← Back
BuildNYC
Nursing home
Lower Washington Heights NFCC Clinic
1727 AMSTERDAM AVENUE · BIN 1061339
💬 Discuss this project
1974Year Built
4Stories
I6Building Class
R6AZoning
59,209 sfGross Floor Area
2Units
LL97 Covered8 Active Violations 4 unresolved · 4 paperwork only 6 likely answered ▸
Nursing home · 41,360 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBowery Residents' Committee (BRC)1 filing · 8 docs
Floor 5Bowery Residents' Committee (BRC)1 filing · 20 docs
Floor 4Lower Washington Heights NFCC Clinic3 filings · 5 docs
Floor 3Bowery Residents' Committee (BRC), Lower Washington Heights 4 filings · 13 docs
Floor 2Bowery Residents' Committee (BRC), Lower Washington Heights 4 filings · 13 docs
Floor 1Bowery Residents' Committee (BRC), Lower Washington Heights 5 filings · 16 docs
CellarBowery Residents' Committee (BRC), Lower Washington Heights 3 filings · 16 docs
Sub-BasementLower Washington Heights NFCC Clinic2 filings · 3 docs
Site & exteriorLower Washington Heights NFCC ClinicUnder Construction7p · 1 filing · 4 docs
Filed — no permit issuedLower Washington Heights NFCC Clinic42p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRC2109/13/2026
Harlem Hospital903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Legacy Engineers803/30/2026
Martin H. Kapell301/22/2026
Ashraf208/14/2025
Ancora Engineering508/14/2023
Pillori Associates111/02/2022
Civil Design Works210/17/2022
Rodney D. Gibble Consulting Engineering110/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates1003/21/2026
KM Associates of New York903/21/2026
BK Constructiondba SRT Construction203/21/2026
ECC603/21/2026
Expedite Dem403/21/2026
K & M Associates903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BK Construction ServicesScaffold408/11/2026
High Quality Electric ofElectrical103/21/2026
E.T. Electrical Contracting CoElectrical103/21/2026
Iccari RobertElectrical103/21/2026
R.J. Electric and MaintenanceElectrical103/21/2026
HY-Lee Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ancora Engineering6818106/22/2023
Pillori Associates2317111/02/2022
Building Lifecycle
All (158)Filed (22)Permit Issued (4)Violation (60)Objection (42)Special Inspection (30)
09/19/2026
Objection raised — Other
09/19/2026
Objection raised — Other
08/10/2026
Permit issued — Construction Fence
M01243518-S1-FN
07/30/2026
Permit issued — Sidewalk Shed
M01243518-I1-SH
05/21/2026
Objection resolved — Addressed
05/21/2026
Objection resolved — Addressed
05/12/2026
Objection raised — Other
05/12/2026
Objection raised — Other
04/01/2026
Objection raised — Plumbing
04/01/2026
Objection raised — Plumbing
04/01/2026
Objection raised — Electrical
04/01/2026
Objection raised — Zoning
04/01/2026
Objection raised — Fire_Protection
04/01/2026
Objection raised — Zoning
04/01/2026
Objection raised — Fire_Protection
04/01/2026
Objection raised — Zoning
04/01/2026
Objection raised — Mechanical
04/01/2026
Objection raised — Admin
04/01/2026
Objection raised — Cost
04/01/2026
Objection raised — Mechanical
04/01/2026
Objection raised — Plumbing
04/01/2026
Objection raised — Plumbing
04/01/2026
Objection raised — Mechanical
04/01/2026
Objection raised — Plumbing
04/01/2026
Objection raised — Structural
04/01/2026
Objection raised — Admin
04/01/2026
Objection raised — Fire_Protection
04/01/2026
Objection raised — Fire_Protection
04/01/2026
Objection raised — Plumbing
04/01/2026
Objection raised — Mechanical
04/01/2026
Objection raised — Zoning
04/01/2026
Objection raised — Inspections
04/01/2026
Objection raised — Mechanical
04/01/2026
Objection raised — Electrical
03/30/2026
Filed — Alteration
Related sprinkler work for tenant build out
M01226563-S2
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Cost
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Scope
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Fire_Protection
03/03/2026
Objection raised — Fire_Protection
02/23/2026
Filed — Alteration
Related sprinkler work for tenant build out
M01226563-S3
02/12/2026
Filed — Alteration
Related sprinkler work for tenant build out
M01226563-S1
01/22/2026
Filed — Alteration
Related sprinkler work for tenant build out
M01226563-I1
10/16/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2025
Permit issued — Construction Fence
M01243518-S1-FN
08/14/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS INDICATED ON PLANS, THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01243518-S1
07/31/2025
Permit issued — Sidewalk Shed
M01243518-I1-SH
07/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS INDICATED ON PLANS, THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01243518-I1
07/18/2025
Special inspection requirement — Shutoff dampers
07/18/2025
