Locations of Work
ArchitecturePlumbingCivil
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar17p · 3 filings · 20 docs
Basement1p · 1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2019$1.1M—— → —$802/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHANDA ENGINEERING CONSULTANT PC711/03/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.ALAM HOME IMPROVEMENTGeneral Contractor303/21/2026
PHILCO PLUMBING CORPPlumbing207/08/2026
PADMA CONTRACTING CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842711/03/2023
Building Lifecycle
All (74)Filed (7)Permit Issued (4)Signed Off (2)Inspection (9)Objection (30)Special Inspection (22)
02/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/03/2024
Signed off — Alteration
Replace boilers and hot water heaters with related gas piping in cellar floor. Install new two fixture bathroom and laundry equipment (washer, dryer and slop sink) in cellar. 2nd Floor kitchen sink and cooking oven installation.
Q00630765-I1
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
11/20/2023
Special inspection requirement — Lighting in dwelling units
KARTIK CHANDA
11/20/2023
Special inspection requirement — Energy Code Compliance Inspections
KARTIK CHANDA
11/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
11/15/2023
Objection resolved — Addressed
11/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2023
Objection raised — Scope
11/03/2023
Filed — Alteration CO
Application being filled to convert one to two family dwelling unit with existing bulk. To obtained new certification of occupancy.
Q00792910-P1
11/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
11/03/2023
Special inspection requirement — Lighting in dwelling units
KARTIK CHANDA
11/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
11/03/2023
Special inspection requirement — Energy Code Compliance Inspections
KARTIK CHANDA
10/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/22/2023
Signed off — Alteration
Install new boiler room, one new two fixture bathroom, laundry washer, sink & dryer and interior finishes in cellar floor area. No change bulk, egress, use and occupancy.
Q00622197-I1
09/20/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
09/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
09/15/2023
Special inspection requirement — Energy Code Compliance Inspections
KARTIK CHANDA
09/08/2023
Filed — Alteration
Install new boiler room, one new two fixture bathroom, laundry washer, sink & dryer and interior finishes in cellar floor area. No change bulk, egress, use and occupancy.
Q00622197-P1
08/28/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
08/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
08/28/2023
Special inspection requirement — Energy Code Compliance Inspections
KARTIK CHANDA
07/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
KARTIK CHANDA
07/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
KARTIK CHANDA
07/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
07/27/2023
Special inspection requirement — Maintenance information
KARTIK CHANDA
07/22/2023
Filed — Alteration
Replace boilers and hot water heaters with related gas piping in cellar floor. Install new two fixture bathroom and laundry equipment (washer, dryer and slop sink) in cellar. 2nd Floor kitchen sink and cooking oven installation.
Q00630765-P2
07/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
07/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
KARTIK CHANDA
07/22/2023
Special inspection requirement — Maintenance information
KARTIK CHANDA
07/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
KARTIK CHANDA
07/01/2023
Permit issued — General Construction
Q00792910-I1-GC
06/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2023
Permit issued — Plumbing
Q00630765-I1-PL
12/18/2022
Objection resolved — Addressed
12/18/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Admin
11/30/2022
Objection raised — Accessibility
11/26/2022
Filed — Alteration
Replace boilers and hot water heaters with related gas piping in cellar floor. Install new two fixture bathroom and laundry equipment (washer, dryer and slop sink) in cellar. 2nd Floor kitchen sink and cooking oven installation.
Q00630765-P1
09/02/2022
Objection raised — Other
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Fire_Protection
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Zoning
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Other
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Fire_Protection
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Other
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Zoning
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Scope
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Fire_Protection
09/02/2022
Objection resolved — Addressed
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPADMA CONTRACTING CORP07/01/2023
DOB NOWPlumbingSigned-offALL ABOUT P & H OF NY INC03/23/2023
DOB NOWPlumbingSigned-offALL ABOUT P & H OF NY INC03/11/2022
DOB NOWGeneral ConstructionSigned-offJ.ALAM HOME IMPROVEMENT02/25/2022
3 projects · most recent 03/05/2024
General Wiring
FiledStatusContractorScope
03/05/2024CompleteADAM ELECL CONTRNG LLCGeneral Wiring
01/16/2024CompleteADAM ELECL CONTRNG LLCGeneral Wiring
12/05/2019CompleteADAM ELECL CONTRNG LLC2 meters, 2 new_meters
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/20/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/28/2023Fail-Final General Construction Non-Directive 14FailView ↗
06/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/20/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
11/20/2023Lighting in dwelling unitsKARTIK CHANDAenergy_progress
11/20/2023Energy Code Compliance InspectionsKARTIK CHANDAprogress
11/20/2023Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
11/03/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
11/03/2023Lighting in dwelling unitsKARTIK CHANDAenergy_progress
11/03/2023Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
11/03/2023Energy Code Compliance InspectionsKARTIK CHANDAprogress
09/15/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
09/15/2023Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
09/15/2023Energy Code Compliance InspectionsKARTIK CHANDAprogress
08/28/2023Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
08/28/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
08/28/2023Energy Code Compliance InspectionsKARTIK CHANDAprogress
07/27/2023HVAC-R and service water heating system controlsKARTIK CHANDAenergy_progress
07/27/2023HVAC-R and service water heating equipmentKARTIK CHANDAenergy_progress
07/27/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
07/27/2023Maintenance informationKARTIK CHANDAenergy_progress
07/22/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
07/22/2023HVAC-R and service water heating system controlsKARTIK CHANDAenergy_progress
07/22/2023Maintenance informationKARTIK CHANDAenergy_progress
07/22/2023HVAC-R and service water heating equipmentKARTIK CHANDAenergy_progress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00622197-P1Request digital key ↗
08/24/2026Q00630765-I1Request digital key ↗
08/24/2026Q00630765-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00792910-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00792910-I1Open ↗
09/01/2026Q00792910-I1Open ↗
09/01/2026Q00792910-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00622197-P1Open ↗
08/27/2026Q00622197-I1Open ↗
08/24/2026Q00630765-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00792910-I1Open ↗
08/29/2026Q00622197-P1Open ↗
08/28/2026Q00630765-P2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00792910-I1Open ↗
08/13/2026Q00792910-P1Open ↗
▸DOB NOWTenant Protect Plan and Notes TPP11
08/13/2026Q00622197-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00792910-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00622197-P1Open ↗
08/24/2026Q00630765-I1Open ↗
08/24/2026Q00630765-P2Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00630765-I1Open ↗
08/13/2026Q00792910-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/15/2026Q00792910-I1Open ↗
08/14/2026Q00792910-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00792910-I1Open ↗