← Back
Multi-story retail building (2+)
1723 BOSTON ROAD
BRONX · BIN 2009881
💬 Discuss this project
1936Year Built
2Stories
K2Building Class
R7-1Zoning
20,600 sfGross Floor Area
9Units
13 Open Violations ▸
Multi-story retail building (2+) · Owner of record: JEHOVA SHALOM, INC. · 14,598 sf lot · 1.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction71p · 2 filings · 20 docs
Floor 8Under Construction69p · 2 filings · 20 docs
Floor 7Under Construction67p · 2 filings · 20 docs
Floor 6Under Construction125p · 1 filing · 20 docs
Floor 5Under Construction121p · 1 filing · 20 docs
Floor 4Under Construction118p · 1 filing · 20 docs
Floor 3Under Construction124p · 1 filing · 20 docs
Floor 2Under Construction128p · 2 filings · 20 docs
Floor 1Under Construction133p · 4 filings · 20 docs
CellarUnder Construction138p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP6509/15/2026
TCHORS803/22/2026
JEHOVA SHALOM, INC.203/22/2026
AL CAPITAL CORP.103/22/2026
AL CAPITAL GRP103/22/2026
RIVERDALE EQUITTIE103/22/2026
ARSH GENERAL CONSTRUCTION CORP703/21/2026
JEHOVAH SHALOM CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDINGS REPRISENTATIVE LLC3203/21/2026
EXPRESS FILING INC203/21/2026
AE DESIGN SOLUTION2003/21/2026
ZV Drafting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TCHORS LLCGeneral Contractor2509/15/2026
PRIME PIPING & HEATING INPlumbing906/28/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor707/08/2026
N TECH DESIGN OF AMERICAGeneral Contractor207/08/2026
PRIME PIPING & HEATING INFire Protection206/28/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
TORRES IVANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941605/29/2026
Building Lifecycle
All (237)Filed (29)Permit Issued (35)Signed Off (11)Violation (60)Inspection (19)Objection (50)Special Inspection (30)Tax Incentive (3)
09/14/2026
Permit issued — Curb Cut
X01112246-S6-CC
08/27/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND HORIZONTAL EXTENSION, ADDING 6 STORY TOAN EXISTING 2 STORY AND CELLAR COMMUNITY FACILITY BUILDING
X01112246-S4
08/27/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND HORIZONTAL EXTENSION, ADDING 6 STORY TOAN EXISTING 2 STORY AND CELLAR COMMUNITY FACILITY BUILDING
X01112246-S8
08/11/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/31/2026
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
07/29/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/24/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
07/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/22/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
07/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/22/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
07/20/2026
Special inspection requirement — Standpipe Systems
Paul Raymond
07/20/2026
Special inspection requirement — Sprinkler Systems
Paul Raymond
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
07/20/2026
Special inspection requirement — Maintenance information
Paul Raymond
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
06/24/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND HORIZONTAL EXTENSION, ADDING 6 STORY TOAN EXISTING 2 STORY AND CELLAR COMMUNITY FACILITY BUILDING
X01112246-S5
06/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/01/2026
Signed off — Alteration
X00900654-I1
06/01/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND HORIZONTAL EXTENSION, ADDING 6 STORY TOAN EXISTING 2 STORY AND CELLAR COMMUNITY FACILITY BUILDING
X01112246-S1
05/29/2026
Signed off — Alteration
X01236466-I1
05/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND HORIZONTAL EXTENSION, ADDING 6 STORY TOAN EXISTING 2 STORY AND CELLAR COMMUNITY FACILITY BUILDING
X01112246-A1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01240279-I1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.n
X01276798-I1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01283445-I1
05/28/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED VERTICAL AND HORIZONTAL EXTENSION, ADDING 6 STORY TOAN EXISTING 2 STORY AND CELLAR COMMUNITY FACILITY BUILDING
X01112246-S7
05/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
05/19/2026
Special inspection requirement — Maintenance information
Paul Raymond
05/19/2026
Special inspection requirement — Standpipe Systems
Paul Raymond
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
05/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
05/19/2026
Special inspection requirement — Sprinkler Systems
Paul Raymond
05/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01252363-I1
04/29/2026
Permit issued — Sprinklers
X56995907-S4-PL
04/22/2026
Objection resolved — Open
04/20/2026
Objection resolved — Resolved
03/26/2026
Objection raised — Admin
03/12/2026
Filed — No Work
X01370523-I1
03/12/2026
Violation issued (ECB, closed)
Construction
02/19/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.n
X01276798-P1
02/18/2026
Permit issued — General Construction
X00900654-I1-GC
02/13/2026
Permit issued — General Construction
X01112246-I1-GC
02/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01283445-P1
02/11/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/10/2026
Permit issued — Construction Fence
X01112246-S7-FN
02/03/2026
Permit issued — Structural
X01112246-S3-ST
02/02/2026
Permit issued — General Construction
X01112246-I1-GC
02/01/2026
Violation issued (ECB, closed)
Construction
02/01/2026
Violation issued (ECB, closed)
Construction
02/01/2026
Violation issued (ECB, closed)
Construction
01/30/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/30/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
