1925Year Built
2Stories
B2Building Class
R4AZoning
1,460 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/27/2021$720K—— → —$493/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHANDA ENGINEERING CONSULTANT PC208/11/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PADMA CONTRACTING CORPGeneral Contractor107/08/2026
JOHNNY'S P&H CONTRAC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842208/11/2023
Building Lifecycle
All (26)Filed (2)Permit Issued (2)Signed Off (2)Inspection (8)Objection (8)Special Inspection (4)
02/22/2024
Signed off — Alteration
APPLICATION IS BEING FILED FOR CELLAR FLOOR CORRECTIONAL WORK AS PER RCA # 2329951. REMOVE MINOR NON-LOAD BEARING PARTITION WALLS & INSTALL NEW MASONRY STAIR CELLAR FLOOR REAR SIDE EXIT. INSTALL NEW 3-FIXTURE BATHROOM IN CELLAR. CFRN# 2023000144508.
X00895721-I1
02/22/2024
Signed off — Alteration
APPLICATION IS BEING FILED FOR CELLAR FLOOR CORRECTIONAL WORK AS PER RCA # 2329951. REMOVE MINOR NON-LOAD BEARING PARTITION WALLS & INSTALL NEW MASONRY STAIR CELLAR FLOOR REAR SIDE EXIT. INSTALL NEW 3-FIXTURE BATHROOM IN CELLAR. CFRN# 2023000144508.
X00895721-S1
01/29/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/12/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/28/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/16/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/31/2023
Permit issued — Plumbing
X00895721-S1-PL
08/11/2023
Filed — Alteration
APPLICATION IS BEING FILED FOR CELLAR FLOOR CORRECTIONAL WORK AS PER RCA # 2329951. REMOVE MINOR NON-LOAD BEARING PARTITION WALLS & INSTALL NEW MASONRY STAIR CELLAR FLOOR REAR SIDE EXIT. INSTALL NEW 3-FIXTURE BATHROOM IN CELLAR. CFRN# 2023000144508.
X00895721-S1
08/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
08/04/2023
Permit issued — General Construction
X00895721-I1-GC
07/18/2023
Objection raised — Admin
07/18/2023
Objection resolved — Addressed
07/16/2023
Objection resolved — Addressed
07/16/2023
Objection resolved — Addressed
07/16/2023
Objection resolved — Addressed
07/03/2023
Objection raised — Admin
07/03/2023
Objection raised — Admin
07/03/2023
Objection raised — Cost
06/27/2023
Filed — Alteration
APPLICATION IS BEING FILED FOR CELLAR FLOOR CORRECTIONAL WORK AS PER RCA # 2329951. REMOVE MINOR NON-LOAD BEARING PARTITION WALLS & INSTALL NEW MASONRY STAIR CELLAR FLOOR REAR SIDE EXIT. INSTALL NEW 3-FIXTURE BATHROOM IN CELLAR. CFRN# 2023000144508.
X00895721-I1
06/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
06/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
06/26/2023
Special inspection requirement — Final
KARTIK CHANDA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHNNY NANHU10/31/2023
DOB NOWGeneral ConstructionSigned-offPADMA CONTRACTING CORP08/04/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/29/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/12/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/28/2023Fail-Final General Construction Non-Directive 14FailView ↗
11/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/11/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
06/26/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
06/26/2023Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
06/26/2023FinalKARTIK CHANDAprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026X00895721-S1Request digital key ↗
08/22/2026X00895721-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026X00895721-S1Open ↗
08/13/2026X00895721-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026X00895721-S1Open ↗
08/22/2026X00895721-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026X00895721-I1Open ↗
08/23/2026X00895721-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X00895721-S1Open ↗
08/23/2026X00895721-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026X00895721-S1Open ↗
08/22/2026X00895721-I1Open ↗