← Back
Two stories - detached, small or mid-size
171-40 105 AVENUE
QUEENS · South Jamaica · BIN 4218258
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R4-1Zoning
1,216 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,538 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 1 filing · 9 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRESERVING CITY NEIGHBORHOODS HDFC1003/22/2026
PRISMA CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/07/2024$779K—RESTORING URBAN NEIGHBORHOODS LLC → Private party$641/sf building
09/10/2018$496K—Private party → PRESERVING CITY NEIGHBORHOODS HOUSING$408/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN QUOTIENT812/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J PROFESSIONAL EXPEDITING COMPANY1003/21/2026
BMB BUILDING CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRISMA CONSTRUCTION INCGeneral Contractor203/21/2026
VALENTIS ELECTRIC, INC.Electrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416812/07/2023
Building Lifecycle
All (63)Filed (8)Permit Issued (2)Signed Off (2)Violation (11)Inspection (6)Objection (4)Special Inspection (30)
01/22/2024
Signed off — Alteration
New plumbing, fixtures, boiler, hot water storage tank, associated with proposed renovation of single family home filed in conjunction with DOB NOW GC # Q00459758-I1.
Q00347570-I1
12/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
12/25/2023
Special inspection requirement — HVAC and service water heating system controls
ELIAS RASABI
12/25/2023
Special inspection requirement — HVAC and service water heating equipment
ELIAS RASABI
12/25/2023
Special inspection requirement — HVAC insulation and sealing
ELIAS RASABI
12/25/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
12/07/2023
Filed — Alteration
New plumbing, fixtures, boiler, hot water storage tank, associated with proposed renovation of single family home filed in conjunction with DOB NOW GC # Q00459758-I1.
Q00347570-P6
12/04/2023
Special inspection requirement — HVAC and service water heating equipment
ELIAS RASABI
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
12/04/2023
Special inspection requirement — HVAC insulation and sealing
ELIAS RASABI
12/04/2023
Special inspection requirement — HVAC and service water heating system controls
ELIAS RASABI
08/02/2023
Filed — Alteration
New plumbing, fixtures, boiler, hot water storage tank, associated with proposed renovation of single family home filed in conjunction with DOB NOW GC # Q00459758-I1.
Q00347570-P5
07/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
07/07/2023
Special inspection requirement — HVAC insulation and sealing
ELIAS RASABI
07/07/2023
Special inspection requirement — HVAC and service water heating equipment
ELIAS RASABI
07/07/2023
Special inspection requirement — HVAC and service water heating system controls
ELIAS RASABI
07/07/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
06/21/2023
Signed off — Alteration
Proposed general construction of existing 1-family house per plan; works are also included Interior demolition works at cellar to remove illegal condition to address violations (35076256M, 35076257Y, VACP Q333/14). Plumbing filed DOBNOW- Q00347570.
Q00459758-I1
06/20/2023
Filed — Alteration
New plumbing, fixtures, boiler, hot water storage tank, associated with proposed renovation of single family home filed in conjunction with DOB NOW GC # Q00459758-I1.
Q00347570-P4
06/16/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
06/16/2023
Special inspection requirement — HVAC and service water heating system controls
ELIAS RASABI
06/16/2023
Special inspection requirement — HVAC insulation and sealing
ELIAS RASABI
06/16/2023
Special inspection requirement — HVAC and service water heating equipment
ELIAS RASABI
06/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
06/06/2023
Objection resolved — Addressed
06/01/2023
Objection raised — Scope
05/18/2023
Filed — Alteration
New plumbing, fixtures, boiler, hot water storage tank, associated with proposed renovation of single family home filed in conjunction with DOB NOW GC # Q00459758-I1.
Q00347570-P3
05/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
05/15/2023
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
05/15/2023
Special inspection requirement — HVAC insulation and sealing
ELIAS RASABI
05/15/2023
Special inspection requirement — HVAC and service water heating system controls
ELIAS RASABI
05/15/2023
Special inspection requirement — HVAC and service water heating equipment
ELIAS RASABI
05/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2023
Objection resolved — Addressed
03/06/2023
Objection raised — Admin
02/16/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
02/12/2023
Special inspection requirement — Energy Code Compliance
ELIAS RASABI
02/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
02/12/2023
Special inspection requirement — Final
ELIAS RASABI
02/12/2023
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
02/09/2023
Filed — Alteration
New plumbing, fixtures, boiler, hot water storage tank, associated with proposed renovation of single family home filed in conjunction with DOB NOW GC # Q00459758-I1.