01/23/2026
Permit issued — General Construction
X01112246-I1-GC
01/14/2026
Permit issued — General Construction
X01112246-I1-GC
Latest 60 of 237 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTCHORS LLC09/14/2026
DOB NOWSprinklersSigned-offMES CONSTRUCTION CORP04/29/2026
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC02/13/2026
DOB NOWConstruction FenceSigned-offTCHORS LLC02/10/2026
DOB NOWStructuralPermit IssuedTCHORS LLC02/03/2026
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC02/02/2026
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC01/23/2026
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC01/14/2026
DOB NOWStructuralPermit IssuedTCHORS LLC12/30/2025
DOB NOWEarth WorkPermit IssuedTCHORS LLC12/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/09/2025
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC12/09/2025
DOB NOWStructuralPermit IssuedTCHORS LLC11/13/2025
DOB NOWFoundationPermit IssuedTCHORS LLC11/13/2025
DOB NOWPlumbingSigned-offA M B MECHANICAL INC11/13/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC11/12/2025
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN11/10/2025
DOB NOWEarth WorkPermit IssuedTCHORS LLC10/23/2025
DOB NOWStructuralPermit IssuedTCHORS LLC10/21/2025
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC10/21/2025
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC09/11/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC08/28/2025
DOB NOWFoundationPermit IssuedN TECH DESIGN OF AMERICA07/17/2025
DOB NOWStructuralPermit IssuedN TECH DESIGN OF AMERICA07/17/2025
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC07/17/2025
DOB NOWSupport of ExcavationSigned-offTCHORS LLC07/16/2025
DOB NOWSupport of ExcavationSigned-offTCHORS LLC07/16/2025
DOB NOWSupport of ExcavationPermit IssuedTCHORS LLC07/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/09/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/23/2025
DOB NOWStandpipeSigned-offPRIME PIPING & HEATING IN06/11/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/06/2025
DOB NOWMechanical SystemsPermit IssuedTCHORS LLC05/29/2025
DOB NOWConstruction FenceSigned-offTCHORS LLC04/02/2025
BISOTISSUEDARSH GEN CONSTRUCTION COR03/07/2016
BISEQISSUEDARSH GEN CONSTRUCTION COR02/01/2016
BISOTISSUEDMARIA CACHE I04/18/2000
BIS—ISSUEDJEHOVAH SHALOM CHURCH12/22/1999
BISPLISSUEDIHOPE PLUMBING & HEATING CO., IN05/18/1990
1 project · most recent 05/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/29/2026Signed-offTCHORS LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×144
RXTA24AAVJU 25,800 BTU · Vrf Outdoor ×30
RZQ18TBVJU 20,000 BTU · Split System ×30
Ventilation
Greenheck ECV-20-F-H 711 BTU · Exhaust Fan ×2
1 project · most recent 05/29/2026
Sprinkler System
FiledStatusContractorScope
05/29/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 05/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/29/2026Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
5 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
12/24/2025CompletePOWER DIRECT ELECTRIC INC—
07/09/2025CompleteSOLAS ELECTRICAL CORP—
06/25/2025CompleteSOLAS ELECTRICAL CORP—
05/28/2025CompleteHIVOLTS ELECTRICAL INC—
1 project · most recent 05/29/2026
Concrete
FiledStatusContractorScope
05/29/2026Signed-offTCHORS LLCConcrete
2 projects · most recent 05/29/2026
Fence Scaffold
FiledStatusContractorScope
05/29/2026Signed-offTCHORS LLCFence
02/19/2026Signed-offCORE SCAFFOLD SYSTEMS INCScaffold
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
08/11/2026Pass-Final PL - UndergroundPassView ↗
07/31/2026Pass-Final SD - Up to 9 Requested FloorsPassView ↗
07/29/2026Pass-Final PL - UndergroundPassView ↗
07/24/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
07/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/22/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/11/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/30/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/28/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
07/20/2026Sprinkler SystemsPaul Raymondspecial
07/20/2026HVAC-R and service water heating system controlsPaul Raymondenergy_progress
07/20/2026HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
07/20/2026Maintenance informationPaul Raymondenergy_progress
07/20/2026HVAC-R and service water heating equipmentPaul Raymondenergy_progress
07/20/2026Standpipe SystemsPaul Raymondspecial
05/19/2026Sprinkler SystemsPaul Raymondspecial
05/19/2026HVAC-R and service water heating equipmentPaul Raymondenergy_progress
05/19/2026Maintenance informationPaul Raymondenergy_progress
05/19/2026HVAC-R and service water heating system controlsPaul Raymondenergy_progress
05/19/2026HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
05/19/2026Standpipe SystemsPaul Raymondspecial
11/14/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
11/14/2025HVAC-R and service water heating system controlsPaul Raymondenergy_progress
11/14/2025HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
11/14/2025Shutoff dampersPaul Raymondenergy_progress
11/14/2025Duct leakage testing, insulation and designPaul Raymondenergy_progress
11/14/2025HVAC-R and service water heating equipmentPaul Raymondenergy_progress
11/14/2025FinalPaul Raymondprogress
11/14/2025Energy Code Compliance InspectionsPaul Raymondprogress
11/14/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/14/2025Mechanical SystemsPaul Raymondspecial
11/14/2025Post-installed AnchorsPaul Raymondspecial
11/13/2025Sprinkler SystemsPaul Raymondspecial
11/13/2025Standpipe SystemsPaul Raymondspecial
Latest 25 of 89.
