RoofUnder Construction71p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 11 drawing sheets
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 8Under Construction69p · 2 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 9 drawing sheets
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 7Under Construction67p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 8 drawing sheets
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 6Under Construction125p · 1 filing · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 10 drawing sheets
Floor 5Under Construction121p · 1 filing · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 6 drawing sheets
Floor 4Under Construction118p · 1 filing · 20 docs
ArchitectureElectricalMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 3 drawing sheets
Floor 3Under Construction124p · 1 filing · 20 docs
ArchitectureDMGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 9 drawing sheets
Floor 2Under Construction128p · 2 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 10 drawing sheets
INTERIOR RENOVATION OF EXISTING 2 STORY COMMERCIAL BUILDING. NO CHANGE IN BULK. NO CHANGE IN USE OF EGRESS OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Floor 1Under Construction133p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Structural
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 12 drawing sheets
INTERIOR RENOVATION OF EXISTING 2 STORY COMMERCIAL BUILDING. NO CHANGE IN BULK. NO CHANGE IN USE OF EGRESS OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
CellarUnder Construction138p · 1 filing · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralZ
Issued Permit Scope
Earth Work · Foundation · General Construction · Mechanical Systems · Structural · Support of Excavation
THE SCOPE OF WORK IS THE PROPOSED 4 STORY AND CELLAR RESIDENTIALUSE BUILDING W/ TOTAL OF X RESIDENTIAL UNITS AND EACH IS PROVIDEDWITH DEDICATED AC SPLIT SYSTEM AND EXHAUST SYSTEM TO SUPPORTTHIS CONSTRUCTION.
On file for this project
121 documents · 15 drawing sheets