Three families
1729 79 STREET
BROOKLYN · BIN 3162183
💬 Discuss this project
1915Year Built
2Stories
C0Building Class
R5Zoning
2,520 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
PlumbingGeneral
Floor 21p · 1 filing · 4 docs
Floor 11p · 1 filing · 4 docs
Cellar2p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/08/2024$990K—— → —$393/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI512/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394312/20/2024
Building Lifecycle
All (34)Filed (5)Permit Issued (3)Signed Off (2)Violation (15)Inspection (3)Special Inspection (6)
11/24/2025
Violation issued (HPD, closed)
I
02/03/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01095327-I1
01/31/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01095323-I1
01/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/20/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01095323-P2
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
12/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
12/19/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01095327-P1
12/19/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01095323-P1
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
12/19/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
12/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
12/04/2024
Violation issued (HPD, closed)
I
11/25/2024
Permit issued — General Construction
B01095323-I1-GC
10/02/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/04/2024
Permit issued — Plumbing
B01095327-I1-PL
08/20/2024
Permit issued — General Construction
B01095323-I1-GC
08/16/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01095327-I1
08/16/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01095323-I1
11/28/2023
Violation issued (HPD, closed)
I
11/07/2016
Violation issued (HPD, closed)
B
11/07/2016
Violation issued (HPD, closed)
B
11/07/2016
Violation issued (HPD, closed)
A
11/07/2016
Violation issued (HPD, closed)
B
05/17/2006
Violation issued (HPD, open)
A
05/17/2006
Violation issued (HPD, closed)
B
05/17/2006
Violation issued (HPD, closed)
B
05/17/2006
Violation issued (HPD, closed)
A
05/17/2006
Violation issued (HPD, closed)
B
05/17/2006
Violation issued (HPD, closed)
A
05/17/2006
Violation issued (HPD, closed)
A
05/09/2006
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/25/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG09/04/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC08/20/2024
1 project · most recent 09/04/2024
General Wiring
FiledStatusContractorScope
09/04/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/20/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/20/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
12/20/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
12/19/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/19/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
12/19/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026B01095323-P2Request digital key ↗
08/24/2026B01095323-P1Request digital key ↗
08/24/2026B01095323-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026B01095323-P1Open ↗
08/24/2026B01095323-P2Open ↗
08/24/2026B01095323-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/05/2026B01095323-I1Open ↗
08/28/2026B01095323-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/05/2026B01095323-I1Open ↗
08/28/2026B01095323-P1Open ↗