← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Ebbetts Field Apartments
1720 BEDFORD AVENUE · BIN 3034357
💬 Discuss this project
1960Year Built
25Stories
D1Building Class
R7-1Zoning
1,435,162 sfGross Floor Area
1,321Units
LL97 CoveredRent Stabilized1,312 Active Violations 1,301 unresolved · 11 paperwork only 3 likely answered ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Fieldbridge Associates · 250,325 sf lot · 5.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarBoiler replacement6p · 2 filings · 13 docs
Site & exteriorHeavy duty sidewalk shed installation5p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fieldbridge Associates2503/22/2026
J & G Costruction Services203/21/2026
City Studios103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company308/02/2024
Ashraf107/26/2024
Pve Associates105/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company603/21/2026
AE Design Solution203/21/2026
Northeast Expediting203/21/2026
Rigid Structural Design103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold404/09/2026
Millar Elevator IndustriesElectrical403/21/2026
Service Tech Mechanical & PlumbingPlumbing307/08/2026
Lawrence Exterior Restorationspecialty_contractor203/21/2026
Alson Electrical ContractingElectrical103/21/2026
WCK ElectricElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851308/02/2024
Ase Engineering5785105/03/2024
Partridge Venture Engineering7690105/03/2024
Leo Y Lee Associates2481104/15/2024
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
07/08/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/26/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8D, 8th…
HPD violation · closed
05/26/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CELING, NORTH WALL AND EAST WALL IN THE 2nd…
HPD violation · closed
05/14/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT…
HPD violation · open
249 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding07/17/2025
DOB NOWSuspended ScaffoldSigned-offLawrence Exterior01/14/2025
DOB NOWSuspended ScaffoldSigned-offLawrence Exterior12/03/2024
DOB NOWPlumbingPermit IssuedService Tech Mechanical & Plumbing08/13/2024
DOB NOWBoiler EquipmentPermit IssuedService Tech Mechanical & Plumbing08/13/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding07/29/2024
DOB NOWGeneral ConstructionSigned-offLawrence Exterior07/15/2024
DOB NOWSuspended ScaffoldSigned-offLawrence Exterior04/30/2024
DOB NOWPlumbingSigned-offService Tech Mechanical & Plumbing08/21/2023
BISOTISSUEDBellet Construction09/05/2018
BISEQISSUEDJ & G Construction Services07/24/2018
BISEQISSUEDJ & G Construction Services07/24/2017
BISEQISSUEDJ & G GNRL03/01/2016
BISEQISSUEDJ & G GNRL10/07/2014
BISEQISSUEDJ & G GNRL05/18/2012
BISEQISSUEDJ & G GNRL10/12/2011
BISOTISSUEDJ & G General Construction12/08/2006
BISEQISSUEDJ & G General Cot12/08/2006
BISOTISSUEDKTS Development01/13/2006
BISOTRE-ISSUEDJ & G General Construction11/25/2005
BISOTISSUEDJ & G General Construction09/01/2005
BISEQISSUEDJ & G General Cot02/10/2005
BISEQISSUEDJ & G GNRL Contrng09/28/2004
BISFBISSUEDG Bauer08/25/2004
BISPLISSUEDAlan E. Rosenberg08/25/2004
BISOTISSUEDJ & G Contracting07/02/2004
BISEQISSUEDJ & G General01/06/2003
BISEQISSUEDSpring Scaffolding04/03/2001
BISEQISSUEDSpring Scaffolding11/03/2000
BISEQISSUEDSpring Scaffolding04/13/2000
2 projects · most recent 07/24/2024
FiledStatusContractorScope
07/24/2024CompleteBorowide Elect'l Contractors—
04/29/2018CompleteJam Electrical—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/26/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
07/22/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/22/2024Maintenance informationLOUIS ARENAenergy_progress
07/22/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
07/22/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/22/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/22/2024Heating SystemsLOUIS ARENAspecial
07/22/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/05/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/05/2024Post-installed AnchorsLeo Leespecial
08/07/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
08/07/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
118 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account