← Back
Condo, commercial tower (mixed-use) [derived]
Courtyard & Residence Inn Manhattan/Central Park
1717 BROADWAY · BIN 1024849
💬 Discuss this project
2012Year Built
67Stories
RCBuilding Class
C6-7Zoning
342,142 sfGross Floor Area
6Units
LL97 CoveredRent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, commercial tower (mixed-use) [derived] · Owner of record: UNAVAILABLE OWNER · 10,481 sf lot · 32.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 510p · 3 filings · 20 docs
Floor 4Under Construction69p · 4 filings · 20 docs
Floor 3Under Construction85p · 3 filings · 20 docs
Floor 2Under Construction86p · 3 filings · 20 docs
Floor 1Under Construction13p · 2 filings · 20 docs
MezzanineUnder Construction63p · 2 filings · 20 docs
CellarUnder Construction69p · 2 filings · 20 docs
Sub-CellarUnder Construction68p · 2 filings · 20 docs
3 jobs · most recent 08/18/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedSTROYBAT INCAir Conditioning Systems
Cooling
Florida Heat Pump LV036-4HZC 35,700 BTU · Wshp ×96
LV024-4HZC 22,200 BTU · Wshp ×8
LV048-4HZC 47,400 BTU · Wshp ×8
01/07/2026Permit IssuedNEXX CONSTRUCTION INCVentilation Systems
Ventilation
Captiveaire A2-E-452-200 2,900 CFM · Makeup Air ×1
Greenheck QEI-15 3,650 CFM · Exhaust Fan ×1
07/03/2024Signed-offLEO STYLE CORPORATIONHeating and Air Conditioning Systems
Heat / Cool
Daikin AC-5-1A MODEL NO. FTXS24LVJU AC-5-1B MODEL NO. FTXS24LVJU AC-5-2A MODEL NO. FTXS24LVJU AC-5-2B MODEL NO. FTXS24LVJU 2 tons · Fan Coil Indoor ×4
CU-5-1 MODEL NO 5MXS48TVJU CU-5-2 MODEL NO 5MXS48TVJU 4 tons · Heat Pump Outdoor ×2
3 jobs · most recent 08/18/2026
Sprinkler System
FiledStatusContractorScope
08/18/2026Permit IssuedREAL PLUMBING CORP1,670 heads
01/07/2026Signed-offREAL PLUMBING CORPSprinkler System
12/05/2025Signed-offREAL PLUMBING CORP—
5 jobs · most recent 08/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/18/2026Permit IssuedLEVEL UP PLUMBING CORPGas, Water/Sanitary
01/07/2026Signed-offREAL PLUMBING CORPGas, Water/Sanitary
12/05/2025———
09/29/2025Signed-offLEVEL UP PLUMBING CORPGas, Water/Sanitary
07/03/2024Signed-offP.S.I. MECHANICALWater/Sanitary
12 jobs · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026Permit IssuedTOP SHELF ELECTRIC CORP—
12/09/2025CompleteCREGGAN ELECTRIAL CORPGeneral Wiring
06/07/2025Permit IssuedA.R.I.S. ELECTRIC INCGeneral Wiring
06/07/2025CompleteA.R.I.S. ELECTRIC INCGeneral Wiring
06/06/2025Permit IssuedA.R.I.S. ELECTRIC INCGeneral Wiring
01/03/2025CompleteTOP SHELF ELECTRIC CORP—
12/17/2024Permit IssuedA.R.I.S. ELECTRIC INC—
01/24/2024CompleteCRESCO ELECTRICAL CORPGeneral Wiring
05/12/2021CompleteSPICE ELECTRIC COMPANY—
12/03/2020CompletePAGS ELECTRICAL CONTNG LLGeneral Wiring
10/30/2019CompletePAGS ELECTRICAL CONTNG LLGeneral Wiring
05/11/2018Permit IssuedDOLA ELECTRICAL CO. INC2 meters, 2 new_meters
2 jobs · most recent 08/18/2026
Concrete
FiledStatusContractorScope
08/18/2026Permit IssuedSTROYBAT INCConcrete
09/29/2025Signed-offLEVEL UP PLUMBING CORPConcrete
1 job · most recent 07/07/2026
Sidewalk Shed
FiledStatusContractorScope
07/07/2026Permit IssuedSPRING SCAFFOLDING LLCSidewalk Shed
Building Lifecycle
All (298)Filed (63)Permit Issued (37)Signed Off (12)Facade (FISP) (3)Violation (60)Inspection (35)Objection (58)Special Inspection (30)
08/18/2026
Filed — Alteration CO
Filing herewith for the modifications of existing plumbing system.
