← Back
BuildNYC
One story - permanent living quarter
171-40 PIDGEON MEADOW ROAD
QUEENS · BIN 4125933
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R2AZoning
950 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story - permanent living quarter · 4,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
AtticUnder Construction9p · 1 filing · 20 docs
Floor 2Under Construction14p · 1 filing · 20 docs
Floor 1Under Construction12p · 1 filing · 20 docs
CellarUnder Construction14p · 1 filing · 20 docs
Site & exteriorUnder Construction24p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/06/2025$929K—Private party → Private party$978/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brian Ill Development204/09/2026
Ameriland Brook110/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ameriland Brook203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Big AL ContractingGeneral Contractor103/21/2026
W.jake ConstructionGeneral Contractor108/20/2026
W.jake ConstructionScaffold107/08/2026
W Jake Constructionspecialty_contractor108/30/2026
Thomas F. Cash & SonsPlumbing109/16/2026
A and W SystemsPlumbing105/25/2001
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506204/09/2026
Brian Ill Development1402104/09/2026
Building Lifecycle
09/25/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/15/2026
Permit issued — Plumbing
Q01300266-S2-PL
08/28/2026
Permit issued — Foundation
Q01300266-I1-GC-CX
08/21/2026
Failure to post or properly post permit for work at premises. Noted; building observed having failed to post active permit for vertical and…
ECB violation · open
08/19/2026
Permit issued — General Construction
Q01300266-I1-FO-EA
47 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedThomas F. Cash & Sons09/15/2026
DOB NOWFoundationPermit IssuedW.jake Construction08/28/2026
DOB NOWGeneral ConstructionPermit IssuedW.jake Construction08/19/2026
DOB NOWConstruction FencePermit IssuedW.jake Construction06/11/2026
BISPLISSUEDZara Plumbing05/25/2001
BISOTISSUEDBig AL Contracting02/07/2001
BISOTISSUEDEstate of Helen Bernat08/10/1994
1 project · most recent 04/09/2026
Heating Systems
FiledStatusContractorScope
04/09/2026Permit IssuedW.jake ConstructionHeating Systems
1 project · most recent 04/09/2026
Steel Masonry Wood
FiledStatusContractorScope
04/09/2026Permit IssuedThomas F. Cash & SonsSteel, Masonry, Wood
1 project · most recent 04/09/2026
Fence
FiledStatusContractorScope
04/09/2026Permit IssuedThomas F. Cash & SonsFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/25/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
04/09/2026HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
04/09/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
04/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBRIAN ILLspecial
04/09/2026Sprinkler SystemsXIAOHONG ZHAOspecial
04/09/2026Energy Code Compliance InspectionsBRIAN ILLprogress
04/09/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
04/09/2026HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
04/09/2026Maintenance informationBRIAN ILLenergy_progress
01/20/2026Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
11/11/2025Protection of exposed foundation insulationXIAOHONG ZHAOenergy_progress
11/10/2025Maintenance informationXIAOHONG ZHAOenergy_progress
11/10/2025MeteringXIAOHONG ZHAOenergy_progress
11/10/2025Interior lighting powerXIAOHONG ZHAOenergy_progress
11/10/2025Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
11/10/2025Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
10/09/2025FinalBRIAN ILLprogress
10/09/2025Footing and FoundationXIAOHONG ZHAOprogress
10/09/2025Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
10/09/2025Fenestration areasXIAOHONG ZHAOenergy_progress
10/09/2025Permanent certificateXIAOHONG ZHAOenergy_progress
10/09/2025HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
10/09/2025Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
10/09/2025HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
10/09/2025Air barrier — testing XIAOHONG ZHAOenergy_progress
10/09/2025Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
Latest 25 of 42.
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account