← Back
Walk-up apt, over six families with stores
Bremond King Davis
171 WEST 133 STREET · Harlem (North) · BIN 1058209
💬 Discuss this project
1926Year Built
5Stories
C7Building Class
R7-2Zoning
8,675 sfGross Floor Area
11Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: BREMOND KING DAVIS HOUSING DEVELOPMENT F UND CO. · 2,498 sf lot · 3.47 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 1 filing · 19 docs
Floor 5Under Construction14p · 1 filing · 19 docs
Floor 4Under Construction14p · 1 filing · 19 docs
Floor 3Under Construction14p · 1 filing · 19 docs
Floor 2Under Construction14p · 1 filing · 19 docs
Floor 1Under Construction15p · 1 filing · 19 docs
CellarUnder Construction24p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREMOND KING DAVIS HDFC209/25/2026
QUEENS HOUSING IMMIGRANT CENTER809/24/2026
BREMOND KING DAVIS HOUSING DEVELOPMENT F UND CO.103/22/2026
HPD203/21/2026
BREMOND KING DAVIS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL REZK109/08/2026
ROSENTHAL ENGINEERING PLLC309/29/2025
STAT ARCHITECTURE PC112/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL FUEL PLUBING & HTINGPlumbing209/25/2026
MC SUPERSTRUCTURE INCGeneral Contractor109/09/2026
PENTA RESTORATION CORPGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES9731409/29/2025
Building Lifecycle
All (79)Filed (5)Permit Issued (4)Violation (52)Objection (8)Special Inspection (10)
09/24/2026
Permit issued — Boiler Equipment
M01124871-S3-BE
09/23/2026
Permit issued — Plumbing
M01124871-S2-PL
09/08/2026
Filed — Alteration
M01409864-I1
09/08/2026
Permit issued — Sidewalk Shed
M01409864-I1-SH
06/25/2026
Permit issued — General Construction
M01124871-I1-GC
05/27/2026
Violation issued (HPD, closed)
C
05/20/2026
Violation issued (HPD, closed)
C
09/29/2025
Filed — Alteration
Proposed ventilation for gas meter room & boiler room, replace exhaust grilles and rooftop fan for interior bathroom, and ductwork, fittings and hanger as per plan, filed in conjunction with GC # M01124871-I1.
M01124871-S3
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/25/2025
Filed — Alteration
Proposed ventilation for gas meter room & boiler room, replace exhaust grilles and rooftop fan for interior bathroom, and ductwork, fittings and hanger as per plan, filed in conjunction with GC # M01124871-I1.
M01124871-S2
06/25/2025
Objection raised — Scope
06/25/2025
Objection raised — Other
06/25/2025
Objection raised — Cost
06/25/2025
Objection raised — Admin
06/16/2025
Filed — Alteration
Proposed ventilation for gas meter room & boiler room, replace exhaust grilles and rooftop fan for interior bathroom, and ductwork, fittings and hanger as per plan, filed in conjunction with GC # M01124871-I1.
M01124871-S1
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
B
12/18/2024
Filed — Alteration
Proposed ventilation for gas meter room & boiler room, replace exhaust grilles and rooftop fan for interior bathroom, and ductwork, fittings and hanger as per plan, filed in conjunction with GC # M01124871-I1.
M01124871-I1
12/18/2024
Special inspection requirement — Lighting controls
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Fenestration air leakage
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Insulation placement and R values
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Exterior lighting power
EDWIN HOPKINS
12/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
10/14/2024
Special inspection requirement — Final
EDWIN HOPKINS
10/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
07/23/2024
Violation issued (HPD, open)
A
07/23/2024
Violation issued (HPD, closed)
C
07/23/2024
Violation issued (HPD, closed)
C
07/23/2024
Violation issued (HPD, open)
A
07/08/2024
Violation issued (HPD, open)
C
07/08/2024
Violation issued (HPD, closed)
B
07/08/2024
Violation issued (HPD, closed)
C
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, open)
C
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, closed)
B
06/17/2024
Violation issued (HPD, open)
B
06/17/2024
Violation issued (HPD, open)
B
11/18/2022
Violation issued (HPD, closed)
C
11/18/2022
Violation issued (HPD, closed)
C
11/18/2022
Violation issued (HPD, closed)
C
11/18/2022
Violation issued (HPD, closed)
B
06/02/2021
Violation issued (HPD, closed)
C
06/02/2021
Violation issued (HPD, closed)
B
06/02/2021
Violation issued (HPD, closed)
B
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedDUAL FUEL PLUBING & HTING09/24/2026
DOB NOWPlumbingPermit IssuedDUAL FUEL PLUBING & HTING09/23/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedPENTA RESTORATION CORP06/25/2026
BISEQISSUEDROCK GROUP NY CORP08/05/2014
BIS—ISSUEDEJ PETERS CONSTRUCTION08/18/1999
BISPLISSUEDF&G PLUMBING AND HEATING CORP09/21/1998
BIS—ISSUEDEJ PETERS CONSTRUCTION08/24/1998
BISEQISSUEDLILLY CONSTR CO INC03/24/1998
BIS—ISSUEDEJ PETERS CONSTRUCTION02/20/1998
BISEQRE-ISSUEDBASSI CONSTR CO11/22/1996
BISOTISSUEDBLK IRON & CONSTR. WORK04/24/1996
BISOTISSUEDAMARTAL CONST11/17/1994
1 project · most recent 09/29/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/29/2025Permit IssuedPENTA RESTORATION CORPVentilation Systems
Ventilation
Greenheck G-098-VG 550 CFM · Exhaust Fan ×1
G-130-VG 1,500 CFM · Exhaust Fan ×1
1 project · most recent 09/29/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/29/2025Permit IssuedDUAL FUEL PLUBING & HTINGGas, Storm, Water/Sanitary
1 project · most recent 07/09/2026
FiledStatusContractorScope
07/09/2026Permit IssuedNASH ELECTRIC SERVICES IN—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/18/2024Lighting controlsEDWIN HOPKINSenergy_progress
12/18/2024Interior lighting powerEDWIN HOPKINSenergy_progress
12/18/2024Fenestration air leakageEDWIN HOPKINSenergy_progress
12/18/2024Fenestration and door U-factor and product ratingsEDWIN HOPKINSenergy_progress
12/18/2024Insulation placement and R valuesEDWIN HOPKINSenergy_progress
12/18/2024Exterior lighting powerEDWIN HOPKINSenergy_progress
12/10/2024Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
10/14/2024FinalEDWIN HOPKINSprogress
10/09/2024Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
10/09/2024Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/15/2026M01409864-I1Request digital key ↗
08/21/2026M01124871-S3Request digital key ↗
08/21/2026M01124871-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION2
08/07/2014122089346Open ↗
08/07/2014122089346Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/15/2026M01409864-I1Open ↗
08/13/2026M01124871-S2Open ↗
08/13/2026M01124871-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026M01124871-I1Open ↗
08/28/2026M01124871-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/07/2014122089346Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/07/2014122089346Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/07/2014122089346Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026M01124871-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/21/2026M01124871-S3Open ↗
08/21/2026M01124871-S2Open ↗
08/21/2026M01124871-S1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026M01124871-S3Open ↗
08/13/2026M01124871-I1Open ↗
08/13/2026M01124871-S1Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/07/2014122089346Open ↗