1715 47TH STREET
BROOKLYN · Borough Park · BIN 3128705
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R5Zoning
2,424 sfGross Floor Area
2Units
Two family brick · 2,805 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction71p · 1 filing · 20 docs
BulkheadUnder Construction2p · 1 filing · 20 docs
Floor 2Under Construction68p · 1 filing · 20 docs
Floor 1Under Construction66p · 1 filing · 20 docs
CellarUnder Construction70p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction90p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/02/2023$2.6M—1715 47TH STREET, LLC → Private party$1,073/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chosen MEP510/14/2026
Lester Katz, Ncarb606/23/2026
Ashraf206/09/2025
HY PE Structural Engineering305/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter Group2403/21/2026
Kma Designs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Blue Dream BuildersGeneral Contractor1107/08/2026
Blue Dream BuildersScaffold307/08/2026
J & G Construction ServicesScaffold204/09/2026
B&B Mechanical Plumbing & HeatingPlumbing207/08/2026
Target Piping NYFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252610/14/2026
HRF Services5616606/23/2026
Building Lifecycle
All (138)Filed (16)Permit Issued (17)Signed Off (3)Inspection (6)Objection (66)Special Inspection (30)
10/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SPRINKELR AND PLUMBING PLANS FILED HEREWITH.
B00982554-P9
09/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
09/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
09/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
09/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
09/17/2026
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
09/17/2026
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
09/03/2026
Objection resolved — Addressed
09/02/2026
Objection raised — Other
09/02/2026
Objection resolved — Addressed
06/29/2026
Objection raised — Other
06/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SPRINKELR AND PLUMBING PLANS FILED HEREWITH.
B00982554-P7
04/27/2026
Permit issued — Sprinklers
B00982554-S4-EW-SP
04/24/2026
Permit issued — Sprinklers
B00982554-S4-PL
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/22/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/22/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/22/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/22/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
04/22/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/22/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
04/22/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
04/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/22/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/22/2026
Special inspection requirement — Metering
FAHAD FATEH
04/22/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
04/22/2026
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/13/2026
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
04/13/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/13/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
04/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/13/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/31/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SPRINKELR AND PLUMBING PLANS FILED HEREWITH.
B00982554-P6
03/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SPRINKELR AND PLUMBING PLANS FILED HEREWITH.
B00982554-P5
02/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SPRINKELR AND PLUMBING PLANS FILED HEREWITH.
B00982554-P4
01/07/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SPRINKELR AND PLUMBING PLANS FILED HEREWITH.
B00982554-S1
12/11/2025
Permit issued — General Construction
B00982554-I1-GC
12/03/2025
Permit issued — General Construction
B00982554-I1-GC
12/02/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/07/2025
Signed off — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress under this application. all work to comply with chapter 33 of nycbc
B01187058-S1
11/07/2025
Signed off — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress under this application. all work to comply with chapter 33 of nycbc
B01187058-I1
09/16/2025
Permit issued — Mechanical Systems
B00982554-S5-MS
08/13/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/24/2025
Objection resolved — Addressed
07/22/2025
Permit issued — Construction Fence
B00982554-S1-FN
07/15/2025
Objection raised — Admin
07/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED SPRINKELR AND PLUMBING PLANS FILED HEREWITH.