Special inspection requirement — Electrical motors and elevators
06/17/2025
Violation issued (ECB, open)
Unknown
06/16/2025
Violation issued (ECB, open)
Construction
05/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
05/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedBK Construction Services08/10/2026
DOB NOWSidewalk ShedPermit IssuedBK Construction Services07/30/2026
DOB NOWConstruction FencePermit IssuedBK Construction Services08/15/2025
DOB NOWSidewalk ShedPermit IssuedBK Construction Services07/31/2025
BISOTISSUEDLane Refrigeration Co02/25/2019
BISMHISSUEDLane Refrigeration Co02/25/2019
BISOTISSUEDDivya Construction of NYC03/05/2012
BISEQISSUEDDivya Construction of NYC03/05/2012
BISEQISSUEDRockledge Scaffold03/31/2010
BISEQISSUEDRockledge Scaffold02/25/2009
BISEQISSUEDRockledge Scaffold02/15/2008
BISEQISSUEDRockledge Scaffold04/17/2007
BISEQISSUEDRockledge Scaffold04/27/2006
BISPLISSUEDTaylor Group Plumbing, Heating Mechanical05/31/2005
BISEQISSUEDRockledge Scaffold03/22/2005
2 projects · most recent 03/30/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/30/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PURY-EP240TNU-A 240,000 BTU · Vrf Outdoor ×3
Heating
Mitsubishi Electric PURY-EP240TNU-A 250,000 BTU · Vrf Outdoor ×3
Ventilation
07/19/2023——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PURY-EP120TNU-A 120,000 BTU · Vrf Outdoor ×8
PURY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×7
PURY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×4
PURY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×4
PURY-EP216TNU-A 216,000 BTU · Vrf Outdoor ×2
MXZ-SM36NAM-U1 36,000 BTU · Heat Pump Outdoor ×1
Daikin DPS007A 90,200 BTU · Heat Pump Outdoor ×4
DPS004A 48,900 BTU · Heat Pump Outdoor ×2
DPS010A 133,700 BTU · Heat Pump Outdoor ×2
DPS012A 146,700 BTU · Heat Pump Outdoor ×1
Heating
Mitsubishi Electric PURY-EP120TNU-A 135,000 BTU · Vrf Outdoor ×8
PURY-EP96TNU-A 108,000 BTU · Vrf Outdoor ×7
PURY-EP144TNU-A 160,000 BTU · Vrf Outdoor ×4
PURY-EP72TNU-A 80,000 BTU · Vrf Outdoor ×4
PURY-EP216TNU-A 242,000 BTU · Vrf Outdoor ×2
MXZ-SM36NAM-U1 42,000 BTU ×1
Daikin DPS007A 82,700 BTU · Heat Pump Outdoor ×4
DPS004A 44,800 BTU · Heat Pump Outdoor ×2
DPS010A 107,900 BTU · Heat Pump Outdoor ×2
DPS012A 134,300 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck AX-103-400-0608-A150 11,130 CFM · Exhaust Fan ×3
Enervex BEF 450X 2,000 CFM · Exhaust Fan ×2
2 projects · most recent 03/30/2026
Sprinkler System
FiledStatusContractorScope
03/30/2026——Sprinkler System
06/22/2023——140 heads, 4 outlets
1 project · most recent 03/30/2026
Water/Sanitary
FiledStatusContractorScope
03/30/2026——Water/Sanitary
4 projects · most recent 07/22/2025
General Wiring
FiledStatusContractorScope
07/22/2025CompleteE.T. Electrical Contracting CoGeneral Wiring
06/23/2025Permit IssuedHigh Quality Electric of NYC—
03/25/2019Permit IssuedHY-Lee Electric CoGeneral Wiring
03/22/2018Permit IssuedWCK ElectricGeneral Wiring
1 project · most recent 07/19/2023
Steel Concrete Masonry
FiledStatusContractorScope
07/19/2023——Steel, Concrete, Masonry
1 project · most recent 08/14/2025
Fence Sidewalk Shed
FiledStatusContractorScope
08/14/2025Permit IssuedBK Construction ServicesFence, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
07/18/2025Shutoff dampers—energy_progress
07/18/2025Electrical motors and elevators—energy_progress
05/15/2025Maintenance information—energy_progress
05/15/2025HVAC-R and service water piping design and insulation—energy_progress
05/15/2025HVAC-R and service water heating system controls—energy_progress
05/15/2025Sprinkler Systems—special
05/15/2025Fire-Resistant Penetrations and Joints—special
05/15/2025Seismic Isolation Systems—special
05/15/2025Fire-Resistant Penetrations and Joints—special
05/15/2025Heating Systems—special
05/15/2025Duct leakage testing, insulation and design—energy_progress
05/15/2025HVAC-R and service water heating equipment—energy_progress
05/15/2025Energy Code Compliance Inspections—progress
05/15/2025Final—progress
05/15/2025Mechanical Systems—special
05/06/2025Fenestration air leakage—energy_progress
05/06/2025Air barrier - visual inspection—energy_progress
05/06/2025Insulation placement and R values—energy_progress
05/06/2025Fenestration and door U-factor and product ratings—energy_progress
05/06/2025Fenestration areas—energy_progress
11/15/2024Subsurface Conditions – Fill Placement & In-Place Density—special
11/15/2024Subgrade Inspections—special
11/15/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
11/15/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
10/19/2023Preliminary—progress
Latest 25 of 70.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bowery Residents' Committee (BRC)OfficeCellar, Floors 1–3, 5, Roof
