← Back
Two family frame
173 BURKE AVENUE
STATEN ISLAND · BIN 5041667
💬 Discuss this project
2023Year Built
3Stories
B2Building Class
R3AZoning
3,300 sfGross Floor Area
2Units
Two family frame · 4,583 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof1p · 1 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION1807/08/2026
WALLACE AVENUE BUILDERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT501/29/2024
ISLAND ENGINEERING ASSOCIATES301/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor803/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264201/29/2024
Building Lifecycle
All (60)Filed (8)Permit Issued (6)Signed Off (4)Inspection (12)Special Inspection (30)
04/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/12/2024
Signed off — New Building
PROPOSED 18' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE.
S08053318-S1
02/12/2024
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S00840126-I1
02/06/2024
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Structural Steel - Details
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Lowest Floor Elevation
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Lighting in dwelling units
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
02/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
02/05/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
02/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2024
Filed — New Building
PROPOSED 18' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE.
S08053318-P2
01/29/2024
Signed off — New Building
PROPOSED 18' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE.
S08053318-S2
01/26/2024
Filed — New Building
PROPOSED 18' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE.
S08053318-P1
01/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/18/2024
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S00840126-P1
01/17/2024
Signed off — Alteration
FILED HEREWITH; SOLID WOOD (O.S.B) CONSTRUCTION FENCE. THIS APPLICATION SHALL ALSO APPLY TO 177 BURKE AVENUE LOT: 95
S00683714-I1
01/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/19/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2023
Permit issued — Plumbing
S00840126-I1-PL
06/30/2023
Permit issued — Construction Fence
S00683714-I1-FN
05/11/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/05/2023
Permit issued — Plumbing
S08053318-S1-PL
04/10/2023
Permit issued — Curb Cut
S08053318-S2-CC
04/06/2023
Filed — New Building
PROPOSED 18' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE.
S08053318-S1
04/06/2023
Filed — New Building
PROPOSED 18' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE.
S08053318-S2
04/06/2023
Permit issued — Mechanical Systems
S08053318-I1-GC-CX
03/08/2023
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN
S00840126-I1
12/22/2022
Filed — New Building
PROPOSED 18' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE.
S08053318-I1
03/17/2022
Permit issued — Construction Fence
S00683714-I1-FN
02/18/2022
Filed — Alteration
FILED HEREWITH; SOLID WOOD (O.S.B) CONSTRUCTION FENCE. THIS APPLICATION SHALL ALSO APPLY TO 177 BURKE AVENUE LOT: 95
S00683714-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/26/2023
DOB NOWConstruction FenceSigned-offWALLACE AVENUE CONSTR LLC06/30/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/05/2023
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC04/10/2023
DOB NOWMechanical SystemsPermit IssuedWALLACE AVENUE CONSTR LLC04/06/2023
DOB NOWConstruction FenceSigned-offWALLACE AVENUE CONSTR LLC03/17/2022
BIS—ISSUEDWALLACE AVENUE CONSTR LLC02/02/2023
1 project · most recent 01/29/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/29/2024Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 01/19/2024
General Wiring
FiledStatusContractorScope
01/19/2024CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 01/29/2024
Concrete Wood
FiledStatusContractorScope
01/29/2024Signed-offFLOW-RIGHT PLBG & HTG CORConcrete, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
02/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
01/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2023Pass-Final PL - UndergroundPassView ↗
08/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
02/06/2024Structural Steel - High Strength BoltingWILLIAM DURDEN, P.E.special
02/06/2024Mechanical SystemsWILLIAM DURDEN, P.E.special
02/06/2024Subgrade InspectionsWILLIAM DURDEN, P.E.special
02/06/2024Structural Steel - WeldingWILLIAM DURDEN, P.E.special
02/06/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
02/06/2024Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
02/06/2024Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
02/06/2024Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
02/06/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)WILLIAM DURDEN, P.E.special
02/06/2024Structural Steel - DetailsWILLIAM DURDEN, P.E.special
02/06/2024Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
02/06/2024FinalWILLIAM DURDEN, P.E.progress
02/06/2024Lowest Floor ElevationWILLIAM DURDEN, P.E.progress
