Two family frame
171 PLACE
QUEENS · BIN 4624464
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R4-1Zoning
2,040 sfGross Floor Area
2Units
Two family frame · Owner of record: IRONKEY HOMES LLC · 2,500 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneralOther
Roof1p · 1 filing · 20 docs
Floor 310p · 2 filings · 20 docs
Floor 217p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar17p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
108 ST REAKTY2009/13/2026
108 ST.REAKTY LLC1703/22/2026
108 STREET REALTY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2025$993K—— → —$487/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC908/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor2307/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519708/17/2026
TRIANGLE INSPECTION & TES7495401/10/2025
Building Lifecycle
All (69)Filed (9)Permit Issued (10)Signed Off (3)Inspection (7)Objection (10)Special Inspection (30)
08/17/2026
Filed — New Building
Proposing the new two-family two-story building
Q08006475-P2
08/17/2026
Special inspection requirement — Metering
Younes Abouyaala
08/17/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
08/17/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
08/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
08/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
08/17/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
08/17/2026
Special inspection requirement — Masonry
Younes Abouyaala
08/17/2026
Special inspection requirement — Heating Systems
Younes Abouyaala
08/17/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/17/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
08/17/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
08/17/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
08/17/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
08/17/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
08/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
08/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
08/17/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/17/2026
Special inspection requirement — Smoke Control Systems Testing
Younes Abouyaala
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
08/17/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
08/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/17/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
08/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
08/17/2026
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
08/17/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
07/09/2025
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR A NEW CURB CUT TO BE INSTALLED.
Q08008553-I1
07/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/14/2025
Signed off — Alteration
8' FEET HIGH CONSTRUCTION TEMPORARY FENCE
Q08008457-I1
02/25/2025
Signed off — Alteration
Proposing New plumbing fixtures in conjunction with new building application #Q08006475
Q08008505-I1
01/10/2025
Filed — Alteration
Proposing New plumbing fixtures in conjunction with new building application #Q08006475
Q08008505-P3
01/02/2025
Permit issued — Curb Cut
Q08008553-I1-CC
10/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/17/2024
Permit issued — Mechanical Systems
Q08006475-I1-MS
09/17/2024
Permit issued — Earth Work
Q08006475-I1-FO
09/17/2024
Permit issued — Mechanical Systems
Q08006475-I1-ST
09/17/2024
Permit issued — Foundation
Q08006475-I1-EA
08/13/2024
Filed — Alteration
Proposing New plumbing fixtures in conjunction with new building application #Q08006475
Q08008505-P2
07/23/2024
Permit issued — Structural
Q08006475-I1-GC
07/02/2024
Objection resolved — Addressed
06/25/2024
Objection raised — Scope
06/25/2024
Objection resolved — Addressed
06/25/2024
Objection raised — Scope
06/11/2024
Filed — New Building
Proposing the new two-family two-story building
Q08006475-P1
06/11/2024
Filed — Alteration
Proposing New plumbing fixtures in conjunction with new building application #Q08006475
Q08008505-P1
03/08/2024
Permit issued — Construction Fence
Q08008457-I1-FN
03/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/19/2024
Permit issued — Plumbing
Q08008505-I1-PL
05/15/2023
Permit issued — Structural
Q08006475-I1-GC
02/28/2023
Permit issued — Construction Fence
Q08008457-I1-FN
02/02/2023
Objection raised — Admin
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offYAFE MEOD CORP01/02/2025
DOB NOWMechanical SystemsPermit IssuedYAFE MEOD CORP09/17/2024
DOB NOWEarth WorkPermit IssuedYAFE MEOD CORP09/17/2024
DOB NOWMechanical SystemsPermit IssuedYAFE MEOD CORP09/17/2024
DOB NOWFoundationPermit IssuedYAFE MEOD CORP09/17/2024
DOB NOWStructuralPermit IssuedYAFE MEOD CORP07/23/2024
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP03/08/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR01/19/2024
DOB NOWStructuralPermit IssuedYAFE MEOD CORP05/15/2023
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP02/28/2023
1 project · most recent 08/17/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedYAFE MEOD CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman GSX160421 42,000 BTU · Condensing Unit ×4
