← Back
Three families
172-24 93 AVENUE
QUEENS · Jamaica · BIN 4217663
💬 Discuss this project
2023Year Built
3Stories
C0Building Class
R5Zoning
3,420 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 4,676 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Roof14p · 2 filings · 20 docs
Floor 312p · 2 filings · 20 docs
Floor 213p · 2 filings · 20 docs
Floor 113p · 2 filings · 20 docs
Cellar16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THC CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC212/28/2025
AMERILAND BROOK LLC508/27/2025
BRIAN ILL DEVELOPMENT LLC208/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC403/21/2026
AMERGY SOLAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THC CONSTRUCTION INCGeneral Contractor1604/09/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
AMERGY SOLAR INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802212/28/2025
AMERILAND BROOK LLC1506408/27/2025
Building Lifecycle
All (77)Filed (9)Permit Issued (14)Signed Off (4)Violation (4)Inspection (16)Special Inspection (30)
08/14/2026
Signed off — Alteration
Q00780235-I1
04/21/2026
Signed off — Alteration
FILE PL & SP WORKTYPE IN CONJUCNTION WITH NB JOB#Q00780178
Q00780233-I1
04/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/16/2026
Signed off — Alteration
INSTALL 8' CONSTRUCTION FENCE AT ABOVE ADDRESS.
Q00780236-I1
01/08/2026
Signed off — Alteration
Q01273069-I1
12/29/2025
Special inspection requirement — Final
Kaijin Liang
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
12/29/2025
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
12/28/2025
Filed — Alteration
Q01273069-P1
12/28/2025
Special inspection requirement — Final
Kaijin Liang
12/28/2025
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
12/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
12/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
12/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
11/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/17/2025
Permit issued — Solar
Q01273069-I1-SL
11/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/11/2025
Filed — Alteration
Q01273069-I1
11/11/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/31/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/27/2025
Permit issued — Sprinklers
Q00780233-I1-EW-SP
10/24/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/14/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/29/2025
Permit issued — Curb Cut
Q00780235-I1-CC
09/16/2025
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Masonry
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Structural Steel - Welding
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Metering
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Structural Steel - Details
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Air barrier — testing
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Final
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
09/16/2025
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
09/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
08/27/2025
Filed — New Building
PROPOSE A NEW (3) THREE STORY WITH (3) THREE FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q00780178-P1
08/11/2025
Filed — Alteration
FILE PL & SP WORKTYPE IN CONJUCNTION WITH NB JOB#Q00780178
Q00780233-P2
07/15/2025
Violation issued (ECB, closed)
Construction
07/07/2025
Permit issued — Sprinklers
Q00780233-I1-PL
06/06/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/04/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/02/2025
Permit issued — Mechanical Systems
Q00780178-I1-GC
05/30/2025
Permit issued — Construction Fence
Q00780236-I1-FN
10/21/2024
Permit issued — Foundation
Q00780178-I1-GC
07/16/2024
Permit issued — Construction Fence
Q00780236-I1-FN
07/03/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/03/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC11/17/2025
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.10/27/2025
DOB NOWCurb CutSigned-offTHC CONSTRUCTION INC09/29/2025
DOB NOWSprinklersSigned-offWATSON'S PLBG, HTG, & BDG07/07/2025
DOB NOWMechanical SystemsPermit IssuedTHC CONSTRUCTION INC06/02/2025
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC05/30/2025
DOB NOWFoundationPermit IssuedTHC CONSTRUCTION INC10/21/2024
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC07/16/2024
DOB NOWSprinklersSigned-offWATSON'S PLBG, HTG, & BDG12/11/2023
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC11/08/2023
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC11/08/2023
DOB NOWMechanical SystemsPermit IssuedTHC CONSTRUCTION INC11/08/2023
DOB NOWEarth WorkPermit IssuedTHC CONSTRUCTION INC11/08/2023
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC07/13/2023
BIS—ISSUEDTHC CONSTRUCTION INC07/18/2023
1 project · most recent 08/27/2025
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2025Permit IssuedTHC CONSTRUCTION INCAssociated Ducts and Piping, Heating Systems
Heating
Williamson GWA-100 100,000 BTU · Boiler ×6
Ducts & Piping
Delta Breeze SLIM50 20 CFM · Exhaust Fan ×10
Air King EB30BL 130 CFM · Kitchen Exhaust ×6
3 projects · most recent 11/26/2025
General Wiring
FiledStatusContractorScope
11/26/2025CompleteAL-LECTRIC ELECT'L CONTRG—
11/11/2025CompleteI.P. ELECTRIC INC—
05/30/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 08/27/2025
Masonry
FiledStatusContractorScope
08/27/2025Permit IssuedTHC CONSTRUCTION INCMasonry
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
