← Back
Health center, child center, clinic
1719 HYLAN BOULEVARD
STATEN ISLAND · BIN 5169844
💬 Discuss this project
2018Year Built
3Stories
I5Building Class
R3-2Zoning
15,277 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Health center, child center, clinic · Owner of record: 1719 HYLAND BLVD VENTURES LLC · 9,635 sf lot · 1.59 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP807/08/2026
MAMMOTH2107/08/2026
RCM GROUP1104/09/2026
MAMMOUTH INC103/22/2026
1719 HYLAN1003/21/2026
1719 HYLAN BLVD VENTURES LLC703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.105/31/2026
GEORGE SIGALOS P.E.302/27/2026
FL&M ENGINEERING DESIGN &INSPECTION101/07/2021
JOEL PHAGOO P.E. PLLC110/09/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C603/21/2026
A1 EXPEDITING SERVICE203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor1207/08/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor107/08/2026
MPC PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAMBORRA ARCHITECTURE5339202/27/2026
A TECH ENGINEERING NYC, P6738101/20/2026
Building Lifecycle
All (57)Filed (6)Permit Issued (9)Signed Off (3)Violation (31)Inspection (4)Special Inspection (4)
05/31/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01391891-I1
03/25/2026
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH NB 520295190
S01154480-I1
03/05/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/02/2026
Special inspection requirement — Sprinkler Systems
Nicholas Tamborra
02/27/2026
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH NB 520295190
S01154480-P2
02/27/2026
Special inspection requirement — Sprinkler Systems
Nicholas Tamborra
02/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/20/2026
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH NB 520295190
S01154480-P1
12/30/2025
Violation issued (ECB, closed)
Construction
12/30/2025
Violation issued (ECB, closed)
Unknown
12/29/2025
Violation issued (ECB, closed)
Unknown
10/15/2025
Permit issued — Plumbing
S01154480-I1-PL
09/24/2025
Permit issued — Sprinklers
S01154480-I1-EW-SP
06/18/2025
Violation issued (ECB, closed)
Construction
03/14/2025
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH NB 520295190
S01154480-I1
08/27/2024
Violation issued (ECB, closed)
Unknown
03/20/2023
Violation issued (ECB, closed)
Construction
01/21/2023
Violation issued (ECB, closed)
Construction
10/28/2022
Violation issued (ECB, closed)
Construction
05/26/2021
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
S00086269-I1
04/09/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS, SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OR OCCUPANCY,
S00445500-I1
01/11/2021
Permit issued — Supported Scaffold
S00445500-I1-SF
01/07/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS, SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OR OCCUPANCY,
S00445500-I1
01/06/2021
Violation issued (ECB, closed)
Signs
12/30/2020
Special inspection requirement — Final
FADY HABEEL
12/16/2020
Permit issued — Sidewalk Shed
S00086269-I1-SH
09/25/2020
Violation issued (ECB, closed)
Construction
05/13/2020
Permit issued — Sidewalk Shed
S00086269-I1-SH
12/02/2019
Permit issued — Sidewalk Shed
S00086269-I1-SH
08/29/2019
Violation issued (ECB, closed)
Construction
05/15/2019
Permit issued — Sidewalk Shed
S00086269-I1-SH
12/11/2018
Permit issued — Sidewalk Shed
S00086269-I1-SH
10/09/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
S00086269-I1
10/09/2018
Permit issued — Sidewalk Shed
S00086269-I1-SH
10/09/2018
Special inspection requirement — Final
JOEL PHAGOO
04/06/2018
Violation issued (ECB, closed)
Construction
02/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/13/2017
Violation issued (ECB, closed)
Construction
11/13/2017
Violation issued (ECB, closed)
Construction
11/13/2017
Violation issued (ECB, closed)
Construction
11/13/2017
Violation issued (ECB, closed)
Construction
11/13/2017
Violation issued (ECB, closed)
Construction
11/13/2017
Violation issued (ECB, closed)
Construction
11/13/2017
Violation issued (ECB, closed)
Construction
06/29/2016
Violation issued (ECB, closed)
Construction
02/25/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/1999
Violation issued (ECB, closed)
Construction
02/06/1996
Violation issued (ECB, closed)
Construction
04/02/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/1992
Violation issued (ECB, closed)
Construction
10/10/1989
Violation issued (ECB, closed)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN10/15/2025
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC09/24/2025
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES01/11/2021
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP12/16/2020