Heating
Goodman GM9C960603BN 60,000 BTU · Furnace ×4
Ventilation
Honeywell VNT5200E1000/U 200 CFM · Erv ×6
1 project · most recent 04/22/2024
General Wiring
FiledStatusContractorScope
04/22/2024CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 08/17/2026
Concrete Masonry Wood
FiledStatusContractorScope
08/17/2026Permit IssuedYAFE MEOD CORPConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/01/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
08/17/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
08/17/2026Ventilation and air distribution systemYounes Abouyaalaenergy_progress
08/17/2026Maintenance informationYounes Abouyaalaenergy_progress
08/17/2026MeteringYounes Abouyaalaenergy_progress
08/17/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
08/17/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
08/17/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
08/17/2026Interior lighting powerYounes Abouyaalaenergy_progress
08/17/2026Fenestration air leakageYounes Abouyaalaenergy_progress
08/17/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
08/17/2026Air barrier — testing Younes Abouyaalaenergy_progress
08/17/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/17/2026Permanent certificateYounes Abouyaalaenergy_progress
08/17/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
08/17/2026Smoke Control Systems TestingYounes Abouyaalaspecial
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
08/17/2026Mechanical SystemsYounes Abouyaalaspecial
08/17/2026MasonryYounes Abouyaalaspecial
08/17/2026Heating SystemsYounes Abouyaalaspecial
08/17/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/17/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
08/17/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
08/17/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
08/17/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/17/2026Fenestration areasYounes Abouyaalaenergy_progress
Latest 25 of 114.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q08008457-I1Request digital key ↗
08/25/2026Q08008553-I1Request digital key ↗
08/22/2026Q08006475-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
02/26/2026440757799Open ↗
11/24/2022440757799Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/13/2024440757799Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026Q08006475-P2Open ↗
08/13/2026Q08006475-I1Open ↗
08/13/2026Q08006475-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/24/2022440757799Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/18/2023440757799Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08006475-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/19/2026Q08006475-P2Open ↗
▸Seals & Professional Certifications44
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026Q08006475-P1Open ↗
09/01/2026Q08006475-P1Open ↗
09/01/2026Q08006475-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q08006475-P1Open ↗
09/01/2026Q08006475-P1Open ↗
09/01/2026Q08006475-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q08008457-I1Open ↗
08/25/2026Q08008553-I1Open ↗
08/22/2026Q08006475-P1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/24/2022440757799Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/24/2022440757799Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q08006475-P1Open ↗
08/13/2026Q08006475-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/19/2026Q08006475-P2Open ↗
08/13/2026Q08006475-I1Open ↗
08/13/2026Q08006475-P1Open ↗
▸BISSTREET TREES SITE PLAN1
04/18/2023440757799Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/18/2023440757799Open ↗
▸BISSTREET TREE CHECKLIST1
04/18/2023440757799Open ↗
▸DOB NOWStreet Tree Sign Off1
08/22/2026Q08006475-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08006475-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/22/2026Q08006475-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT7
08/21/2026Q08008505-P2Open ↗
08/19/2026Q08006475-P2Open ↗
08/14/2026Q08008505-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q08008505-I1Open ↗
08/13/2026Q08006475-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISDOB APPROVAL FOR NEW CC1
04/19/2023440757799Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/24/2022440757799Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/19/2026Q08006475-P2Open ↗
08/13/2026Q08006475-I1Open ↗
08/13/2026Q08006475-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/19/2026Q08006475-P2Open ↗
08/13/2026Q08006475-P1Open ↗
08/13/2026Q08006475-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026Q08006475-I1Open ↗
08/22/2026Q08006475-P1Open ↗
08/19/2026Q08006475-P2Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
04/18/2023440757799Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
04/18/2023440757799Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
05/13/2024440757799Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/19/2023440757799Open ↗
▸DOB NOWFinal Survey1
08/22/2026Q08006475-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08006475-I1Open ↗