▾Documents — 190 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch28
08/23/2026X00900654-I1Request digital key ↗
08/19/2026X01240279-I1Request digital key ↗
08/19/2026X01252363-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/17/2026X01370523-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION5
08/08/2016220325672Open ↗
02/11/2016240131969Open ↗
01/28/2016240130764Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY4
12/12/2016220551098Open ↗
12/06/2016220551098Open ↗
11/15/2016220551098Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
02/11/2016240131969Open ↗
01/28/2016240130764Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/16/2026X01112246-I1Open ↗
08/16/2026X01112246-P6Open ↗
08/13/2026X01112246-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026X01112246-P4Open ↗
08/13/2026X01112246-I1Open ↗
08/13/2026X01112246-P6Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X01112246-P4Open ↗
08/13/2026X01112246-P6Open ↗
08/13/2026X01112246-I1Open ↗
▸Seals & Professional Certifications74
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/23/2026X00900654-I1Open ↗
08/19/2026X01252363-I1Open ↗
08/17/2026X01236466-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026X01112246-S8Open ↗
09/02/2026X01112246-S5Open ↗
09/02/2026X01112246-S5Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026X01112246-S5Open ↗
09/02/2026X01112246-S2Open ↗
09/02/2026X01112246-S5Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/14/2016220551098Open ↗
12/04/2008210081748Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/11/2016240131969Open ↗
01/28/2016240130764Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/11/2016240131969Open ↗
01/28/2016240130764Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/11/2016240131969Open ↗
01/28/2016240130764Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/17/2025240361229Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/04/2008210081748Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/04/2008210081748Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X01112246-P6Open ↗
08/13/2026X01112246-I1Open ↗
08/13/2026X01112246-P4Open ↗
▸BISSCHEDULE B - PLUMBING1
07/26/2013220325672Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
07/26/2013220325672Open ↗
12/04/2008210081748Open ↗
▸DOB NOWStreet Tree Sign Off1
08/18/2026X01112246-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01112246-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/18/2026X01112246-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/16/2026X01112246-S3Open ↗
08/16/2026X01112246-A1Open ↗
08/16/2026X01112246-P8Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/04/2008210081748Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/11/2016240131969Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026X00900654-I1Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification2
08/16/2026X01112246-S5Open ↗
08/16/2026X01112246-S4Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/26/2013220325672Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/11/2016240131969Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/17/2025240361229Open ↗
02/11/2016240131969Open ↗
01/28/2016240130764Open ↗
▸DOB NOWSOIL REPORT3
08/13/2026X01112246-P6Open ↗
08/13/2026X01112246-P4Open ↗
08/13/2026X01112246-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01112246-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026X01112246-S1Open ↗
08/13/2026X01112246-S6Open ↗
08/13/2026X01112246-P5Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
07/26/2013220325672Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/04/2008210081748Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
02/11/2016240131969Open ↗
07/26/2013220325672Open ↗
12/04/2008210081748Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
04/18/2016240131969Open ↗
04/14/2016240130764Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET3
01/17/2025240361229Open ↗
02/11/2016240131969Open ↗
01/28/2016240130764Open ↗
▸BISEFILING COVER SHEET1
07/26/2013220325672Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/13/2026X01112246-P4Open ↗
08/13/2026X01112246-I1Open ↗
08/13/2026X01112246-P6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X01112246-P6Open ↗
08/13/2026X01112246-P4Open ↗
08/13/2026X01112246-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/16/2026X01112246-I1Open ↗
08/16/2026X01112246-P6Open ↗
08/16/2026X01112246-P4Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X01112246-S2Open ↗
08/13/2026X01112246-S1Open ↗
▸DOB NOWAlternate Plan 11
08/17/2026X01370523-I1Open ↗