M00864036-D1
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Wavro
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
08/11/2026
Special inspection requirement — Interior lighting power
Matthew Wavro
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
08/11/2026
Special inspection requirement — Lighting controls
Matthew Wavro
08/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/10/2026
Objection raised — Accessibility
07/27/2026
Signed off — Alteration
Filing herewith for installation of plumbing systems
M01143723-S1
07/21/2026
Filed — Alteration CO
Filing herewith for the modifications of existing plumbing system.
M00864036-C9
07/15/2026
Permit issued — Structural
M00864036-S1-ST
07/10/2026
Permit issued — General Construction
M00864036-I1-GC
07/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01401406-I1
07/07/2026
Permit issued — Sidewalk Shed
M01401406-I1-SH
07/02/2026
Permit issued — Mechanical Systems
M00864036-S4-MS
06/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SILVIAN MARCUS
06/30/2026
Special inspection requirement — Final
SILVIAN MARCUS
06/30/2026
Special inspection requirement — Structural Steel - Details
SILVIAN MARCUS
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/30/2026
Special inspection requirement — Structural Steel - Welding
SILVIAN MARCUS
06/30/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SILVIAN MARCUS
06/30/2026
Special inspection requirement — Concrete - Cast-In-Place
SILVIAN MARCUS
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
C
06/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/02/2026
Violation issued (ECB, open)
Construction
05/21/2026
Signed off — Alteration CO
Installation of plumbing/sprinkler fixtures and related piping as shown on drawings filed herewith. No change to occupancy, use or egress.
M00963215-S2
05/21/2026
Signed off — Alteration
Filing herewith for the modifications and installations to 4th floor sprinklers. There is no change to use, egress, or occupancy
M01324444-I1
05/11/2026
Objection raised — Accessibility
05/11/2026
Objection raised — Accessibility
05/11/2026
Objection resolved — Resolved
05/08/2026
Permit issued — Plumbing
M01143723-S1-PL
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2026
Filed — Alteration CO
Filing herewith for the modifications of existing plumbing system.
M00864036-C6
04/13/2026
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
04/03/2026
Objection resolved — Addressed
04/02/2026
Objection raised — Other
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/16/2026
Filed — Alteration CO
Filing herewith for the modifications of existing plumbing system.
M00864036-C7
03/12/2026
Permit issued — Sprinklers
M01324444-I1-EW-SP
03/11/2026
Special inspection requirement — Interior lighting power
Matthew Wavro
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Wavro
03/11/2026
Special inspection requirement — Lighting controls
Matthew Wavro
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
01/30/2026
Signed off — Alteration CO
Installation of plumbing/sprinkler fixtures and related piping as shown on drawings filed herewith. No change to occupancy, use or egress.