Project M01226563 Alteration · Objections · 01/22/2026
Project M08010721 New Building · Objections · 10/04/2022
Lower Washington Heights NFCC ClinicMedical / HealthcareCellar, Sub-basement, Floors 1–4
Project M01243518 Alteration · Permit Entire · 07/30/2025
Project M00892774 Full Demolition · Approved · 06/30/2023
Project M00882864 Alteration · Approved · 06/22/2023
Project M00882870 Alteration · Approved · 06/22/2023
Project M00882878 Alteration · Approved · 06/22/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/30/2026M00882864-I1Request digital key ↗
08/30/2026M00882878-I1Request digital key ↗
08/30/2026M00882870-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION11
11/21/2022141021061Open ↗
08/10/2020123519406Open ↗
06/23/2020123519406Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION4
02/25/2019123519406Open ↗
02/25/2019123519406Open ↗
03/06/2012120997190Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/11/2023141021061Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M08010721-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/30/2026M00882864-I1Open ↗
08/30/2026M00882878-I1Open ↗
08/30/2026M00882870-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/12/2019123519406Open ↗
02/25/2019123519406Open ↗
02/25/2019123519406Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/25/2019123519406Open ↗
03/08/2012120997207Open ↗
03/08/2012120997190Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/08/2012120997190Open ↗
03/08/2012120997207Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/25/2019123519406Open ↗
02/25/2019123519406Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/28/2026M08010721-S9Open ↗
08/23/2026M00882870-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/21/2022141021061Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/21/2022141021061Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026M00882864-I1Open ↗
▸Trade Schedules & Equipment4
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/30/2020123519406Open ↗
▸BISEQUIPMENT USE PERMITS1
09/30/2020123519406Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/09/2012120103994Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026M08010721-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026M08010721-S6Open ↗
08/13/2026M08010721-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/21/2022141021061Open ↗
▸BISTenant Protection Plan and Notes1
02/25/2019123519406Open ↗
▸Environmental & Asbestos4
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/08/2012120997190Open ↗
03/08/2012120997207Open ↗
07/15/2009120103994Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/25/2019123519406Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/21/2020123519406Open ↗
08/10/2020123519406Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/08/2012120997207Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/25/2019123519406Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/21/2020123519406Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/21/2020123519406Open ↗
08/21/2020123519406Open ↗
08/10/2020123519406Open ↗
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/30/2026M00892774-S1Open ↗
08/19/2026M01226563-S2Open ↗
08/15/2026M00892774-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
08/13/2026M08010721-Z1Open ↗
08/13/2026M08010721-I1Open ↗
08/13/2026M00892774-S1Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/08/2012120997190Open ↗
03/08/2012120997207Open ↗
07/15/2009120103994Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026M00892774-S1Open ↗
08/13/2026M08010721-S6Open ↗
▸BISADULT ESTABLISHMENT APPROVAL1
06/23/2023141021061Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/21/2020123519406Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/21/2020123519406Open ↗
02/25/2019123519406Open ↗
03/08/2012120997207Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
02/25/2019123519406Open ↗
02/25/2019123519406Open ↗
03/08/2012120997190Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet2
07/15/2009120103994Open ↗
11/21/2022141021061Open ↗
▸BISADDITIONAL INFORMATION1
08/10/2020123519406Open ↗
▸BISBOROUGH INTAKE FORM1
03/16/2020123519406Open ↗
▸Other Documents13
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll7
08/13/2026M08010721-S4Open ↗
08/13/2026M08010721-Z1Open ↗
08/13/2026M08010721-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026M08010721-I1Open ↗
08/13/2026M08010721-S6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M08010721-S6Open ↗
08/13/2026M08010721-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/25/2019123519406Open ↗
▸DOB NOWStructure Photographs1
08/13/2026M00892774-I1Open ↗