Q00347570-P1
02/08/2023
Filed — Alteration
Proposed general construction of existing 1-family house per plan; works are also included Interior demolition works at cellar to remove illegal condition to address violations (35076256M, 35076257Y, VACP Q333/14). Plumbing filed DOBNOW- Q00347570.
Q00459758-P1
01/12/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/23/2022
Permit issued — Plumbing
Q00347570-I1-PL
03/16/2022
Permit issued — General Construction
Q00459758-I1-GC
02/10/2021
Filed — Alteration
Proposed general construction of existing 1-family house per plan; works are also included Interior demolition works at cellar to remove illegal condition to address violations (35076256M, 35076257Y, VACP Q333/14). Plumbing filed DOBNOW- Q00347570.
Q00459758-I1
05/08/2020
Filed — Alteration
New plumbing, fixtures, boiler, hot water storage tank, associated with proposed renovation of single family home filed in conjunction with DOB NOW GC # Q00459758-I1.
Q00347570-I1
08/05/2015
Violation issued (ECB, closed)
Construction
06/16/2015
Violation issued (ECB, closed)
Construction
04/20/2015
Violation issued (ECB, closed)
Construction
02/25/2015
Violation issued (ECB, closed)
Construction
01/14/2015
Violation issued (ECB, closed)
Construction
11/21/2014
Violation issued (ECB, closed)
Construction
09/24/2014
Violation issued (ECB, closed)
Construction
08/13/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR05/23/2022
DOB NOWGeneral ConstructionSigned-offPRISMA CONSTRUCTION INC03/16/2022
1 project · most recent 12/14/2022
General Wiring
FiledStatusContractorScope
12/14/2022CompleteVALENTIS ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/12/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
12/25/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
12/25/2023HVAC and service water heating system controls ELIAS RASABIenergy_progress
12/25/2023HVAC and service water heating equipment ELIAS RASABIenergy_progress
12/25/2023HVAC insulation and sealing ELIAS RASABIenergy_progress
12/25/2023Energy Code Compliance InspectionsELIAS RASABIprogress
12/04/2023HVAC and service water heating equipment ELIAS RASABIenergy_progress
12/04/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
12/04/2023Energy Code Compliance InspectionsELIAS RASABIprogress
12/04/2023HVAC insulation and sealing ELIAS RASABIenergy_progress
12/04/2023HVAC and service water heating system controls ELIAS RASABIenergy_progress
07/07/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
07/07/2023HVAC insulation and sealing ELIAS RASABIenergy_progress
07/07/2023HVAC and service water heating equipment ELIAS RASABIenergy_progress
07/07/2023HVAC and service water heating system controls ELIAS RASABIenergy_progress
07/07/2023Energy Code Compliance InspectionsELIAS RASABIprogress
06/16/2023Energy Code Compliance InspectionsELIAS RASABIprogress
06/16/2023HVAC and service water heating system controls ELIAS RASABIenergy_progress
06/16/2023HVAC insulation and sealing ELIAS RASABIenergy_progress
06/16/2023HVAC and service water heating equipment ELIAS RASABIenergy_progress
06/16/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
05/15/2023Fire-Resistant Penetrations and JointsELIAS RASABIspecial
05/15/2023Energy Code Compliance InspectionsELIAS RASABIprogress
05/15/2023HVAC insulation and sealing ELIAS RASABIenergy_progress
05/15/2023HVAC and service water heating system controls ELIAS RASABIenergy_progress
05/15/2023HVAC and service water heating equipment ELIAS RASABIenergy_progress
Latest 25 of 40.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing6
08/24/2026Q00347570-P6Request digital key ↗
08/24/2026Q00347570-P5Request digital key ↗
08/24/2026Q00347570-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00459758-I1Request digital key ↗
08/27/2026Q00459758-P1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
02/05/2021440592066Open ↗
05/08/2020440592066Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q00347570-P1Open ↗
09/01/2026Q00347570-P1Open ↗
09/01/2026Q00347570-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00459758-I1Open ↗
08/24/2026Q00347570-P6Open ↗
08/24/2026Q00347570-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00347570-P1Open ↗
09/01/2026Q00347570-P5Open ↗
09/01/2026Q00459758-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/08/2020440592066Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026Q00347570-I1Open ↗
08/13/2026Q00459758-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00347570-I1Open ↗
08/13/2026Q00459758-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/08/2020440592066Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/08/2020440592066Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/08/2020440592066Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
05/08/2020440592066Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
10/30/2020440592066Open ↗
10/30/2020440592066Open ↗
08/17/2020440592066Open ↗
Showing 3 of 4 on file for this type