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
08/07/2022
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
03/17/2022
Violation issued (HPD, open)
I
12/02/2021
Permit issued — Construction Fence
Q00437937-I1-FN
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/27/2021
Violation issued (ECB, closed)
Construction
05/27/2021
Violation issued (ECB, closed)
Construction
05/27/2021
Violation issued (ECB, closed)
Construction
05/18/2021
Filed — Alteration
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT 1 JOB # 440650047
Q00437941-P1
05/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
05/17/2021
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
05/17/2021
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
05/17/2021
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
05/12/2021
Permit issued — Plumbing
Q00437941-I1-PL
04/21/2021
Violation issued (HPD, open)
I
04/06/2021
Permit issued — Plumbing
Q00437941-I1-PL
04/01/2021
Objection raised — Inspections
04/01/2021
Objection resolved — Addressed
04/01/2021
Objection raised — Zoning
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/25/2024
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING03/11/2023
DOB NOWCurb CutSigned-offSIKDER HOME IMPROVEMENTS01/23/2023
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING08/30/2022
DOB NOWConstruction FenceSigned-offSIKDER HOME IMPROVEMENTS12/02/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN05/12/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN04/06/2021
BIS—ISSUEDSIKDER HOME IMPROVEMENTS01/05/2023
BIS—ISSUEDSIKDER HOME IMPROVEMENTS12/30/2021
BIS—ISSUEDSIKDER HOME IMPROVEMENTS12/30/2021
BIS—ISSUEDSIKDER HOME IMPROVEMENTS02/10/2021
BIS—ISSUEDSIKDER HOME IMPROVEMENTS02/10/2021
2 projects · most recent 11/12/2024
General Wiring
FiledStatusContractorScope
11/12/2024CompleteSUNRUN SOLAR ELECTL CORP—
03/08/2021CompleteSEGA ELECTRIC LLCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
11/06/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/06/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/06/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/06/2024FinalWalid Abdullaprogress
11/06/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
07/24/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPIROOZ SOLTANIZADEHspecial
07/24/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
07/24/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
07/24/2023HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
07/24/2023HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
07/24/2023HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
07/24/2023Energy Code CompliancePIROOZ SOLTANIZADEHprogress
07/12/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
07/12/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
07/12/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPIROOZ SOLTANIZADEHspecial
07/12/2023Energy Code CompliancePIROOZ SOLTANIZADEHprogress
07/12/2023HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
07/12/2023HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
07/12/2023HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
08/07/2022HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
08/07/2022Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
08/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
08/07/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPIROOZ SOLTANIZADEHspecial
08/07/2022Energy Code CompliancePIROOZ SOLTANIZADEHprogress
08/07/2022HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 33.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Plumbing4
08/27/2026Q00437941-P3Request digital key ↗
08/27/2026Q00437941-P2Request digital key ↗
08/27/2026Q00437941-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00437937-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026Q01138294-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00437938-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION10
12/22/2023440694349Open ↗
11/17/2023440694349Open ↗
06/06/2022440650047Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION3
06/03/2021440650047Open ↗
06/03/2021440650047Open ↗
06/03/2021440650047Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/23/2022440650047Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/12/2024440694349Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
01/25/2021440650047Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
02/27/2024440650047Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/27/2024440650047Open ↗
▸BISZONING DIAGRAM1
12/23/2020440650047Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026Q00437941-I1Open ↗
09/01/2026Q00437941-I1Open ↗
08/28/2026Q00437941-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00437937-I1Open ↗
08/27/2026Q00437941-P1Open ↗
08/27/2026Q00437941-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00437941-I1Open ↗
08/28/2026Q00437941-P2Open ↗
08/27/2026Q00437941-P3Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
11/27/2021440694349Open ↗
12/02/2020440650047Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/27/2021440694349Open ↗
12/02/2020440650047Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/03/2021440650047Open ↗
▸Trade Schedules & Equipment2
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/27/2024440650047Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/27/2024440650047Open ↗
▸Safety & Tenant Protection12
▸DOB NOWTenant Protection Plan4
08/13/2026Q00437941-P1Open ↗
08/13/2026Q00437941-P2Open ↗
08/13/2026Q00437941-P3Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/03/2021440650047Open ↗
01/25/2021440650047Open ↗
▸BISSTREET TREE CHECKLIST2
12/09/2021440694349Open ↗
12/23/2020440650047Open ↗
▸BISTPP1: TENANT PROTECTION PLAN2
06/03/2021440650047Open ↗
01/25/2021440650047Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/03/2021440650047Open ↗
▸BISSTREET TREE SIGNOFF1
02/12/2024440694349Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01138294-I1Open ↗
▸Energy Compliance11
▸BISFENESTRATION AIR LEAKAGE1
02/27/2024440650047Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/27/2024440650047Open ↗
▸BISINTERIOR LIGHTING POWER1
02/27/2024440650047Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/27/2024440650047Open ↗
▸BISFENESTRATION AREAS1
02/27/2024440650047Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/25/2021440650047Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/27/2024440650047Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/27/2024440650047Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/27/2024440650047Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/03/2021440650047Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00437941-I1Open ↗
▸Inspections & Test Reports13
▸BISSOIL REPORT2
12/23/2020440650047Open ↗
12/02/2020440650047Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/25/2021440650047Open ↗
12/23/2020440650047Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
02/27/2024440650047Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/27/2024440650047Open ↗
▸BISBPP: FIELD INSPECTION1
02/12/2024440694349Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/27/2024440650047Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/27/2024440650047Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/27/2024440650047Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/27/2024440650047Open ↗
▸BISMASONRY1
02/27/2024440650047Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
02/27/2024440650047Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/04/2022440650047Open ↗
06/29/2022440650047Open ↗
12/23/2020440650047Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
12/21/2020440650047Open ↗
12/09/2020440650047Open ↗
12/02/2020440650047Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01138294-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
12/02/2020440650047Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/27/2024440650047Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
02/12/2024440694349Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
01/03/2024440694349Open ↗
11/30/2023440694349Open ↗
06/29/2022440650047Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/27/2021440694349Open ↗
12/02/2020440650047Open ↗
▸BISBOROUGH INTAKE FORM1
06/03/2021440650047Open ↗
▸Other Documents12
▸BISPRELIMINARY1
02/27/2024440650047Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
02/12/2024440694349Open ↗
▸BISSHUTOFF DAMPERS1
02/27/2024440650047Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/23/2020440650047Open ↗
▸BISCC S/O1
02/12/2024440694349Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/12/2024440694349Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/09/2021440694349Open ↗
▸BISMAINTENANCE INFORMATION1
02/27/2024440650047Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
02/27/2024440650047Open ↗
▸BISPERMANENT CERTIFICATE1
02/27/2024440650047Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
02/12/2024440694349Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
02/27/2024440650047Open ↗