← Back
BuildNYC
Two stories - detached, small or mid-size
1723 KIMBALL STREET
BROOKLYN · BIN 3220660
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-2Zoning
1,312 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.44 FAR built · Flood zone X500
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew extension at 1st floor1 filing · 10 docs
AtticNew extension at 1st floor1 filing · 10 docs
Floor 2New extension at 1st floor1 filing · 10 docs
Floor 1New extension at 1st floor1 filing · 10 docs
CellarNew extension at 1st floor1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/28/2025$999K—Private party → Private party$761/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture311/05/2026
Building Lifecycle
11/05/2026
Filed — Alteration
HEREWITH FILING APPLICATION FOR A PROPOSED EXTENSION ON THE FIRST AND SECOND FLOOR, ALONG WITH INTERIOR RENOVATIONS ON THE FIRST FLOOR AND ATTIC OF A TWO-STORY SINGLE-FAMILY HOME. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01383889-S2
11/05/2026
Special inspection requirement — Post-installed Anchors
11/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
11/05/2026
Special inspection requirement — Concrete - Cast-In-Place
10/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
34 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 11/05/2026
Steel Concrete Wood
FiledStatusContractorScope
11/05/2026——Steel, Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/05/2026Post-installed Anchors—special
11/05/2026Subsurface Conditions – Fill Placement & In-Place Density—special
11/05/2026Concrete - Cast-In-Place—special
10/30/2026Fire-Resistant Penetrations and Joints—special
10/30/2026Structural Stability – Alterations of existing buildings—special
10/30/2026Preliminary—progress
10/27/2026Final—progress
10/27/2026Footing and Foundation—progress
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account