← Back
BuildNYC
Miscellaneous religious facility
172-70 BAISLEY BOULEVARD
QUEENS · BIN 4270060
💬 Discuss this project
1972Year Built
2Stories
M9Building Class
R5BZoning
9,379 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Miscellaneous religious facility · Owner of record: Christ Church Intern · 20,500 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofChrist Church International1p · 1 filing · 4 docs
Floor 1Christ Church International22p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Christ Church International1107/08/2026
Idlewild Estates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pinnacle309/01/2022
Petrvs103/28/2022
Jim Kusi PE203/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bohler Engineering403/21/2026
Dockery Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GibianGeneral Contractor203/21/2026
Anco Electl ContctngElectrical103/22/2026
Absolute Cooling and HeatingGeneral Contractor107/08/2026
Metal Men FabricatorsGeneral Contractor107/08/2026
Bluewater Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PE and Consultants New YO8161409/01/2022
Jim Kusi, PE3757203/25/2022
Building Lifecycle
All (32)Filed (6)Permit Issued (4)Signed Off (4)Violation (5)Inspection (3)Objection (4)Special Inspection (6)
10/28/2022
Signed off — Alteration
Q00695014-I1
10/17/2022
Signed off — Alteration
New Plumbing fixtures and associated piping as per plans. There will be no change in use, egress, or occupancy.
Q00695085-I1
10/17/2022
Signed off — Alteration
HVAC modifications and associated ductwork and related finishes. There will be no change in use, egress, or occupancy.
Q00695056-I1
09/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
09/01/2022
Filed — Alteration
New Plumbing fixtures and associated piping as per plans. There will be no change in use, egress, or occupancy.
Q00695085-P1
07/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/18/2022
Permit issued — Mechanical Systems
Q00695056-I1-MS
05/17/2022
Signed off — Alteration
REPLACEMENT OF EXISTING 15 TON ROOFTOP HVAC UNIT, NO CHANGE IN USE OCCUPANCY OR EGRESS.
Q00487445-I1
05/03/2022
Permit issued — Plumbing
Q00695085-I1-PL
04/27/2022
Permit issued — General Construction
Q00695014-I1-GC
04/19/2022
Special inspection requirement — Mechanical Systems
Jim Kusi
04/19/2022
Special inspection requirement — Final
Jim Kusi
03/30/2022
Objection raised — Scope
03/30/2022
Objection resolved — Addressed
03/30/2022
Objection raised — Energy
03/30/2022
Objection resolved — Addressed
03/28/2022
Filed — Alteration
Q00695014-I1
03/25/2022
Filed — Alteration
New Plumbing fixtures and associated piping as per plans. There will be no change in use, egress, or occupancy.
Q00695085-I1
03/25/2022
Filed — Alteration
HVAC modifications and associated ductwork and related finishes. There will be no change in use, egress, or occupancy.
Q00695056-I1
03/25/2022
Filed — Alteration
REPLACEMENT OF EXISTING 15 TON ROOFTOP HVAC UNIT, NO CHANGE IN USE OCCUPANCY OR EGRESS.
Q00487445-P1
03/09/2022
Special inspection requirement — Mechanical Systems
DEV SRINIVAS
03/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEV SRINIVAS
03/09/2022
Special inspection requirement — Final
DEV SRINIVAS
03/04/2022
Permit issued — Mechanical Systems
Q00487445-I1-MS
04/13/2021
Filed — Alteration
REPLACEMENT OF EXISTING 15 TON ROOFTOP HVAC UNIT, NO CHANGE IN USE OCCUPANCY OR EGRESS.
Q00487445-I1
07/31/2020
Violation issued (FDNY_NOV, closed)
03/03/2018
Violation issued (FDNY_NOV, closed)
10/19/2017
Violation issued (FDNY_NOV, closed)
03/06/2015
Violation issued (FDNY_NOV, closed)
04/26/2004
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMetal Men Fabricators05/18/2022
DOB NOWPlumbingSigned-offBluewater Plumbing & Heating05/03/2022
DOB NOWGeneral ConstructionSigned-offGibian04/27/2022
DOB NOWMechanical SystemsSigned-offAbsolute Cooling Heat03/04/2022
BIS—ISSUEDDonnelly Construction03/23/1999
BISSPISSUEDTheodore Wagner PLG03/12/1999
BISPLRE-ISSUEDTheodore Wagner PLG08/12/1998
BISOTISSUEDDonnelly Construction07/22/1998
4 projects · most recent 06/27/2024
General Wiring
FiledStatusContractorScope
06/27/2024Permit IssuedAnco Electl Contctng1 meters
08/22/2022CompleteHaber Electric CoGeneral Wiring
04/04/2018CompleteAnco Electl ContctngGeneral Wiring
03/09/2018CompleteAnco Electl Contctng—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/09/2022Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
04/19/2022Mechanical SystemsJim Kusispecial
04/19/2022FinalJim Kusiprogress
03/09/2022Mechanical SystemsDEV SRINIVASspecial
03/09/2022Fire-Resistant Penetrations and JointsDEV SRINIVASspecial
03/09/2022FinalDEV SRINIVASprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Christ Church InternationalReligiousFloor 1, Roof
Project Q00695056 Alteration · LOC Issued · 03/25/2022
Project Q00695085 Alteration · LOC Issued · 03/25/2022
Project Q00487445 Alteration · LOC Issued · 04/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00487445-P1Request digital key ↗
08/26/2026Q00487445-I1Request digital key ↗
08/26/2026Q00695085-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00487445-I1Open ↗
08/26/2026Q00695085-P1Open ↗
08/26/2026Q00695085-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026Q00695056-I1Open ↗
08/28/2026Q00695056-I1Open ↗
08/28/2026Q00487445-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00695056-I1Open ↗
08/28/2026Q00487445-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00695085-P1Open ↗
08/26/2026Q00695085-I1Open ↗
08/26/2026Q00695014-I1Open ↗
Showing 3 of 4 on file for this type