← Back
Two family converted from one family
1729 BOGART AVENUE
BRONX · Morris Park · BIN 2044491
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R4-1Zoning
1,596 sfGross Floor Area
2Units
Two family converted from one family · 5,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BABA CONSTRUCTION1307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/07/2023$220K—Private party → Private party$138/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC405/09/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BABA CONSTRUCTION CORPGeneral Contractor107/08/2026
HUDSON RIVER MECH GROUP IPlumbing107/08/2026
Building Lifecycle
All (13)Filed (4)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (2)
10/24/2024
Signed off — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-I1
10/24/2024
Signed off — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-S2
05/10/2024
Special inspection requirement — Final
Yahaira Volquez Colombo
05/09/2024
Filed — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-P1
05/09/2024
Filed — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-P2
04/11/2024
Special inspection requirement — Final
Yahaira Volquez Colombo
03/29/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/13/2023
Permit issued — General Construction
X00882211-I1-GC
12/07/2023
Permit issued — Plumbing
X00882211-S2-PL
11/27/2023
Filed — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-S2
06/26/2023
Filed — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBABA CONSTRUCTION CORP12/13/2023
DOB NOWPlumbingSigned-offHUDSON RIVER MECH GROUP I12/07/2023
1 project · most recent 10/17/2024
General Wiring
FiledStatusContractorScope
10/17/2024CompleteK.N.C ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/10/2024FinalYahaira Volquez Colomboprogress
04/11/2024FinalYahaira Volquez Colomboprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026X00882211-P2Request digital key ↗
08/21/2026X00882211-P1Request digital key ↗
08/21/2026X00882211-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026X00882211-I1Open ↗
08/13/2026X00882211-P1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026X00882211-P2Open ↗
08/21/2026X00882211-P1Open ↗
08/21/2026X00882211-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026X00882211-P1Open ↗
08/22/2026X00882211-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026X00882211-P1Open ↗
08/21/2026X00882211-S2Open ↗
08/21/2026X00882211-I1Open ↗
Showing 3 of 4 on file for this type