← Back
BuildNYC
Primarily 2 family with 1 store or office
1719 68TH STREET
BROOKLYN · Bensonhurst · BIN 3134660
💬 Discuss this project
1935Year Built
2Stories
S2Building Class
R5Zoning
4,800 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: Jong Cheng Buddha Association · 3,060 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofJong Cheng Buddha Association1p · 1 filing · 18 docs
Floor 2Jong Cheng Buddha Association6p · 2 filings · 19 docs
Floor 1Jong Cheng Buddha Association3p · 1 filing · 18 docs
CellarJong Cheng Buddha Association26p · 4 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jong Cheng Buddha Association703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX Flame Solution105/03/2026
Upc Engineering802/27/2025
J&R Design and Inspection301/09/2023
Alberto Roman404/05/2021
CL Engineering103/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 338403/21/2026
Highquality Construction VNW1203/21/2026
Upc Engineering803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Acer ConstructionGeneral Contractor503/22/2026
So Plumbing & HeatingPlumbing307/08/2026
American Standard P&H CororpPlumbing307/08/2026
Tri State Plumbing & HeatingPlumbing207/08/2026
Prudigm Engineering LlcuElectrical203/21/2026
Yung CharkElectrical203/21/2026
Control Plumbing & HeatingPlumbing207/08/2026
Chark YungElectrical203/21/2026
KJK ElectricElectrical103/21/2026
Jabbie Industries Incorporated*General Contractor107/08/2026
KJK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JX Flame Solution7286105/03/2026
Welldone Inspection8628702/27/2025
J&R Design and Inspection6637401/09/2023
AR-Tech Engineering6659404/05/2021
Building Lifecycle
All (129)Filed (17)Permit Issued (12)Signed Off (7)Violation (7)Inspection (8)Objection (48)Special Inspection (30)
08/28/2026
Signed off — Alteration
RENOVATION OF AN EXISTING BUILDING AT 2ND FLOOR APARTMENT. REPAIR PARTITION WALL AND FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01395350-I1
06/16/2026
Permit issued — General Construction
B01395350-I1-GC
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Special inspection requirement — Interior lighting power
JIE ZHU
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/03/2026
Objection raised — Energy
06/03/2026
Objection raised — Cost
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Inspections
06/03/2026
Objection raised — Scope
06/03/2026
Objection raised — Scope
05/03/2026
Filed — Alteration
RENOVATION OF AN EXISTING BUILDING AT 2ND FLOOR APARTMENT. REPAIR PARTITION WALL AND FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01395350-I1
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
JIE ZHU
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIE ZHU
04/15/2026
Signed off — Alteration CO
Propose a new accessory use kitchen at Cellar for the temple. No change of egress. Obtain new Certificate of Occupancy.
B00795578-I1
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
03/05/2025
Special inspection requirement — Chimneys and vents
QIUFAN JIANG
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
03/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIUFAN JIANG
03/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIUFAN JIANG
03/05/2025
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
03/05/2025
Special inspection requirement — Final
QIUFAN JIANG
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
03/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIUFAN JIANG
02/27/2025
Filed — Alteration CO
Propose a new accessory use kitchen at Cellar for the temple. No change of egress. Obtain new Certificate of Occupancy.
B00795578-P7
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIUFAN JIANG
02/26/2025
Special inspection requirement — Final
QIUFAN JIANG
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIUFAN JIANG
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
02/26/2025
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
02/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
02/26/2025
Special inspection requirement — Chimneys and vents
QIUFAN JIANG
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIUFAN JIANG
01/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2024
Objection resolved — Addressed
10/11/2024
Objection raised — Other
10/07/2024
Filed — Alteration CO
Propose a new accessory use kitchen at Cellar for the temple. No change of egress. Obtain new Certificate of Occupancy.
B00795578-P6
10/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
10/02/2024
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
10/02/2024
Special inspection requirement — Final
QIUFAN JIANG
10/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
10/02/2024
Special inspection requirement — Chimneys and vents
QIUFAN JIANG
10/02/2024
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
10/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
10/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
10/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
09/12/2024
Signed off — Alteration CO
Propose a new accessory use kitchen at Cellar for the temple. No change of egress. Obtain new Certificate of Occupancy.
B00795578-S2
05/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/24/2024
Filed — Alteration CO
Propose a new accessory use kitchen at Cellar for the temple. No change of egress. Obtain new Certificate of Occupancy.
B00795578-P5
03/26/2024
Filed — Alteration CO
Propose a new accessory use kitchen at Cellar for the temple. No change of egress. Obtain new Certificate of Occupancy.