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/13/2020
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP12/02/2019
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/15/2019
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP12/11/2018
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP10/09/2018
BISPLISSUEDMPC PLUMBING & HEATING INC01/16/2026
BIS—ISSUEDMAMMOTH INC03/20/2025
BIS—ISSUEDMAMMOTH INC03/19/2025
BISPLISSUEDMPC PLUMBING & HEATING INC11/14/2024
BISEQISSUEDMAMMOTH INC10/10/2024
BISEQISSUEDMAMMOTH INC09/20/2023
BIS—ISSUEDMAMMOTH INC07/11/2023
BISEQISSUEDMAMMOTH INC09/21/2022
BIS—ISSUEDMAMMOTH INC06/30/2022
BIS—ISSUEDMAMMOTH INC10/05/2021
BISEQISSUEDMAMMOTH INC10/01/2021
BIS—ISSUEDMAMMOTH INC07/27/2021
BIS—ISSUEDMAMMOTH INC11/09/2020
BISEQISSUEDMAMMOTH INC09/22/2020
BISEQISSUEDMAMMOTH INC09/13/2019
BISPLISSUEDMPC PLUMBING & HEATING INC03/04/2019
BIS—ISSUEDMAMMOTH INC10/02/2018
BISEQISSUEDMAMMOTH INC09/11/2018
BIS—ISSUEDMAMMOTH INC07/13/2018
BISPLISSUEDMPC PLUMBING & HEATING INC03/27/2018
BIS—ISSUEDMAMMOTH INC09/14/2017
BISEQISSUEDMAMMOTH INC09/14/2017
BISFPISSUEDFIRE COMMAND CO; INC.03/11/1999
BISOTISSUEDPAUL LOMBARDI CONSTRUCTION04/17/1992
7 projects · most recent 04/18/2026
General Wiring
FiledStatusContractorScope
04/18/2026CompleteASKO ELEC CONST & MAIN IN—
04/16/2025CompleteKJK ELECTRIC INC—
03/31/2025CompleteKJK ELECTRIC INC—
11/03/2024CompleteKINGS ELECTRIC CO., INC.General Wiring
10/11/2018CancelledJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
10/05/2018CompleteJ.P.E. ELEC'L CONTR'S INC1 meters, 1 new_meters
10/04/2018CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/05/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/02/2026Sprinkler SystemsNicholas Tamborraspecial
02/27/2026Sprinkler SystemsNicholas Tamborraspecial
12/30/2020FinalFADY HABEELprogress
10/09/2018FinalJOEL PHAGOOprogress
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/26/2026S00086269-I1Request digital key ↗
08/16/2026S01391891-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/25/2026S00445500-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION15
02/25/2026500035552Open ↗
02/25/2026500035552Open ↗
02/25/2026540149007Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
10/07/2025520295797Open ↗
03/25/2025520295797Open ↗
10/29/2018520295797Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/25/2017520295797Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
06/20/2018540149007Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026S01391891-I1Open ↗
08/13/2026S01154480-P2Open ↗
08/13/2026S00445500-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/19/2026S00445500-I1Open ↗
08/27/2026S00086269-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01154480-P2Open ↗
08/23/2026S01154480-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/20/2018540149007Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/20/2018540149007Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/20/2018540149007Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/20/2018540149007Open ↗
▸Inspections & Test Reports4
▸BISHYDRAULIC FLOW CALCULATIONS1
06/20/2018540149007Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/25/2017520295797Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/20/2018540149007Open ↗
▸BISHYDRO FLOW TEST LETTER1
06/20/2018540149007Open ↗
▸Approvals, Objections & Sign-offs10
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff4
10/07/2025520295797Open ↗
03/25/2025520295797Open ↗
10/29/2018520295797Open ↗
Showing 3 of 4 on file for this type
▸BISLetter from Homeowner for Withdrawal3
02/25/2026500035552Open ↗
02/23/2026500341702Open ↗
02/18/2026500837525Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/27/2018520319879Open ↗
07/07/2016520295797Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/25/2017520295797Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/27/2018520319879Open ↗
06/20/2018540149007Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
10/07/2025520295797Open ↗
03/25/2025520295797Open ↗
10/29/2018520295797Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
08/27/2018520319879Open ↗
07/07/2016520295797Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/20/2018540149007Open ↗
▸Other Documents12
▸BISBPP - SUPPORTING DOCUMENTATION5
10/07/2025520295797Open ↗
03/25/2025520295797Open ↗
07/25/2017520295797Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form5
03/25/2025520295797Open ↗
10/05/2018520295797Open ↗
07/18/2017520295797Open ↗
Showing 3 of 5 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
06/20/2018540149007Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
10/07/2025520295797Open ↗