← Back
BROOKLYN
1720 LINCOLN PLACE
BROOKLYN · BIN 3429690
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof43p · 2 filings · 20 docs
Penthouse48p · 3 filings · 20 docs
Floor 449p · 3 filings · 20 docs
Floor 346p · 2 filings · 20 docs
Floor 248p · 3 filings · 20 docs
Floor 149p · 3 filings · 20 docs
Cellar49p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO CONTRACTING NY503/22/2026
BLUE ELM BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KAO HWA LEE ARCHITECTS PC1309/17/2024
ENTHINK ENGINEERS LLC104/04/2023
YORK TOWER CONSULTING ENGINEERING307/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE ELM INCGeneral Contractor2107/08/2026
METRO CONTRACTING NY, INC.General Contractor203/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161409/17/2024
Building Lifecycle
All (132)Filed (17)Permit Issued (14)Signed Off (8)Violation (10)Inspection (15)Objection (38)Special Inspection (30)
03/29/2026
Violation issued (HPD, closed)
B
11/29/2025
Violation issued (HPD, open)
A
11/29/2025
Violation issued (HPD, closed)
B
11/29/2025
Violation issued (HPD, closed)
C
11/29/2025
Violation issued (HPD, open)
C
11/29/2025
Violation issued (HPD, closed)
C
11/29/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
C
10/08/2025
Violation issued (HPD, closed)
C
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/25/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
09/25/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/25/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
09/25/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/25/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
09/25/2024
Special inspection requirement — Metering
FAHAD FATEH
09/25/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
09/25/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/25/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
09/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/25/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
09/25/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/25/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/25/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
09/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/17/2024
Filed — New Building
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB #B00674201-I1
B00674201-P8
09/16/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
09/16/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/16/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/16/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/16/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/16/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
09/16/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/16/2024
Special inspection requirement — Metering
FAHAD FATEH
09/16/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
09/16/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/19/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00852713-I1
04/18/2024
Violation issued (HPD, closed)
A
04/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/07/2024
Signed off — New Building
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB #B00674201-I1
B00674201-S1
02/14/2024
Filed — New Building
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB #B00674201-I1
B00674201-P7
01/23/2024
Signed off — Alteration
PLUMBING AND SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB JOB#B00674201-I1
B00734129-I1
01/05/2024
Signed off — Alteration
PROPOSING NEW CURB CUTS AS PER PLANS
B08045256-I1
01/05/2024
Signed off — Alteration
PROPOSING NEW CURB CUTS AS PER PLANS
B00742425-I1
12/28/2023
Objection resolved — Addressed
12/26/2023
Filed — New Building
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB #B00674201-I1
B00674201-P4
12/21/2023
Objection raised — Other
12/07/2023
Filed — Alteration
PLUMBING AND SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB JOB#B00674201-I1
B00734129-P2
12/04/2023
Filed — New Building
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB #B00674201-I1
B00674201-P6
11/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2023
Filed — New Building
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB #B00674201-I1
B00674201-P2
11/13/2023
Signed off — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB JOB#B00674201-I1
B00734146-I1
11/08/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/02/2023
Signed off — Alteration
FOUNDATION & EARTHWORK SPECIFICATIONS FILE DIN CONJUNCTION IWTH NB APPLICATION #B00674201-I1
B00699319-I1
11/02/2023
Signed off — Alteration
INSTALLATION OF INITIAL FOOTING FOUNDATION IN CONJUNCTION WITH GC/NB APPLICATION #B00674201-I1
B00733161-I1
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBLUE ELM INC09/22/2023
DOB NOWCurb CutSigned-offBLUE ELM INC09/22/2023
DOB NOWMechanical SystemsSigned-offBLUE ELM INC09/22/2023
DOB NOWGeneral ConstructionPermit IssuedBLUE ELM INC07/06/2023
DOB NOWGeneral ConstructionPermit IssuedBLUE ELM INC04/04/2023
DOB NOWSupported ScaffoldSigned-offMETRO CONTRACTING NY, INC.04/04/2023
DOB NOWEarth WorkSigned-offBLUE ELM INC04/04/2023
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN02/21/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/21/2023
DOB NOWGeneral ConstructionPermit IssuedBLUE ELM INC12/06/2022
DOB NOWStructuralSigned-offBLUE ELM INC12/02/2022
DOB NOWGeneral ConstructionPermit IssuedBLUE ELM INC10/21/2022
DOB NOWEarth WorkSigned-offBLUE ELM INC06/03/2022
DOB NOWFoundationSigned-offBLUE ELM INC05/19/2022
1 project · most recent 09/17/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2024Signed-offBLUE ELM INCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-4C36NA3 35,400 BTU · Heat Pump Outdoor ×20
MXZ-5C42NA3 45,000 BTU · Heat Pump Outdoor ×16
MXZ-3C30NA3 28,600 BTU · Heat Pump Outdoor ×12
MUZ-GS12NA 14,400 BTU · Heat Pump Outdoor ×4
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×72