M00963215-S1
01/22/2026
Special inspection requirement — Structural Steel - Details
SILVIAN MARCUS
01/22/2026
Special inspection requirement — Final
SILVIAN MARCUS
01/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SILVIAN MARCUS
01/22/2026
Special inspection requirement — Concrete - Cast-In-Place
SILVIAN MARCUS
01/22/2026
Special inspection requirement — Structural Steel - Welding
SILVIAN MARCUS
01/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
01/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
01/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Morse
Latest 60 of 298 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
G HOLDINGS10107/16/2026
GCAM4107/08/2026
CNY BUILDERS3103/22/2026
NAVILLUS CONTRACTING103/22/2026
CRL BUILDING CORP103/22/2026
CMY BUILDERS LLC103/22/2026
GRANITE BROADWAY DEVELOPMENT10903/22/2026
900 EIGHTH AVE CONDOMINUM103/22/2026
231 WEST 54TH CORP.103/22/2026
SPECIAL TESTING CONSULTI103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NOBUTAKA ASHIHARA ARCHITECT PC1308/18/2026
TOHFAZ UDDIN PE PC207/07/2026
WSP704/17/2026
KOHLER RONAN, LLC501/07/2026
COSA DESIGN712/30/2025
MG ENGINEERING D.P.C.2012/05/2025
MCKAY ARCHITECTURE AND DESIGN PLLC501/16/2025
JACK GREEN ASSOCIATES201/12/2024
MURDOCH ENGINEERING208/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.7203/21/2026
SPRING SCAFFOLDING LLC203/21/2026
RPO2403/21/2026
CODE1403/21/2026
D R BROWN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STROYBAT INCGeneral Contractor1307/16/2026
NEXX CONSTRUCTION INCGeneral Contractor807/08/2026
MEGA PLBG CORPFire Protection507/08/2026
NICE PLUMBING CORPPlumbing507/08/2026
NEW YORK HEATING CORPGeneral Contractor403/22/2026
CNY BUILDING CORPGeneral Contractor307/04/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/09/2026
MEGA PLBG CORPPlumbing207/08/2026
PAGS ELECTRICAL CONTNG LLElectrical203/22/2026
INTERBORO SIGN & MAINTENANCEGeneral Contractor203/21/2026
INTERBORO SIGN ELECL MAIScaffold107/08/2026
COSA DESIGNGeneral Contractor103/22/2026
LEO STYLE CORPORATIONGeneral Contractor107/08/2026
P.S.I. MECHANICALPlumbing107/08/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC2673208/18/2026
SOCOTEC ENGINEERING4983608/18/2026
WSP USA CORP1848804/17/2026
GRANT ENGINEERING2627801/07/2026
AK ENGINEERING PC678111/29/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSTROYBAT INC07/15/2026
DOB NOWGeneral ConstructionPermit IssuedSTROYBAT INC07/10/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC07/07/2026
DOB NOWMechanical SystemsPermit IssuedSTROYBAT INC07/02/2026
DOB NOWPlumbingSigned-offNICE PLUMBING CORP05/08/2026
DOB NOWSprinklersSigned-offREAL PLUMBING CORP03/12/2026
DOB NOWPlumbingPermit IssuedNICE PLUMBING CORP11/07/2025
DOB NOWGeneral ConstructionPermit IssuedNEXX CONSTRUCTION INC10/31/2025
DOB NOWPlumbingSigned-offMEGA PLBG CORP10/24/2025
DOB NOWPlumbingSigned-offREAL PLUMBING CORP10/23/2025
DOB NOWGeneral ConstructionPermit IssuedNEXX CONSTRUCTION INC09/24/2025
DOB NOWMechanical SystemsSigned-offNEXX CONSTRUCTION INC09/16/2025
DOB NOWStructuralPermit IssuedSTROYBAT INC07/15/2025
DOB NOWGeneral ConstructionPermit IssuedSTROYBAT INC07/07/2025
DOB NOWMechanical SystemsPermit IssuedSTROYBAT INC07/07/2025
DOB NOWStructuralSigned-offSTROYBAT INC05/27/2025
