Elevator apt, semi-fireproof without stores
173 EAST 205TH STREET
BRONX · BIN 2807362
💬 Discuss this project
2022Year Built
8Stories
D1Building Class
R8Zoning
39,984 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized6 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 171 & 173 E. 205th Realty · 7,300 sf lot · 5.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMechanical systems installation4 filings
RoofBoiler installation2p · 2 filings
Floor 1Boiler installation1p · 2 filings
CellarRooftop photovoltaic solar panel installation1p · 2 filings
Site & exteriorConstruction fence for property perimeter2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2074 Walton Realty403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC Engineering603/21/2026
Brooklyn Solarworks103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKF General ContractorsGeneral Contractor2403/21/2026
SKF General ContractorsScaffold807/08/2026
Master Tech PlumbingPlumbing507/08/2026
Consolidated ScaffoldingScaffold507/08/2026
SKF General Contractorsspecialty_contractor203/21/2026
Full Capacity FireFire Protection107/08/2026
John AlleyneElectrical103/21/2026
Pinnacle Plumbing & HeatingPlumbing107/08/2026
Brooklyn Solarworksspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mastrogiacomo Engineering4237606/26/2025
Automated Design Consulta895611/27/2024
NKM Engineering6244108/27/2024
Times Buildings Engineering710507/27/2023
Building Lifecycle
01/29/2026
Elevator Category 1 inspection report filed
11/17/2025
Boiler inspection report filed
Initial · no defects · Accepted
07/10/2025
Signed off — Alteration
Install sprinkler and plumbing systems per the plans filed herewith and in conjunction with NB#240301794. The sprinkler system is hydraulically calculated. There is no change in use, occupancy, or egress.
X00634092-I1
07/10/2025
Signed off — Alteration
Install mechanical systems per drawings filed herewith and in conjunction with NB#240301794. There is no change in use, occupancy, or egress.
X00605126-I1
07/10/2025
Signed off — Alteration
Install boilers per drawings filed herewith and in conjunction with NB#240301794. There is no change in use, occupancy, or egress.
X00657911-I1
97 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSKF General Contractors02/12/2025
DOB NOWBoiler EquipmentSigned-offMaster Tech Plumbing11/06/2024
DOB NOWSolarSigned-offBrooklyn Solarworks08/28/2024
DOB NOWPlumbingSigned-offMaster Tech Plumbing07/23/2024
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding07/01/2024
DOB NOWGeneral ConstructionPermit IssuedSKF General Contractors06/26/2024
DOB NOWConstruction FenceSigned-offSKF General Contractors06/26/2024
DOB NOWSprinklersSigned-offFull Capacity Fire04/30/2024
DOB NOWStructuralPermit IssuedSKF General Contractors03/28/2024
DOB NOWStructuralPermit IssuedSKF General Contractors03/12/2024
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding10/13/2023
DOB NOWPlumbingSigned-offMaster Tech Plumbing08/21/2023
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding07/14/2023
DOB NOWConstruction FenceSigned-offSKF General Contractors06/26/2023
DOB NOWEarth WorkPermit IssuedSKF General Contractors03/14/2023
DOB NOWGeneral ConstructionPermit IssuedSKF General Contractors03/14/2023
DOB NOWSupport of ExcavationSigned-offSKF General Contractors03/14/2023
DOB NOWGeneral ConstructionPermit IssuedSKF General Contractors03/14/2023
DOB NOWPlumbingSigned-offPinnacle Plumbing & Heating03/08/2023
DOB NOWGeneral ConstructionPermit IssuedSKF General Contractors11/18/2022
DOB NOWConstruction FenceSigned-offSKF General Contractors07/06/2022
DOB NOWGeneral ConstructionPermit IssuedSKF General Contractors04/08/2022
DOB NOWEarth WorkPermit IssuedSKF General Contractors04/08/2022
DOB NOWStructuralPermit IssuedSKF General Contractors04/08/2022
DOB NOWSupport of ExcavationSigned-offSKF General Contractors03/29/2022
DOB NOWConstruction FenceSigned-offSKF General Contractors07/22/2021
DOB NOWConstruction FenceSigned-offSKF General Contractors04/01/2021
4 projects · most recent 07/20/2025
General Wiring
FiledStatusContractorScope
07/20/2025CompleteJam Electrical—
03/05/2025CompleteBulk ElectricGeneral Wiring
08/26/2024CompleteBrookyln Solarworks—
07/19/2023CompleteSolas Electrical—
1 project · most recent 07/27/2023
Steel Masonry
FiledStatusContractorScope
07/27/2023Permit IssuedSKF General ContractorsSteel, Masonry
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/06/2024Pass-Final Boiler Equipment InspectionPassView ↗
11/21/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/14/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/15/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
07/01/2025Sprinkler SystemsMICHAEL MASTROGIACOMOspecial
06/26/2025Sprinkler SystemsMICHAEL MASTROGIACOMOspecial
11/27/2024FinalMICHAEL MASTROGIACOMOprogress
11/27/2024Ventilation and air distribution systemMICHAEL MASTROGIACOMOenergy_progress
11/27/2024HVAC-R and service water piping design and insulationMICHAEL MASTROGIACOMOenergy_progress
11/27/2024HVAC-R and service water heating equipmentMICHAEL MASTROGIACOMOenergy_progress
11/27/2024Shutoff dampersMICHAEL MASTROGIACOMOenergy_progress
11/27/2024HVAC-R and service water heating system controlsMICHAEL MASTROGIACOMOenergy_progress
11/27/2024Mechanical SystemsMICHAEL MASTROGIACOMOspecial
11/27/2024Heating SystemsMICHAEL MASTROGIACOMOspecial
11/27/2024Heating SystemsMICHAEL MASTROGIACOMOspecial
11/27/2024HVAC-R and service water heating system controlsGregory Mortmanenergy_progress
11/27/2024Energy Code Compliance InspectionsMICHAEL MASTROGIACOMOprogress
11/27/2024Ventilation and air distribution systemGregory Mortmanenergy_progress
11/27/2024Shutoff dampersGregory Mortmanenergy_progress
11/27/2024HVAC-R and service water piping design and insulationGregory Mortmanenergy_progress
11/27/2024Mechanical SystemsGregory Mortmanspecial
11/27/2024Energy Code Compliance InspectionsGregory Mortmanprogress
11/27/2024FinalGregory Mortmanprogress
11/27/2024HVAC-R and service water heating equipmentGregory Mortmanenergy_progress
11/18/2024Sprinkler SystemsGregory Mortmanspecial
08/22/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/22/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/22/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/22/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
Latest 25 of 62.
82 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account