B00982554-P3
06/10/2025
Permit issued — Supported Scaffold
B01187058-S1-SF
06/09/2025
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress under this application. all work to comply with chapter 33 of nycbc
B01187058-S1
05/19/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/30/2025
Permit issued — Plumbing
B00982554-S4-EW-SP
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offTarget Piping NY04/27/2026
DOB NOWPlumbingPermit IssuedB&B Mechanical Plumbing & Heating04/24/2026
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders12/11/2025
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders12/03/2025
DOB NOWMechanical SystemsPermit IssuedBlue Dream Builders09/16/2025
DOB NOWConstruction FenceSigned-offBlue Dream Builders07/22/2025
DOB NOWSupported ScaffoldSigned-offJ & G Construction Services06/10/2025
DOB NOWSprinklersSigned-offTarget Piping NY04/30/2025
DOB NOWPlumbingPermit IssuedTarget Piping NY04/30/2025
DOB NOWSidewalk ShedSigned-offJ & G Construction Services03/03/2025
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders12/03/2024
DOB NOWFoundationPermit IssuedBlue Dream Builders11/14/2024
DOB NOWEarth WorkPermit IssuedBlue Dream Builders11/13/2024
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders08/06/2024
DOB NOWStructuralPermit IssuedBlue Dream Builders07/25/2024
DOB NOWSupport of ExcavationPermit IssuedBlue Dream Builders07/25/2024
DOB NOWConstruction FenceSigned-offBlue Dream Builders07/25/2024
1 project · most recent 10/14/2026
Sprinkler System
FiledStatusContractorScope
10/14/2026Signed-offTarget Piping NYSprinkler System
1 project · most recent 10/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/14/2026Permit IssuedTarget Piping NYGas, Storm, Water/Sanitary
2 projects · most recent 05/08/2025
General Wiring
FiledStatusContractorScope
05/08/2025CompleteOhr Chodosh Electrical Cont IGeneral Wiring
02/26/2025CompleteRichard Neu—
1 project · most recent 10/14/2026
Steel
FiledStatusContractorScope
10/14/2026Signed-offTarget Piping NYSteel
1 project · most recent 10/14/2026
Fence
FiledStatusContractorScope
10/14/2026Signed-offTarget Piping NYFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/02/2025Pass-Final PL - UndergroundPassView ↗
11/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/13/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/19/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
09/17/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
09/17/2026Sprinkler SystemsINDARDEO PARBHUNATHspecial
09/17/2026HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
09/17/2026Maintenance informationINDARDEO PARBHUNATHenergy_progress
09/17/2026HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
09/17/2026HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
04/22/2026Air barrier — testing FAHAD FATEHenergy_progress
04/22/2026MeteringFAHAD FATEHenergy_progress
04/22/2026Permanent certificateFAHAD FATEHenergy_progress
04/22/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/22/2026Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
04/22/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/22/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
04/22/2026Maintenance informationFAHAD FATEHenergy_progress
04/22/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/22/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
04/22/2026Fenestration areasFAHAD FATEHenergy_progress
04/22/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/22/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
04/22/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/22/2026Interior lighting powerFAHAD FATEHenergy_progress
04/22/2026Fenestration air leakageFAHAD FATEHenergy_progress
04/13/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
04/13/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/13/2026Permanent certificateFAHAD FATEHenergy_progress
Latest 25 of 91.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026B00982554-P6Request digital key ↗
08/26/2026B00982554-P5Request digital key ↗
08/26/2026B00982554-P3Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026B00982554-P7Open ↗
08/13/2026B00982554-P6Open ↗
08/13/2026B00982554-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B00982554-P7Open ↗
08/13/2026B00982554-I1Open ↗
08/13/2026B00982554-P6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/26/2026B00982554-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026B00982554-P9Open ↗
09/02/2026B00982554-S3Open ↗
09/01/2026B00982554-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026B00982554-P9Open ↗
09/02/2026B00982554-S3Open ↗
09/01/2026B00982554-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/17/2026B00982554-P9Open ↗
08/26/2026B00982554-S3Open ↗
08/26/2026B00982554-S2Open ↗
Showing 3 of 15 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/17/2026B00982554-P9Open ↗
08/26/2026B00982554-S2Open ↗
08/26/2026B00982554-P6Open ↗
Showing 3 of 14 on file for this type
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT3
08/13/2026B00982554-S2Open ↗
08/13/2026B00982554-S6Open ↗
08/13/2026B00982554-S7Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026B00982554-S2Open ↗
08/13/2026B00982554-S6Open ↗
08/13/2026B00982554-S7Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B00982554-S6Open ↗
08/13/2026B00982554-S2Open ↗
08/13/2026B00982554-S7Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/15/2026B00982554-P7Open ↗
08/13/2026B00982554-P6Open ↗
08/13/2026B00982554-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B00982554-P7Open ↗
08/13/2026B00982554-I1Open ↗
08/13/2026B00982554-P6Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026B00982554-P6Open ↗
08/26/2026B00982554-I1Open ↗
08/15/2026B00982554-P7Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00982554-S2Open ↗
08/13/2026B00982554-S6Open ↗
▸DOB NOWFinal Survey1
08/26/2026B00982554-I1Open ↗