B00795578-P4
02/28/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJabbie Industries Incorporated*06/16/2026
DOB NOWPlumbingSigned-offDW Plumbing01/05/2024
DOB NOWMechanical SystemsPermit IssuedAcer Construction08/30/2023
DOB NOWPlumbingSigned-offDW Plumbing07/14/2023
DOB NOWBoiler EquipmentSigned-offAmerican Standard P&H Cororp01/17/2023
DOB NOWBoiler EquipmentSigned-offAmerican Standard P&H Cororp09/27/2022
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp10/19/2021
DOB NOWBoiler EquipmentSigned-offControl Plumbing & Heating05/18/2021
DOB NOWPlumbingSigned-offControl Plumbing & Heating05/17/2021
DOB NOWBoiler EquipmentSigned-offNicholas Suida04/06/2021
DOB NOWBoiler EquipmentSigned-offNicholas Suida08/18/2020
DOB NOWPlumbingSigned-offNicholas Suida07/02/2020
BISOTISSUEDHigh Quality Construction07/01/2020
BISOTISSUEDJump Tech Construction05/12/2003
BIS—ISSUEDJump Tech Construction05/12/2003
BISPLISSUEDK & BH Plumbing & Heating03/07/2003
BIS—ISSUEDJump Tech Construction03/06/2003
BISPLISSUEDK & BH Plumbing & Heating03/04/2003
BISOTISSUEDJump Tech Construction01/09/2003
1 project · most recent 02/27/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/27/2025Permit IssuedAcer ConstructionVentilation Systems
Ventilation
Delhi BI-20 5,250 CFM · Exhaust Fan ×3
1 project · most recent 02/27/2025
Gas Water/Sanitary
FiledStatusContractorScope
02/27/2025Signed-offTri State Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 08/14/2026
General Wiring
FiledStatusContractorScope
08/14/2026CompleteJ Y Electric—
09/30/2025CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
06/15/2026Interior lighting powerJIE ZHUenergy_progress
04/30/2026Energy Code Compliance InspectionsJIE ZHUprogress
04/30/2026Fire-Resistant Penetrations and JointsJIE ZHUspecial
03/05/2025Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
03/05/2025Chimneys and ventsQIUFAN JIANGspecial
03/05/2025Mechanical SystemsQIUFAN JIANGspecial
03/05/2025Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
03/05/2025FinalQIUFAN JIANGprogress
03/05/2025Energy Code Compliance InspectionsQIUFAN JIANGprogress
03/05/2025HVAC-R and service water heating equipmentQIUFAN JIANGenergy_progress
03/05/2025HVAC-R and service water heating system controlsQIUFAN JIANGenergy_progress
03/05/2025HVAC-R and service water piping design and insulationQIUFAN JIANGenergy_progress
02/26/2025HVAC-R and service water piping design and insulationQIUFAN JIANGenergy_progress
02/26/2025HVAC-R and service water heating equipmentQIUFAN JIANGenergy_progress
02/26/2025HVAC-R and service water heating system controlsQIUFAN JIANGenergy_progress
02/26/2025FinalQIUFAN JIANGprogress
02/26/2025Energy Code Compliance InspectionsQIUFAN JIANGprogress
02/26/2025Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
02/26/2025Mechanical SystemsQIUFAN JIANGspecial
02/26/2025Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
02/26/2025Chimneys and ventsQIUFAN JIANGspecial
10/02/2024Chimneys and ventsQIUFAN JIANGspecial
10/02/2024Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
10/02/2024Mechanical SystemsQIUFAN JIANGspecial
10/02/2024Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
Latest 25 of 61.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Jong Cheng Buddha AssociationReligiousCellar, Floors 1, 2
Project B00795578 Alteration CO · LOC Issued · 10/04/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch10
08/28/2026B08049537-I1Request digital key ↗
08/26/2026B00795578-P7Request digital key ↗
08/26/2026B00795578-P6Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/02/2026B00358352-S3Request digital key ↗
09/01/2026B00474380-I1Request digital key ↗
08/15/2026B00358352-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00358352-I1Request digital key ↗
09/02/2026B00358352-P4Request digital key ↗
08/15/2026B00358352-P1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
06/16/2020340736369Open ↗
▸BISWORK PERMIT APPLICATION1
07/01/2020340736369Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/30/2020340736369Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00795578-I1Open ↗
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature28
09/28/2026B00795578-P6Open ↗
09/28/2026B00795578-P6Open ↗
09/23/2026B08049537-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/28/2026B00795578-P6Open ↗
09/28/2026B00795578-P6Open ↗
09/28/2026B00795578-P6Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00474380-I1Open ↗
08/28/2026B08049537-I1Open ↗
08/26/2026B00795578-P1Open ↗
Showing 3 of 17 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/16/2020340736369Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/16/2020340736369Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/16/2020340736369Open ↗
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan6
08/13/2026B00358352-P4Open ↗
08/13/2026B00358352-I1Open ↗
08/13/2026B00358352-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Checklist4
08/13/2026B00795578-P7Open ↗
08/13/2026B00795578-I1Open ↗
08/13/2026B00795578-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
06/16/2020340736369Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/01/2026B00474380-I1Open ↗
08/26/2026B00795578-P7Open ↗
08/26/2026B00795578-P6Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/16/2020340736369Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/07/2021340736369Open ↗
07/01/2020340736369Open ↗
06/16/2020340736369Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/16/2020340736369Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/07/2021340736369Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00474380-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/07/2021340736369Open ↗
07/07/2021340736369Open ↗
07/01/2020340736369Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/07/2021340736369Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/07/2021340736369Open ↗
06/16/2020340736369Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
06/16/2020340736369Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/16/2020340736369Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/26/2026B00795578-P7Open ↗
08/26/2026B00795578-P6Open ↗
08/15/2026B00795578-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00795578-I1Open ↗