← Back
BuildNYC
Two family converted from one family
1729 BOGART AVENUE
BRONX · BIN 2044491
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R4-1Zoning
1,596 sfGross Floor Area
2Units
Two family converted from one family · 5,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic2p · 1 filing · 16 docs
Floor 26p · 1 filing · 16 docs
Floor 17p · 1 filing · 16 docs
Cellar2p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/07/2023$220K—Private party → Private party$138/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Colombo Architectural Studio405/09/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Baba ConstructionGeneral Contractor210/04/2026
Hudson River Mechanical Group IPlumbing107/08/2026
Building Lifecycle
10/24/2024
Signed off — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-I1
10/24/2024
Signed off — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-S2
05/10/2024
Special inspection requirement — Final
Yahaira Volquez Colombo
05/09/2024
Filed — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-P1
05/09/2024
Filed — Alteration
RELOCATE EXISTING GAS RANGE AT 1ST AND 2ND FLOORS REPLACED KITCHEN SINK AT FIRST AND SECOND FLOOR, REPLACE PLUMBING FIXTURES AT SECOND FLOOR BATHROOM, (2)NEW HWH HEATERS ,NEW WASHER DRYER AT SECOND FLOOR,(2) NEW HVAC, INSTALL (3) PIECE BATHROOM IN CELLAR.
X00882211-P2
14 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBaba Construction12/13/2023
DOB NOWPlumbingSigned-offHudson River Mechanical Group I12/07/2023
DOB NOWGeneral ConstructionSigned-offBig Apple Renovation & RE07/12/2023
1 project · most recent 10/17/2024
General Wiring
FiledStatusContractorScope
10/17/2024CompleteK.N.C. ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/10/2024FinalYahaira Volquez Colomboprogress
04/11/2024FinalYahaira Volquez Colomboprogress
16 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account