DOB NOWSprinklersSigned-offREAL PLUMBING CORP04/23/2025
DOB NOWMechanical SystemsSigned-offSTROYBAT INC04/22/2025
DOB NOWPlumbingSigned-offNICE PLUMBING CORP04/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC01/02/2025
DOB NOWSprinklersPermit IssuedREAL PLUMBING CORP11/01/2024
DOB NOWPlumbingPermit IssuedNICE PLUMBING CORP10/31/2024
DOB NOWMechanical SystemsSigned-offNEXX CONSTRUCTION INC10/22/2024
DOB NOWGeneral ConstructionPermit IssuedNEXX CONSTRUCTION INC10/16/2024
DOB NOWMechanical SystemsPermit IssuedSTROYBAT INC09/18/2024
DOB NOWGeneral ConstructionPermit IssuedSTROYBAT INC08/16/2024
DOB NOWStructuralPermit IssuedSTROYBAT INC08/16/2024
DOB NOWPlumbingSigned-offMEGA PLBG CORP06/26/2024
DOB NOWPlumbingSigned-offREAL PLUMBING CORP06/26/2024
DOB NOWGeneral ConstructionPermit IssuedNEXX CONSTRUCTION INC06/24/2024
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL12/21/2023
DOB NOWGeneral ConstructionSigned-offLEO STYLE CORPORATION12/20/2023
DOB NOWStructuralPermit IssuedCNY BUILDING CORP10/02/2023
DOB NOWMechanical SystemsPermit IssuedCNY BUILDING CORP08/23/2023
DOB NOWGeneral ConstructionPermit IssuedCNY BUILDING CORP08/23/2023
DOB NOWStructuralSigned-offINTERBORO SIGN & MAINTENA09/22/2022
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI09/22/2022
BISMHISSUEDARROW MECHANICAL CORP08/18/2020
BISMHISSUEDARROW MECHANICAL CORP08/03/2020
BISPLISSUEDBYPASS MECHANICAL CORP05/22/2020
+ 47 more permits on file
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
06/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2026Pass-Final Construction Permit WithdrawalPassView ↗
03/31/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/11/2026Fire-Resistant Penetrations and JointsMatthew Wavrospecial
08/11/2026Interior lighting powerMatthew Wavroenergy_progress
08/11/2026Lighting controlsMatthew Wavroenergy_progress
08/11/2026Fire-Resistance Rated ConstructionMatthew Wavroprogress
08/11/2026Energy Code Compliance InspectionsMatthew Wavroprogress
08/11/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/30/2026FinalSILVIAN MARCUSprogress
06/30/2026Structural Steel - WeldingSILVIAN MARCUSspecial
06/30/2026Structural Stability – Alterations of existing buildingsSILVIAN MARCUSspecial
06/30/2026Concrete - Cast-In-PlaceSILVIAN MARCUSspecial
06/30/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/30/2026Structural Steel - High Strength BoltingSILVIAN MARCUSspecial
06/30/2026Structural Steel - DetailsSILVIAN MARCUSspecial
04/02/2026Structural Stability – Alterations of existing buildings—special
03/11/2026Tenant Protection Plan Compliance—special
03/11/2026Fire-Resistant Penetrations and JointsMatthew Wavrospecial
03/11/2026Energy Code Compliance InspectionsMatthew Wavroprogress
03/11/2026Fire-Resistance Rated ConstructionMatthew Wavroprogress
03/11/2026Lighting controlsMatthew Wavroenergy_progress
03/11/2026Interior lighting powerMatthew Wavroenergy_progress
01/22/2026Structural Steel - WeldingSILVIAN MARCUSspecial
01/22/2026FinalSILVIAN MARCUSprogress
01/22/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
01/22/2026Concrete - Cast-In-PlaceSILVIAN MARCUSspecial
01/22/2026Structural Steel - High Strength BoltingSILVIAN MARCUSspecial
Latest 25 of 150.