02/06/2024Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
02/06/2024Footing and FoundationWILLIAM DURDEN, P.E.progress
02/06/2024Structural Wood FrameWILLIAM DURDEN, P.E.progress
02/06/2024Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
02/06/2024HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
02/06/2024HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
02/06/2024Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
02/06/2024Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
02/06/2024Lighting in dwelling unitsWILLIAM DURDEN, P.E.energy_progress
02/06/2024Fenestration areasWILLIAM DURDEN, P.E.energy_progress
02/06/2024Permanent certificateWILLIAM DURDEN, P.E.energy_progress
02/06/2024Maintenance informationWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 33.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026S00683714-I1Request digital key ↗
08/23/2026S00840126-P1Request digital key ↗
08/23/2026S00840126-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
06/08/2023540209139Open ↗
01/09/2023520465416Open ↗
11/19/2021520393011Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
12/22/2021540209139Open ↗
11/12/2021540209139Open ↗
▸BISWORK PERMIT APPLICATION1
02/02/2023520465416Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
12/01/2021520393011Open ↗
11/12/2021540209139Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S08053318-I1Open ↗
08/13/2026S08053318-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S08053318-I1Open ↗
08/13/2026S08053318-P2Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/12/2021540209139Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08053318-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026S00683714-I1Open ↗
08/23/2026S08053318-P2Open ↗
08/23/2026S08053318-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S08053318-I1Open ↗
09/01/2026S08053318-I1Open ↗
09/01/2026S08053318-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S08053318-I1Open ↗
09/01/2026S08053318-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/12/2021540209139Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/12/2021540209139Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S08053318-P2Open ↗
08/13/2026S08053318-I1Open ↗
▸BISELECTRIC CUT-OFF1
02/02/2023520465416Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
02/02/2023520465416Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/02/2023520465416Open ↗
▸BISGAS CUT-OFF1
02/02/2023520465416Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/23/2026S08053318-I1Open ↗
08/23/2026S08053318-P2Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/02/2023520465416Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/02/2023520465416Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08053318-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08053318-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08053318-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/10/2023520465416Open ↗
▸BISRODENT CONTROL1
02/02/2023520465416Open ↗
▸Inspections & Test Reports5
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
12/22/2021540209139Open ↗
11/12/2021540209139Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S08053318-P2Open ↗
08/13/2026S08053318-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08053318-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
12/22/2021540209139Open ↗
11/12/2021540209139Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/12/2023540209139Open ↗
02/02/2023520465416Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
02/02/2023520465416Open ↗
▸BISLANDMARKS APPROVAL1
02/02/2023520465416Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/02/2023520465416Open ↗
▸Cost, Insurance & Ownership2
▸BISWC-DB-100 (Replaces Form C-105-21)Affidavit for NY Entities And Any Out of State Entities with no employees1
02/02/2023520465416Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/02/2023520465416Open ↗
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
02/02/2023520465416Open ↗
01/09/2023520465416Open ↗
11/19/2021520393011Open ↗
▸BISEFILING COVER SHEET2
01/09/2023520465416Open ↗
11/19/2021520393011Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/12/2021540209139Open ↗
▸BISADDITIONAL INFORMATION1
02/02/2023520465416Open ↗
▸Other Documents14
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S08053318-I1Open ↗
08/13/2026S08053318-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S08053318-I1Open ↗
08/13/2026S08053318-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026S08053318-P2Open ↗
08/23/2026S08053318-I1Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
02/02/2023520465416Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/02/2023520465416Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
12/22/2021540209139Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
02/02/2023520465416Open ↗
▸BISPLOT DIAGRAM1
12/01/2021520393011Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/12/2021540209139Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08053318-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026S08053318-I1Open ↗