← Back
Over six families without stores
17-25 HIMROD STREET
QUEENS · Ridgewood · BIN 4081864
💬 Discuss this project
1930Year Built
3Stories
C1Building Class
R6BZoning
4,875 sfGross Floor Area
7Units
Rent Stabilized2 Open Violations ▸
Over six families without stores · Owner of record: 1725 HIMROD LLC · 2,500 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Roof20p · 4 filings · 20 docs
Floor 319p · 1 filing · 17 docs
Floor 222p · 3 filings · 20 docs
Floor 117p · 1 filing · 17 docs
Cellar20p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAFNA DEVELOPMENT3207/08/2026
1725 HIMROD LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2021$1.6M—— → —$328/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OMF ARCHITECT PC1609/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TREASURE BOX SERVICES3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJS MANAGEMENT INCGeneral Contractor1207/08/2026
ALL PRO PLBG & HTG INCPlumbing507/08/2026
VEZANDIO CONTRACTING CORPGeneral Contractor407/08/2026
ALL PRO PLBG & HTG INCFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OMF ARCHITECTS PC5900509/08/2023
PROMISE CONSULTANTS1412109/08/2023
CENTURY TESTING & CONSULT4081201/02/2023
AA BUILDING & INSPECTION1519109/20/2021
Building Lifecycle
All (107)Filed (16)Permit Issued (15)Signed Off (7)Violation (26)Inspection (10)Objection (8)Special Inspection (25)
05/11/2025
Violation issued (HPD, closed)
C
05/01/2025
Violation issued (HPD, closed)
B
05/01/2025
Violation issued (HPD, open)
B
05/01/2025
Violation issued (HPD, closed)
C
08/05/2024
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
11/02/2023
Signed off — Alteration
PROPOSED SPRINKLER WORK ON CONNECTION WITH CO JOB# Q00578283.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00649747-I1
11/01/2023
Signed off — Alteration
Boiler work in connection with interior renovation as per previous record for boiler work Q00578315-S1, to add the other 6 boiler under separate records.
Q00578315-I1
10/31/2023
Signed off — Alteration
Boiler work in connection with interior renovation as per previous record for boiler work Q00578315-S1, to add the other 6 boiler under separate records.
Q00578315-S3
10/30/2023
Signed off — Alteration
Boiler work in connection with interior renovation as per previous record for boiler work Q00578315-S1, to add the other 6 boiler under separate records.
Q00578315-S1
10/27/2023
Signed off — Alteration
EXISTING 6 FAMILY BUILDING TO BE RENOVATED: INTERIOR RENOVATION ON ALL FLOORS. REMOVE INTERIOR PARTITIONS ON ALL FLOORS AS INDICATED, REMOVE AL FIXTURES ON EXISTING BATHROOMS, REMOVE KITCHENETTE ON ALL FLOORS. PLUMBING WORK WILL BE FILED SEPARATELY.
Q00551315-I1
10/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
OSCAR FUERTES
09/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
OSCAR FUERTES
09/26/2023
Special inspection requirement — Maintenance information
OSCAR FUERTES
09/22/2023
Filed — Alteration
Boiler work in connection with interior renovation as per previous record for boiler work Q00578315-S1, to add the other 6 boiler under separate records.
Q00578315-P6
09/22/2023
Filed — Alteration
Boiler work in connection with interior renovation as per previous record for boiler work Q00578315-S1, to add the other 6 boiler under separate records.
Q00578315-P5
09/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
OSCAR FUERTES
09/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
OSCAR FUERTES
09/20/2023
Special inspection requirement — Maintenance information
09/18/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
OSCAR FUERTES
09/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
OSCAR FUERTES
09/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
OSCAR FUERTES
09/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
OSCAR FUERTES
09/15/2023
Objection resolved — Addressed
09/14/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/13/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/13/2023
Objection raised — Scope
09/08/2023
Filed — Alteration CO
PROPOSED CONVERSION OF EXISTING SIX-FAMILY BUILDING TO SEVEN FAMILIES AS PER SUBMITTED PLANS.
Q00578283-P1
09/05/2023
Permit issued — Sprinklers
Q00649747-I1-EW-SP
08/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2023
Permit issued — Boiler Equipment
Q00578315-S3-BE
08/12/2023
Filed — Alteration
Boiler work in connection with interior renovation as per previous record for boiler work Q00578315-S1, to add the other 6 boiler under separate records.
Q00578315-S3
08/01/2023
Permit issued — Boiler Equipment
Q00578315-S1-BE
08/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/31/2023
Signed off — Alteration
Proposed mechanical split units in conjunction with alteration One as per plans. No change of use, egress or occupancy under this application.
Q00745570-I1
07/28/2023
Special inspection requirement — Heating Systems
OSCAR FUERTES
07/28/2023
Special inspection requirement — Mechanical Systems
OSCAR FUERTES
07/28/2023
Special inspection requirement — Final
OSCAR FUERTES
07/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
OSCAR FUERTES
07/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
OSCAR FUERTES
07/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
OSCAR FUERTES
07/15/2023
Filed — Alteration
Proposed mechanical split units in conjunction with alteration One as per plans. No change of use, egress or occupancy under this application.
Q00745570-P1
07/12/2023
Filed — Alteration
Boiler work in connection with interior renovation as per previous record for boiler work Q00578315-S1, to add the other 6 boiler under separate records.
Q00578315-P2
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2023
Special inspection requirement — Final
OSCAR FUERTES
06/21/2023
Special inspection requirement — Heating Systems
OSCAR FUERTES
06/21/2023
Special inspection requirement — Mechanical Systems
OSCAR FUERTES
06/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
OSCAR FUERTES
06/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
OSCAR FUERTES
06/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
OSCAR FUERTES
06/12/2023
Filed — Alteration
Boiler work in connection with interior renovation as per previous record for boiler work Q00578315-S1, to add the other 6 boiler under separate records.