▾Documents — 1,465 on file (BIS + DOB NOW)
▸Plans & Drawings61
▸DOB NOWPlans/Sketch55
09/02/2026M00777037-I1Request digital key ↗
09/02/2026M00777026-I1Request digital key ↗
08/28/2026M00928269-P1Request digital key ↗
Showing 3 of 55 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly6
08/28/2026M00960071-I1Request digital key ↗
08/28/2026M00960071-P2Request digital key ↗
08/23/2026M00963332-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits306
▸BISPLAN / WORK APPROVAL APPLICATION177
03/24/2023120064312Open ↗
07/01/2022120064312Open ↗
06/27/2022120064312Open ↗
Showing 3 of 177 on file for this type
▸BISWORK PERMIT APPLICATION107
02/10/2021123782175Open ↗
08/18/2020123782184Open ↗
08/03/2020123782175Open ↗
Showing 3 of 107 on file for this type
▸BISPLACE OF ASSEMBLY16
07/18/2025121705609Open ↗
07/17/2025121705609Open ↗
04/16/2025121705609Open ↗
Showing 3 of 16 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications434
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION141
08/27/2019123782175Open ↗
08/27/2019123782184Open ↗
06/03/2019123782175Open ↗
Showing 3 of 141 on file for this type
▸DOB NOWProgress Inspector Seal & Signature82
09/27/2026M00963215-P6Open ↗
09/27/2026M00963215-P6Open ↗
09/25/2026M00864036-P4Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature61
09/02/2026M00777026-I1Open ↗
08/28/2026M00960071-P2Open ↗
08/28/2026M00960071-I1Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature57
09/27/2026M00963215-P6Open ↗
09/25/2026M00864036-P4Open ↗
09/22/2026M00963215-S1Open ↗
Showing 3 of 57 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST45
06/03/2019123782175Open ↗
06/03/2019123782184Open ↗
Showing 2 of 45 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT22
06/03/2019123782175Open ↗
06/03/2019123782184Open ↗
Showing 2 of 22 on file for this type
▸Trade Schedules & Equipment60
▸BISSELF-CERT PLUMBING NOTICE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA13
06/16/2022123723239Open ↗
05/18/2022123723220Open ↗
08/06/2020122226215Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING10
04/23/2020123325357Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/16/2018123504779Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
03/03/2023120064312Open ↗
▸BISELECTRIC CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection19
▸DOB NOWStreet Tree Checklist13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTenant Protection Plan and Notes3
07/26/2019123782184Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos31
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
08/21/2019123782184Open ↗
07/24/2019123325348Open ↗
06/03/2019123782175Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
02/10/2021123782175Open ↗
02/10/2021123782175Open ↗
02/10/2021123782175Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/10/2021123782175Open ↗
01/08/2021123782184Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
05/11/2022123723220Open ↗
09/21/2021123325348Open ↗
05/14/2021123325357Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY18
09/21/2021123325348Open ↗
05/14/2021123325357Open ↗
02/10/2021123782175Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
08/18/2020123782184Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
03/03/2023120064312Open ↗
▸Approvals, Objections & Sign-offs164
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST74
06/17/2022123723239Open ↗
06/10/2022123723220Open ↗
09/21/2021123325348Open ↗
Showing 3 of 74 on file for this type
▸BISADMINISTRATIVE OBJECTIONS36
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 36 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION34
05/22/2020123325357Open ↗
Showing 1 of 34 on file for this type
▸BISSUPERSEDING LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISCCD1-Construction Code Determination5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/01/2022120064312Open ↗
Showing 1 of 4 on file for this type
▸BISSHED LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership55
▸BISCOST AFFIDAVIT45
02/10/2021123782175Open ↗
06/03/2019123782175Open ↗
06/03/2019123782184Open ↗
Showing 3 of 45 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
05/11/2022123723220Open ↗
05/11/2022123723239Open ↗
09/21/2021123325348Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Filing & Intake Forms202
▸BISADDITIONAL INFORMATION89
08/05/2025121705609Open ↗
07/12/2022121705609Open ↗
07/05/2022120064312Open ↗
Showing 3 of 89 on file for this type
▸BISEFILING COVER SHEET63
06/03/2019123782175Open ↗
06/03/2019123782184Open ↗
05/22/2019123723220Open ↗
Showing 3 of 63 on file for this type
▸BISBOROUGH INTAKE FORM43
03/03/2020122226215Open ↗
03/02/2020120064312Open ↗
02/24/2020122226215Open ↗
Showing 3 of 43 on file for this type
▸BISeFiling Job Application Cover Sheet4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents43
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWProperty Ownership Certification12
08/17/2026M00864036-P4Open ↗
08/17/2026M00864036-A4Open ↗
Showing 2 of 12 on file for this type
▸BISSupporting Document: Fee Exempt7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTCO - Supporting Documents2
04/15/2022120064312Open ↗
04/15/2022120064312Open ↗
▸DOB NOWFinal Survey2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type