← Back
Two stories - detached, small or mid-size
173-58 105 AVENUE
QUEENS · South Jamaica · BIN 4218115
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4-1Zoning
974 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2021$545K—Private party → Private party$560/sf building
08/15/2019$475K—Private party → Private party$488/sf building
11/14/2017$366K—— → —$376/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC102/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272102/09/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (2)Special Inspection (5)
02/20/2024
Permit issued — Solar
Q01000084-I1-SL
02/09/2024
Filed — Alteration
Q01000084-I1
02/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
02/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
02/02/2024
Special inspection requirement — Final
Walid Abdulla
02/02/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/08/2002
Violation issued (HPD, closed)
C
01/02/2002
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/20/2024
1 project · most recent 02/09/2024
FiledStatusContractorScope
02/09/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/02/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/02/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/02/2024Energy Code Compliance InspectionsWalid Abdullaprogress
02/02/2024FinalWalid Abdullaprogress
02/02/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q01000084-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01000084-I1Open ↗
08/25/2026Q01000084-I1Open ↗
08/25/2026Q01000084-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01000084-I1Open ↗
08/25/2026Q01000084-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01000084-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01000084-I1Open ↗