← Back
One family attached or semi-detached
171 CEDAR GROVE COURT
STATEN ISLAND · New Dorp-Midland Beach · BIN 5057048
💬 Discuss this project
1980Year Built
2Stories
A5Building Class
R3-2Zoning
1,300 sfGross Floor Area
1Units
One family attached or semi-detached · 2,800 sf lot · 0.46 FAR built · Flood zone X500
Locations of Work
Electrical
Roof1p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY206/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN AND CONSULTING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FICAZZOLA CONSULTING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116206/10/2024
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/13/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
S01045755-I1
06/10/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
S01045755-P1
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
06/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
06/05/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
06/05/2024
Special inspection requirement — Final
James Clancy
06/05/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
05/15/2024
Permit issued — Solar
S01045755-I1-SL
05/09/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
S01045755-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFICAZZOLA CONSULTING05/15/2024
1 project · most recent 05/06/2024
FiledStatusContractorScope
05/06/2024CompleteAMBER ELECTL CONTNG INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/05/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/05/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
06/05/2024Energy Code Compliance InspectionsJames Clancyprogress
06/05/2024FinalJames Clancyprogress
06/05/2024Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S01045755-I1Request digital key ↗
08/21/2026S01045755-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S01045755-P1Open ↗
08/26/2026S01045755-P1Open ↗
08/26/2026S01045755-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026S01045755-I1Open ↗
08/21/2026S01045755-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026S01045755-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026S01045755-P1Open ↗
08/21/2026S01045755-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01045755-I1Open ↗