04/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/24/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/14/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/06/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/04/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/03/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
12/29/2025Air barrier - visual inspectionKaijin Liangenergy_progress
12/29/2025Energy Code Compliance InspectionsKaijin Liangprogress
12/29/2025Structural Stability – Alterations of existing buildingsKaijin Liangspecial
12/29/2025FinalKaijin Liangprogress
12/29/2025Fire-Resistant Penetrations and JointsKaijin Liangspecial
12/28/2025Air barrier - visual inspectionKaijin Liangenergy_progress
12/28/2025FinalKaijin Liangprogress
12/28/2025Energy Code Compliance InspectionsKaijin Liangprogress
12/28/2025Fire-Resistant Penetrations and JointsKaijin Liangspecial
12/28/2025Structural Stability – Alterations of existing buildingsKaijin Liangspecial
09/16/2025Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
09/16/2025Fenestration areasXIAOHONG ZHAOenergy_progress
09/16/2025Permanent certificateXIAOHONG ZHAOenergy_progress
09/16/2025Fenestration air leakageXIAOHONG ZHAOenergy_progress
09/16/2025HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
09/16/2025MeteringXIAOHONG ZHAOenergy_progress
09/16/2025Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
09/16/2025HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
09/16/2025HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
09/16/2025Maintenance informationXIAOHONG ZHAOenergy_progress
09/16/2025Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
09/16/2025Interior lighting powerXIAOHONG ZHAOenergy_progress
09/16/2025Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
09/16/2025Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
09/16/2025Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
Latest 25 of 102.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026Q00780236-I1Request digital key ↗
08/26/2026Q00780235-I1Request digital key ↗
08/19/2026Q00780233-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
10/26/2022440744508Open ↗
09/19/2022421808280Open ↗
08/08/2022421808280Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
11/06/2025440744508Open ↗
10/26/2022440744508Open ↗
▸BISWORK PERMIT APPLICATION1
10/31/2023421805675Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
02/06/2023421808280Open ↗
10/26/2022440744508Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026Q00780178-I1Open ↗
08/13/2026Q00780178-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026Q00780178-I1Open ↗
08/13/2026Q00780178-P1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/06/2023421808280Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/06/2023421808280Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00780178-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026Q00780233-I1Open ↗
09/23/2026Q00780233-I1Open ↗
08/28/2026Q00780178-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026Q00780233-I1Open ↗
08/28/2026Q00780178-P1Open ↗
08/28/2026Q00780178-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00780236-I1Open ↗
08/19/2026Q00780233-I1Open ↗
08/19/2026Q00780178-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/26/2022440744508Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/26/2022440744508Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/19/2026Q00780178-I1Open ↗
08/13/2026Q00780178-P1Open ↗
▸BISGAS CUT-OFF1
10/31/2023421805675Open ↗
▸BISELECTRIC CUT-OFF1
10/31/2023421805675Open ↗
▸BISSEWER CUT-OFF1
10/31/2023421805675Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist2
08/19/2026Q00780178-I1Open ↗
08/13/2026Q00780178-P1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/31/2023421805675Open ↗
▸BISSTREET TREE CHECKLIST1
10/26/2022440744508Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
10/31/2023421805675Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
10/31/2023421805675Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/31/2023421805675Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00780178-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/31/2023421805675Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00780233-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/19/2026Q00780178-I1Open ↗
08/13/2026Q00780178-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00780178-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION7
10/31/2023421805675Open ↗
10/31/2023421805675Open ↗
10/31/2023421805675Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01273069-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/31/2023421805675Open ↗
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
10/31/2023421805675Open ↗
09/19/2022421808280Open ↗
04/13/2022421805675Open ↗
▸BISEFILING COVER SHEET2
09/19/2022421808280Open ↗
04/13/2022421805675Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/26/2022440744508Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/26/2022440744508Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/19/2026Q00780178-I1Open ↗
08/13/2026Q00780178-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026Q00780178-I1Open ↗
08/13/2026Q00780178-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026Q00780178-I1Open ↗
08/13/2026Q00780178-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/26/2022440744508Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00780178-I1Open ↗