← Back
Two stories - detached, small or mid-size
173-62 103 ROAD
QUEENS · BIN 4218014
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R4-1Zoning
990 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: U.S. BANK TRUST, NATIONAL ASSOCIATION, N OT IN ITS · 2,500 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction6p · 1 filing · 12 docs
Floor 1Under Construction6p · 1 filing · 12 docs
CellarUnder Construction6p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
U S BANK TRUST NATIONAL A103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/10/2024$561K—Private party → U.S. BANK TRUST, NATIONAL ASSOCIATION, NOT IN ITS$567/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KYU LEE ARCHITECT, PC307/22/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL TEAM NY INCGeneral Contractor104/11/2026
S & L PLUMBING INCPlumbing107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KYU LEE ARCHITECT, PC1978207/22/2026
Building Lifecycle
All (80)Filed (3)Permit Issued (2)Violation (60)Inspection (9)Special Inspection (6)
08/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 2 STORY 1 FAMILY DWELLING. WORKS INCLUDE MINOR PARITIONS, NEW FINISH FOR FLOOR, WALLS & CEILING, WINDOWS REPLACEMENT IN EXISTING OPENINGS. NO CHANGE IN USE, OCCUPANCY, EGRESS OR BULK OF BUILING UNDER THIS APPLICATION.
Q01371327-P1
06/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kyumyeon Lee
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Kyumyeon Lee
06/04/2026
Special inspection requirement — Fenestration areas
Kyumyeon Lee
06/04/2026
Special inspection requirement — Interior lighting power
Kyumyeon Lee
06/04/2026
Special inspection requirement — Fenestration air leakage
Kyumyeon Lee
06/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Kyumyeon Lee
06/03/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/18/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2026
Permit issued — Plumbing
Q01371327-S1-PL
04/09/2026
Permit issued — General Construction
Q01371327-I1-GC
03/16/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 2 STORY 1 FAMILY DWELLING. WORKS INCLUDE MINOR PARITIONS, NEW FINISH FOR FLOOR, WALLS & CEILING, WINDOWS REPLACEMENT IN EXISTING OPENINGS. NO CHANGE IN USE, OCCUPANCY, EGRESS OR BULK OF BUILING UNDER THIS APPLICATION.
Q01371327-S1
03/16/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 2 STORY 1 FAMILY DWELLING. WORKS INCLUDE MINOR PARITIONS, NEW FINISH FOR FLOOR, WALLS & CEILING, WINDOWS REPLACEMENT IN EXISTING OPENINGS. NO CHANGE IN USE, OCCUPANCY, EGRESS OR BULK OF BUILING UNDER THIS APPLICATION.
Q01371327-I1
02/05/2026
Violation issued (ECB, closed)
Construction
11/25/2025
Violation issued (HPD, closed)
I
07/16/2025
Violation issued (HPD, closed)
B
07/16/2025
Violation issued (HPD, closed)
C
07/16/2025
Violation issued (HPD, closed)
B
07/16/2025
Violation issued (HPD, closed)
B
07/16/2025
Violation issued (HPD, closed)
B
07/16/2025
Violation issued (HPD, closed)
B
07/16/2025
Violation issued (HPD, closed)
B
07/16/2025
Violation issued (HPD, closed)
A
07/16/2025
Violation issued (HPD, closed)
B
07/16/2025
Violation issued (HPD, closed)
B
07/16/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
C
06/25/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
C
06/18/2025
Violation issued (HPD, closed)
C
06/18/2025
Violation issued (HPD, closed)
C
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
A
06/18/2025
Violation issued (HPD, closed)
A
06/01/2025
Violation issued (HPD, closed)
B
06/01/2025
Violation issued (HPD, closed)
B
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedS & L PLUMBING INC04/10/2026
DOB NOWGeneral ConstructionPermit IssuedGLOBAL TEAM NY INC04/09/2026
1 project · most recent 07/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/22/2026Permit IssuedS & L PLUMBING INCGas, Water/Sanitary
1 project · most recent 03/13/2024
General Wiring
FiledStatusContractorScope
03/13/2024CompleteHMA ELECTRIC, LLCGeneral Wiring
1 project · most recent 07/22/2026
FiledStatusContractorScope
07/22/2026Permit IssuedS & L PLUMBING INC1 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/18/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
05/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/04/2026Fire-Resistant Penetrations and JointsKyumyeon Leespecial
06/04/2026Energy Code Compliance InspectionsKyumyeon Leeprogress
06/04/2026Fenestration areasKyumyeon Leeenergy_progress
06/04/2026Interior lighting powerKyumyeon Leeenergy_progress
06/04/2026Fenestration air leakageKyumyeon Leeenergy_progress
06/04/2026Fenestration and door U-factor and product ratingsKyumyeon Leeenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01371327-S1Request digital key ↗
08/17/2026Q01371327-I1Request digital key ↗
08/17/2026Q01371327-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026Q01371327-S1Open ↗
08/17/2026Q01371327-I1Open ↗
08/17/2026Q01371327-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01371327-P1Open ↗
09/23/2026Q01371327-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q01371327-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01371327-S1Open ↗
08/17/2026Q01371327-P1Open ↗
08/17/2026Q01371327-I1Open ↗