QTXEN150 100 CFM · Kitchen Exhaust ×44
Ducts & Piping
N/A N/A 5 kW · Electric Heater ×4
2 projects · most recent 01/10/2023
General Wiring Lighting
FiledStatusContractorScope
01/10/2023CompleteRICHARD NEU—
01/09/2023CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
09/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/08/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/30/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/24/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/21/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/04/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
06/09/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 141
DateRequirementInspectorRole
09/25/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/25/2024Post-installed AnchorsFAHAD FATEHspecial
09/25/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
09/25/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/25/2024Fenestration air leakageFAHAD FATEHenergy_progress
09/25/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
09/25/2024MeteringFAHAD FATEHenergy_progress
09/25/2024Maintenance informationFAHAD FATEHenergy_progress
09/25/2024Fenestration areasFAHAD FATEHenergy_progress
09/25/2024Exterior lighting powerFAHAD FATEHenergy_progress
09/25/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
09/25/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
09/25/2024Interior lighting powerFAHAD FATEHenergy_progress
09/25/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
09/25/2024Lighting controlsFAHAD FATEHenergy_progress
09/25/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/25/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
09/16/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
09/16/2024Post-installed AnchorsFAHAD FATEHspecial
09/16/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
09/16/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/16/2024MeteringFAHAD FATEHenergy_progress
09/16/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
09/16/2024Fenestration air leakageFAHAD FATEHenergy_progress
09/16/2024Exterior lighting powerFAHAD FATEHenergy_progress
Latest 25 of 141.
▾Documents — 168 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/29/2026B00674201-P6Request digital key ↗
08/29/2026B00674201-I1Request digital key ↗
08/29/2026B00674201-P2Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
05/11/2022340840674Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/29/2026B00674201-I1Open ↗
08/13/2026B00674201-P8Open ↗
08/13/2026B00674201-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/29/2026B00674201-I1Open ↗
08/13/2026B00674201-P8Open ↗
08/13/2026B00674201-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00674201-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature23
09/01/2026B00674201-P2Open ↗
09/01/2026B00674201-P2Open ↗
09/01/2026B00699319-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026B00674201-P2Open ↗
09/01/2026B00699319-I1Open ↗
09/01/2026B00674201-P4Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/30/2026B00699319-I1Open ↗
08/29/2026B00674201-I1Open ↗
08/29/2026B00674201-P4Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/11/2022340840674Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/29/2026B00674201-I1Open ↗
08/13/2026B00674201-P1Open ↗
08/13/2026B00674201-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFDNY: Letter of No Objection3
08/28/2026B00734129-P1Open ↗
08/14/2026B00734129-I1Open ↗
08/13/2026B00734129-P2Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/29/2026B00674201-I1Open ↗
08/29/2026B00674201-P4Open ↗
08/29/2026B00674201-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN1
12/06/2022340840674Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/06/2022340840674Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/11/2022340840674Open ↗
▸BISSTREET TREE CHECKLIST1
05/11/2022340840674Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00674201-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00674201-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00674201-I1Open ↗
▸Environmental & Asbestos34
▸DOB NOWOER: Notice to Proceed20
08/29/2026B00674201-I1Open ↗
08/15/2026B00699319-I1Open ↗
08/15/2026B00699319-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
08/15/2026B00699319-I1Open ↗
08/15/2026B00699319-I1Open ↗
08/13/2026B00733161-I1Open ↗
Showing 3 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
09/26/2024340840674Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00674201-I1Open ↗
08/13/2026B00734129-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00674201-S1Open ↗
▸Inspections & Test Reports2
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
10/04/2024340840674Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
02/13/2024340840674Open ↗
▸Approvals, Objections & Sign-offs5
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff4
09/20/2024340840674Open ↗
09/20/2024340840674Open ↗
09/20/2024340840674Open ↗
Showing 3 of 4 on file for this type
▸BISCURB CUT (CC) SIGNOFF1
04/17/2024340840674Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
05/11/2022340840674Open ↗
▸BISADDITIONAL INFORMATION1
12/06/2022340840674Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/11/2022340840674Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial4
08/29/2026B00674201-I1Open ↗
08/13/2026B00674201-P1Open ↗
08/13/2026B00674201-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/29/2026B00674201-I1Open ↗
08/13/2026B00674201-P8Open ↗
08/13/2026B00674201-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/29/2026B00674201-I1Open ↗
08/29/2026B00674201-P4Open ↗
08/29/2026B00674201-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/15/2026B00699319-I1Open ↗
08/13/2026B00733161-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/06/2022340840674Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00674201-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00674201-I1Open ↗