Five to six families
1715 VOORHIES AVENUE
💬 Discuss this project
1934Year Built
3Stories
C2Building Class
C4-2Zoning
4,224 sfGross Floor Area
6Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 1715 VOORHIES LLC · 2,120 sf lot · 1.99 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Floor 320p · 1 filing · 20 docs
Floor 218p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar20p · 1 filing · 20 docs
Filed — no permit issued6p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZION GROUP2309/12/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/17/2022$950K—— → —$225/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCORD CONSULTING ENGINEERING PC705/15/2026
AA BLDG & INSP SVC LLC205/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mdl consulting services603/21/2026
DMCONSULTING6860403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SB RENOVATION & MODELINGGeneral Contractor403/21/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519805/15/2026
Building Lifecycle
All (118)Filed (9)Permit Issued (3)Signed Off (2)Violation (14)Inspection (9)Objection (51)Special Inspection (30)
08/17/2026
Signed off — Alteration CO
PROPOSED NEW PLUMBING FIXTURES INSTALLATION THROUGHOUT THE BUILDING WITH ASSOCIATED COLD/HOT WATER , SANITARY AND VENT PIPING AS PER PLANS FILED HEREWITH
B01049940-S2
06/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2026
Signed off — Alteration CO
PROPOSED NEW PLUMBING FIXTURES INSTALLATION THROUGHOUT THE BUILDING WITH ASSOCIATED COLD/HOT WATER , SANITARY AND VENT PIPING AS PER PLANS FILED HEREWITH
B01049940-S1
05/28/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/28/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/28/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
05/28/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/28/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
05/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/15/2026
Filed — Alteration CO
PROPOSED NEW PLUMBING FIXTURES INSTALLATION THROUGHOUT THE BUILDING WITH ASSOCIATED COLD/HOT WATER , SANITARY AND VENT PIPING AS PER PLANS FILED HEREWITH
B01049940-P6
05/15/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
05/15/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/15/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/15/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
05/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
12/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
12/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
12/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/03/2025
Filed — Alteration CO
PROPOSED NEW PLUMBING FIXTURES INSTALLATION THROUGHOUT THE BUILDING WITH ASSOCIATED COLD/HOT WATER , SANITARY AND VENT PIPING AS PER PLANS FILED HEREWITH
B01049940-P4
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
12/03/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
12/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
11/23/2025
Filed — Alteration CO
PROPOSED NEW PLUMBING FIXTURES INSTALLATION THROUGHOUT THE BUILDING WITH ASSOCIATED COLD/HOT WATER , SANITARY AND VENT PIPING AS PER PLANS FILED HEREWITH
B01049940-P3
11/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
11/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Objection raised — Cost
11/14/2025
Objection resolved — Addressed
11/13/2025
Filed — Alteration CO
PROPOSED NEW PLUMBING FIXTURES INSTALLATION THROUGHOUT THE BUILDING WITH ASSOCIATED COLD/HOT WATER , SANITARY AND VENT PIPING AS PER PLANS FILED HEREWITH
B01049940-P2
07/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2025
Violation issued (HPD, closed)
A
05/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/03/2025
Filed — Alteration CO
PROPOSED NEW PLUMBING FIXTURES INSTALLATION THROUGHOUT THE BUILDING WITH ASSOCIATED COLD/HOT WATER , SANITARY AND VENT PIPING AS PER PLANS FILED HEREWITH
B01049940-P1
02/11/2025
Permit issued — Plumbing
B01049940-S2-PL
02/07/2025
Permit issued — Mechanical Systems
B01049940-S1-MS
01/24/2025
Objection resolved — Addressed
01/16/2025
Filed — Alteration CO
PROPOSED NEW PLUMBING FIXTURES INSTALLATION THROUGHOUT THE BUILDING WITH ASSOCIATED COLD/HOT WATER , SANITARY AND VENT PIPING AS PER PLANS FILED HEREWITH
B01049940-S2
01/16/2025
Objection raised — Energy
01/10/2025
Objection resolved — Addressed
01/09/2025
Objection raised — Cost
01/09/2025
Objection resolved — Addressed
01/09/2025
Objection raised — Energy
01/09/2025
Objection raised — Admin
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP02/11/2025
DOB NOWMechanical SystemsSigned-offSB RENOVATION & MODELING02/07/2025
DOB NOWMechanical SystemsPermit IssuedSB RENOVATION & MODELING11/21/2024
1 project · most recent 05/15/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/15/2026Signed-offSB RENOVATION & MODELINGHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NA 24,000 BTU · Condensing Unit ×3
SUZ-KA18NA 18,000 BTU · Condensing Unit ×2
MUZ-FH12NA 12,000 BTU · Condensing Unit ×1
MXZ-3C30NA 30,000 BTU · Condensing Unit ×1
Cooling
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×4
Heating
Mitsubishi Electric M4H36W06060615-B 36,000 BTU ×4
Ventilation
Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×4
1 project · most recent 05/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/15/2026Signed-offFOUR POINTS P & H CORPGas, Water/Sanitary
1 project · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 05/15/2026
FiledStatusContractorScope
05/15/2026Signed-offFOUR POINTS P & H CORP1 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/11/2025Pass-Final PL - UndergroundPassView ↗
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/28/2026Mechanical SystemsYounes Abouyaalaspecial
05/28/2026FinalNAVEEN KUMARprogress
05/28/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/28/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
05/28/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
05/28/2026Maintenance informationYounes Abouyaalaenergy_progress
05/28/2026Shutoff dampersYounes Abouyaalaenergy_progress
05/28/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/15/2026Shutoff dampersYounes Abouyaalaenergy_progress
05/15/2026Mechanical SystemsYounes Abouyaalaspecial
05/15/2026FinalNAVEEN KUMARprogress
05/15/2026Maintenance informationYounes Abouyaalaenergy_progress
05/15/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
05/15/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
05/15/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/15/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
12/05/2025Maintenance informationYounes Abouyaalaenergy_progress
12/05/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
12/05/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
12/05/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
12/05/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/03/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
12/03/2025Maintenance informationYounes Abouyaalaenergy_progress
12/03/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
12/03/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 47.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026B01049940-P2Request digital key ↗
08/23/2026B01049940-P1Request digital key ↗
08/23/2026B01049940-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01049940-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature9
09/19/2026B01049940-S2Open ↗
09/01/2026B01049940-P5Open ↗
08/26/2026B01049940-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026B00973324-I1Open ↗
08/23/2026B01049940-P1Open ↗
08/23/2026B01049940-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/19/2026B01049940-S2Open ↗
09/01/2026B01049940-P5Open ↗
08/26/2026B01049940-P2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01049940-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026B01049940-P1Open ↗
08/23/2026B01049940-S2Open ↗
08/23/2026B01049940-S1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents11
▸DOB NOWDHCR Document10
08/23/2026B01049940-P6Open ↗
08/13/2026B01049940-P2Open ↗
08/13/2026B01049940-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProperty Ownership Certification1
08/23/2026B01049940-I1Open ↗