Q00578315-P1
05/05/2023
Permit issued — Mechanical Systems
Q00745570-I1-MS
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2023
Permit issued — General Construction
Q00578283-I1-ST
01/27/2023
Permit issued — General Construction
Q00578283-I1-GC
01/03/2023
Special inspection requirement — Sprinkler Systems
ALDO BRAVO
01/02/2023
Filed — Alteration
PROPOSED SPRINKLER WORK ON CONNECTION WITH CO JOB# Q00578283.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00649747-P2
11/09/2022
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE IN CONNECTION WITH Q00578315.
Q00599735-I1
11/09/2022
Special inspection requirement — Sprinkler Systems
ALDO BRAVO
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC09/05/2023
DOB NOWBoiler EquipmentSigned-offALL PRO PLBG & HTG INC08/22/2023
DOB NOWBoiler EquipmentSigned-offALL PRO PLBG & HTG INC08/01/2023
DOB NOWMechanical SystemsSigned-offVEZANDIO CONTRACTING CORP05/05/2023
DOB NOWGeneral ConstructionSigned-offJJS MANAGEMENT INC01/27/2023
DOB NOWGeneral ConstructionPermit IssuedJJS MANAGEMENT INC01/27/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/12/2022
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC08/22/2022
DOB NOWMechanical SystemsSigned-offVEZANDIO CONTRACTING CORP08/01/2022
DOB NOWBoiler EquipmentSigned-offALL PRO PLBG & HTG INC06/30/2022
DOB NOWGeneral ConstructionSigned-offJJS MANAGEMENT INC01/24/2022
DOB NOWStructuralPermit IssuedJJS MANAGEMENT INC01/24/2022
DOB NOWConstruction FenceSigned-offJJS MANAGEMENT INC10/13/2021
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC09/28/2021
DOB NOWGeneral ConstructionSigned-offJJS MANAGEMENT INC07/30/2021
1 project · most recent 08/10/2023
General Wiring
FiledStatusContractorScope
08/10/2023CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 09/08/2023
Steel Masonry
FiledStatusContractorScope
09/08/2023Signed-offJJS MANAGEMENT INCSteel, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/05/2024Pass-Final Construction Permit WithdrawalPassView ↗
10/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
09/26/2023HVAC-R and service water heating system controlsOSCAR FUERTESenergy_progress
09/26/2023HVAC-R and service water heating equipmentOSCAR FUERTESenergy_progress
09/26/2023Maintenance informationOSCAR FUERTESenergy_progress
09/22/2023HVAC-R and service water heating system controlsOSCAR FUERTESenergy_progress
09/22/2023HVAC-R and service water heating equipmentOSCAR FUERTESenergy_progress
09/20/2023Maintenance information—energy_progress
09/18/2023HVAC-R and service water heating equipmentOSCAR FUERTESenergy_progress
09/18/2023HVAC-R and service water heating equipmentOSCAR FUERTESenergy_progress
09/18/2023HVAC-R and service water heating system controlsOSCAR FUERTESenergy_progress
09/18/2023HVAC-R and service water heating system controlsOSCAR FUERTESenergy_progress
07/28/2023Heating SystemsOSCAR FUERTESspecial
07/28/2023Mechanical SystemsOSCAR FUERTESspecial
07/28/2023FinalOSCAR FUERTESprogress
07/28/2023HVAC-R and service water heating system controlsOSCAR FUERTESenergy_progress
07/28/2023HVAC-R and service water heating equipmentOSCAR FUERTESenergy_progress
07/28/2023HVAC-R and service water piping design and insulationOSCAR FUERTESenergy_progress
06/21/2023FinalOSCAR FUERTESprogress
06/21/2023Heating SystemsOSCAR FUERTESspecial
06/21/2023Mechanical SystemsOSCAR FUERTESspecial
06/21/2023HVAC-R and service water piping design and insulationOSCAR FUERTESenergy_progress
06/21/2023HVAC-R and service water heating system controlsOSCAR FUERTESenergy_progress
06/21/2023HVAC-R and service water heating equipmentOSCAR FUERTESenergy_progress
01/03/2023Sprinkler SystemsALDO BRAVOspecial
11/09/2022Sprinkler SystemsALDO BRAVOspecial
07/26/2022Sprinkler Systems—special
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026Q00551315-I1Request digital key ↗
08/27/2026Q00578315-I1Request digital key ↗
08/27/2026Q00578315-S3Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00578283-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026Q00578315-S3Open ↗
09/23/2026Q00578315-S1Open ↗
09/23/2026Q00578315-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026Q00745570-I1Open ↗
08/24/2026Q00578283-P1Open ↗
08/24/2026Q00578283-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026Q00649747-P2Open ↗
08/27/2026Q00745570-I1Open ↗
08/27/2026Q00745570-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00578283-I1Open ↗
08/13/2026Q00578283-P1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/24/2026Q00578283-P1Open ↗
08/24/2026Q00578283-I1Open ↗
08/15/2026Q00745570-I1Open ↗
Showing 3 of 15 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026Q00578283-I1Open ↗
08/13/2026Q00551315-I1Open ↗
08/13/2026Q00578315-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents29
▸DOB NOWDHCR Document27
08/15/2026Q00745570-I1Open ↗
08/15/2026Q00745570-I1Open ↗
08/13/2026Q00578283-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProperty Ownership Certification2
08/24/2026Q00578283-P1Open ↗
08/24/2026Q00578283-I1Open ↗