← Back
Condo, residential unit in 1-3 story building
1712 10TH AVENUE
BROOKLYN · BIN 3430141
💬 Discuss this project
2023Year Built
3Stories
R3Building Class
R5BZoning
23,415 sfGross Floor Area
30Units
Condo, residential unit in 1-3 story building · Owner of record: 10TH AVE DEVELOPMENT LLC · 14,017 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionOther
Roof29p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 5 docs
Penthouse1p · 1 filing · 6 docs
Floor 328p · 2 filings · 20 docs
Floor 237p · 4 filings · 20 docs
Floor 14p · 2 filings · 11 docs
Cellar38p · 4 filings · 20 docs
Basement28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN STUDIO ASSOCIATES1312/12/2024
PAUL PERDEK, PROF. ENG. PLLC204/26/2023
LMW ENGINEERING GROUP LLC401/31/2023
YAKER ENGINEERING, P.C.112/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN STUDIO ASSOCIATES1703/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GIRON CONTRACTING INCGeneral Contractor1707/08/2026
T.N.T PLBG & HTG INCFire Protection207/08/2026
FINE MECHANICAL CORPPlumbing207/08/2026
RAYMOND'S PLBG & HTG LLCPlumbing207/08/2026
MERCURY FIRE SUPP INCFire Protection107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394412/12/2024
TRIANGLE INSPECTION & TES74951512/12/2024
Building Lifecycle
All (117)Filed (20)Permit Issued (19)Signed Off (10)Inspection (10)Objection (28)Special Inspection (30)
04/29/2025
Signed off — New Building
PROPOSED THREE (3) STORY AND CELLAR, SEVENTEEN FAMILY DWELLING AS PER PLANS FILED HEREWITH
B00595582-I1
02/04/2025
Signed off — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURE AND RELATED PIPING AS PER PLANS FILED HEREWITH.
B00644463-I1
01/21/2025
Signed off — Alteration
INSTALLATION OR RESIDENTIAL SPRINKLER SYSTEM AND RELATED PIPING FILED IN CONJUNCTION WITH NB B00595582
B00644472-I1
01/14/2025
Permit issued — Sprinklers
B00644472-I1-EW-SP
01/02/2025
Permit issued — Plumbing
B00644463-I1-PL
12/19/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Paul Raymond
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
12/19/2024
Special inspection requirement — Post-installed Anchors
Rajasekhar Sakhamuri
12/17/2024
Objection resolved — Addressed
12/17/2024
Objection resolved — Addressed
12/16/2024
Objection raised — Admin
12/16/2024
Objection raised — Scope
12/12/2024
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURE AND RELATED PIPING AS PER PLANS FILED HEREWITH.
B00644463-P3
12/10/2024
Special inspection requirement — Post-installed Anchors
Rajasekhar Sakhamuri
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
12/10/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Paul Raymond
11/15/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00841170-I1
10/30/2024
Signed off — Alteration
B00649074-I1
10/29/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/22/2024
Objection raised — Scope
10/22/2024
Objection resolved — Addressed
10/18/2024
Permit issued — Curb Cut
B00649074-I1-CC
10/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2024
Objection raised — Scope
09/30/2024
Objection resolved — Addressed
09/30/2024
Objection raised — Scope
09/30/2024
Objection resolved — Addressed
09/27/2024
Filed — Alteration
INSTALLATION OR RESIDENTIAL SPRINKLER SYSTEM AND RELATED PIPING FILED IN CONJUNCTION WITH NB B00595582
B00644472-P1
09/25/2024
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURE AND RELATED PIPING AS PER PLANS FILED HEREWITH.
B00644463-P2
09/24/2024
Special inspection requirement — Post-installed Anchors
Rajasekhar Sakhamuri
09/24/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Paul Raymond
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
09/20/2024
Special inspection requirement — Sprinkler Systems
Rajasekhar Sakhamuri
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
08/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/12/2024
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURE AND RELATED PIPING AS PER PLANS FILED HEREWITH.
