← Back
Condo, residential unit, 1-3 unit building (orig. class 1)
171 GREENE AVENUE
BROOKLYN · Clinton Hill · BIN 3341951
💬 Discuss this project
1990Year Built
3.5Stories
R6Building Class
R6BZoning
2,807 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Condo, residential unit, 1-3 unit building (orig. class 1) · 1,343 sf lot · 2.09 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TO THE OWNER OF THE PREMI103/22/2026
PYHONIX203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION309/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PETRI PLUMBING & HEATINGGeneral Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355209/04/2025
Building Lifecycle
All (29)Filed (3)Permit Issued (2)Signed Off (2)Violation (13)Special Inspection (9)
11/20/2025
Violation issued (HPD, closed)
I
10/07/2025
Signed off — Alteration
FILE TO REPLACE THREE (3) CONDENSER UNITS ON EXISTING ROOF DUNNAGE, AND REPLACE THREE (3) AIR HANDLERS ON FLOORS: BASEMENT, 1st & ATTIC
B01239419-S1
10/07/2025
Signed off — Alteration
FILE TO REPLACE THREE (3) CONDENSER UNITS ON EXISTING ROOF DUNNAGE, AND REPLACE THREE (3) AIR HANDLERS ON FLOORS: BASEMENT, 1st & ATTIC
B01239419-I1
09/04/2025
Filed — Alteration
FILE TO REPLACE THREE (3) CONDENSER UNITS ON EXISTING ROOF DUNNAGE, AND REPLACE THREE (3) AIR HANDLERS ON FLOORS: BASEMENT, 1st & ATTIC
B01239419-P1
09/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
09/04/2025
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
09/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
09/04/2025
Special inspection requirement — Final
Steven Bendoraitis
09/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
09/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
09/04/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
09/04/2025
Special inspection requirement — Permanent certificate
Steven Bendoraitis
07/21/2025
Permit issued — General Construction
B01239419-S1-GC
07/21/2025
Permit issued — Mechanical Systems
B01239419-I1-MS
07/08/2025
Filed — Alteration
FILE TO REPLACE THREE (3) CONDENSER UNITS ON EXISTING ROOF DUNNAGE, AND REPLACE THREE (3) AIR HANDLERS ON FLOORS: BASEMENT, 1st & ATTIC
B01239419-S1
07/08/2025
Filed — Alteration
FILE TO REPLACE THREE (3) CONDENSER UNITS ON EXISTING ROOF DUNNAGE, AND REPLACE THREE (3) AIR HANDLERS ON FLOORS: BASEMENT, 1st & ATTIC
B01239419-I1
07/02/2025
Special inspection requirement — Final
Steven Bendoraitis
11/29/2024
Violation issued (HPD, closed)
I
11/22/2023
Violation issued (HPD, closed)
I
03/29/2023
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
A
11/04/2019
Violation issued (HPD, closed)
I
11/23/2016
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
03/02/2015
Violation issued (HPD, closed)
I
06/30/2004
Violation issued (HPD, open)
B
05/11/1994
Violation issued (ECB, closed)
Construction
10/17/1991
Violation issued (ECB, closed)
Construction
04/08/1991
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPETRI PLUMBING & HEATING07/21/2025
DOB NOWMechanical SystemsSigned-offPETRI PLUMBING & HEATING07/21/2025
BISPLISSUEDALADDIN PL CORP05/10/2006
BISOTISSUEDDWIP CORP03/13/2006
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/04/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/04/2025Mechanical SystemsABDALLAH ELCHERBINIspecial
09/04/2025Energy Code Compliance InspectionsSteven Bendoraitisprogress
09/04/2025FinalSteven Bendoraitisprogress
09/04/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
09/04/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
09/04/2025Maintenance informationSteven Bendoraitisenergy_progress
09/04/2025Permanent certificateSteven Bendoraitisenergy_progress
07/02/2025FinalSteven Bendoraitisprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01239419-P1Request digital key ↗
08/21/2026B01239419-S1Request digital key ↗
08/21/2026B01239419-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/21/2026B01239419-I1Open ↗
08/13/2026B01239419-P1Open ↗
08/13/2026B01239419-S1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B01239419-I1Open ↗
09/23/2026B01239419-I1Open ↗
09/23/2026B01239419-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01239419-I1Open ↗
08/13/2026B01239419-S1Open ↗
08/13/2026B01239419-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B01239419-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01239419-I1Open ↗
08/13/2026B01239419-S1Open ↗
08/13/2026B01239419-P1Open ↗