B00644463-P1
08/02/2024
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Electric vehicle service equipment requirements
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Protection of exposed foundation insulation
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Paul Raymond
08/02/2024
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Masonry
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Concrete - Cast-In-Place
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Exterior lighting power
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
08/02/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rajasekhar Sakhamuri
07/26/2024
Objection resolved — Addressed
07/25/2024
Objection raised — Other
07/17/2024
Filed — New Building
PROPOSED THREE (3) STORY AND CELLAR, SEVENTEEN FAMILY DWELLING AS PER PLANS FILED HEREWITH
B00595582-P4
06/13/2024
Filed — New Building
PROPOSED THREE (3) STORY AND CELLAR, SEVENTEEN FAMILY DWELLING AS PER PLANS FILED HEREWITH
B00595582-P3
05/30/2024
Signed off — Alteration
B07998908-I1
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offT.N.T PLBG & HTG INC01/14/2025
DOB NOWPlumbingSigned-offRAYMOND'S PLBG & HTG LLC01/02/2025
DOB NOWCurb CutSigned-offGIRON CONTRACTING INC10/18/2024
DOB NOWGeneral ConstructionPermit IssuedGIRON CONTRACTING INC05/30/2024
DOB NOWGeneral ConstructionPermit IssuedGIRON CONTRACTING INC10/31/2023
DOB NOWConstruction FenceSigned-offGIRON CONTRACTING INC10/25/2023
DOB NOWSprinklersSigned-offT.N.T PLBG & HTG INC10/17/2023
DOB NOWPlumbingSigned-offRAYMOND'S PLBG & HTG LLC09/28/2023
DOB NOWSprinklersSigned-offMERCURY FIRE SUPP INC05/17/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/23/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP02/24/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP02/10/2023
DOB NOWFoundationSigned-offGIRON CONTRACTING INC11/30/2022
DOB NOWConstruction FenceSigned-offGIRON CONTRACTING INC11/02/2022
DOB NOWGeneral ConstructionPermit IssuedGIRON CONTRACTING INC10/31/2022
DOB NOWStructuralSigned-offGIRON CONTRACTING INC09/29/2022
DOB NOWSupport of ExcavationSigned-offGIRON CONTRACTING INC09/13/2022
DOB NOWGeneral ConstructionPermit IssuedGIRON CONTRACTING INC09/08/2022
DOB NOWConstruction FenceSigned-offGIRON CONTRACTING INC01/21/2022
2 projects · most recent 11/08/2022
General Wiring
FiledStatusContractorScope
11/08/2022CompleteGREEN STAR ELECTL CONT IN—
11/08/2022CompleteGREEN STAR ELECTL CONT INGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/29/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/01/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
12/19/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPaul Raymondspecial
12/19/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
12/19/2024Post-installed AnchorsRajasekhar Sakhamurispecial
12/10/2024Post-installed AnchorsRajasekhar Sakhamurispecial
12/10/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPaul Raymondspecial
12/10/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
09/24/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesPaul Raymondspecial
09/24/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
09/24/2024Post-installed AnchorsRajasekhar Sakhamurispecial
09/20/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
09/20/2024Sprinkler SystemsRajasekhar Sakhamurispecial
08/02/2024Concrete - Cast-In-PlaceRajasekhar Sakhamurispecial
08/02/2024Air barrier — testing Rajasekhar Sakhamurienergy_progress
08/02/2024Protection of exposed foundation insulationRajasekhar Sakhamurienergy_progress
08/02/2024Interior lighting powerRajasekhar Sakhamurienergy_progress
08/02/2024Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
08/02/2024Maintenance informationRajasekhar Sakhamurienergy_progress
08/02/2024Electric vehicle service equipment requirementsRajasekhar Sakhamurienergy_progress
08/02/2024Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
08/02/2024Fenestration air leakageRajasekhar Sakhamurienergy_progress
08/02/2024Exterior lighting powerRajasekhar Sakhamurienergy_progress
08/02/2024Fenestration areasRajasekhar Sakhamurienergy_progress
08/02/2024Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
08/02/2024Permanent certificateRajasekhar Sakhamurienergy_progress
08/02/2024Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
Latest 25 of 112.
▾Documents — 213 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/31/2026B00627976-I1Request digital key ↗
08/29/2026B00713637-I1Request digital key ↗
08/28/2026B07998908-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
07/08/2022340841138Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
09/17/2024340841138Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/08/2022340841138Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00595582-I1Open ↗
08/13/2026B00595582-P1Open ↗
08/13/2026B00595582-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00595582-P1Open ↗
08/13/2026B00595582-I1Open ↗
08/13/2026B00595582-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00595582-I1Open ↗
▸Seals & Professional Certifications132
▸DOB NOWProgress Inspector Seal & Signature59
09/27/2026B00595582-P2Open ↗
09/27/2026B00595582-P2Open ↗
09/27/2026B00595582-P2Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature53
09/27/2026B00595582-P2Open ↗
09/27/2026B00595582-P2Open ↗
09/27/2026B00595582-P2Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/31/2026B00627976-I1Open ↗
08/28/2026B00644472-I1Open ↗
08/28/2026B00644472-P1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/08/2022340841138Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/08/2022340841138Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00595582-P3Open ↗
08/13/2026B00595582-P4Open ↗
08/13/2026B00595582-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/24/2026B00595582-P3Open ↗
08/15/2026B00595582-P2Open ↗
08/15/2026B00595582-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/04/2023340841138Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/04/2023340841138Open ↗
▸BISSTREET TREE CHECKLIST1
12/04/2023340841138Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00595582-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00595582-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00595582-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00595582-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/13/2026B00595582-P3Open ↗
08/13/2026B00595582-P2Open ↗
08/13/2026B00595582-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00595582-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00595582-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
09/17/2024340841138Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/04/2023340841138Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/08/2022340841138Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00841170-P1Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/13/2026B00595582-P4Open ↗
08/13/2026B00595582-P1Open ↗
08/13/2026B00595582-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00595582-P3Open ↗
08/13/2026B00595582-P1Open ↗
08/13/2026B00595582-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/24/2026B00595582-I1Open ↗
08/24/2026B00595582-P3Open ↗
08/15/2026B00595582-P2Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
09/17/2024340841138Open ↗
12/08/2023340841138Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/04/2023340841138Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00595582-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00595582-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00713591-I1Open ↗