1899Year Built
4Stories
A4Building Class
R8BZoning
2,576 sfGross Floor Area
1Units
0 Open Violations
City residence, one family · 1,607 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof17p · 3 filings · 18 docs
Floor 569p · 5 filings · 20 docs
Floor 472p · 6 filings · 20 docs
Floor 375p · 6 filings · 20 docs
Floor 272p · 6 filings · 20 docs
Floor 168p · 6 filings · 20 docs
Cellar73p · 6 filings · 20 docs
Basement32p · 1 filing · 20 docs
Sub-Basement34p · 4 filings · 20 docs
Site & exterior23p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REGELE BUILDERS403/22/2026
BUILDERS INC REGELE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/19/2021$4.7M—173 EAST 64TH STREET LLC → Private party$1,836/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERIC SHEFFIELD ARCHITECT504/16/2025
P.A. COLLINS PE801/13/2025
TOHFAZ UDDIN PE PC1007/05/2023
S.M. BERGER ARCHITECTURE PC112/09/2022
BLUE SKY DESIGN, INC.609/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.4003/21/2026
SYNERGY BUILDING CONSULTANTS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REGELE BUILDERS, INCGeneral Contractor3207/08/2026
PRECISION HOIST & SCAFFO*General Contractor2007/08/2026
MACREDDIN PLBG & HTG INCPlumbing307/08/2026
ROMCON ELECTRIC, INCElectrical103/22/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
P & D MECHANICAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ERIC SHEFFIELD ARCHITECT2195504/16/2025
P.A.COLLINS INSPECTIONS P21681001/13/2025
BLUE SKY DESIGN, INC.1908609/30/2022
Building Lifecycle
All (189)Filed (30)Permit Issued (35)Signed Off (13)Violation (5)Inspection (10)Objection (66)Special Inspection (30)
05/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sheffield
04/23/2025
Special inspection requirement — Fenestration air leakage
Eric Sheffield
04/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sheffield
04/23/2025
Special inspection requirement — Insulation placement and R values
Eric Sheffield
04/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Sheffield
04/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sheffield
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sheffield
04/23/2025
Special inspection requirement — Chimneys and vents
Eric Sheffield
04/23/2025
Special inspection requirement — Masonry
Eric Sheffield
04/23/2025
Special inspection requirement — Interior lighting power
Eric Sheffield
04/23/2025
Special inspection requirement — Fenestration areas
Eric Sheffield
04/23/2025
Special inspection requirement — Lighting controls
Eric Sheffield
04/23/2025
Special inspection requirement — Exterior lighting power
Eric Sheffield
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sheffield
04/16/2025
Filed — Alteration CO
Erect and additional story and penthouse, extend building out 11 feet. install new stair and elevator.
M00641264-P4
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sheffield
04/07/2025
Special inspection requirement — Masonry
Eric Sheffield
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Sheffield
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sheffield
04/07/2025
Special inspection requirement — Exterior lighting power
Eric Sheffield
04/07/2025
Special inspection requirement — Fenestration areas
Eric Sheffield
04/07/2025
Special inspection requirement — Insulation placement and R values
Eric Sheffield
04/07/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sheffield
04/07/2025
Special inspection requirement — Lighting controls
Eric Sheffield
04/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sheffield
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sheffield
04/07/2025
Special inspection requirement — Interior lighting power
Eric Sheffield
04/07/2025
Special inspection requirement — Fenestration air leakage
Eric Sheffield
04/07/2025
Special inspection requirement — Chimneys and vents
Eric Sheffield
03/12/2025
Signed off — Alteration
INSTALLATION OF NEW 2.5" COMBINED SPRINKLER WATER SERVICE WITH 2"DOMESTIC TAKE-OFF, A NEW 2.5" DCDA, NEW WATER HEATERS (2), NEWCONSTANT PRESSURE SET, AND NEW PLUMBING SYSTEM ON FLOORS, CELLAR,BASEMENT, 001-005, AND PLUMBING VENT TO ROOF, AS SHOWN ON PLANS
M00697511-I1
03/10/2025
Signed off — Alteration
MECHANICAL RENOVATION OF AN EXISTINGTOWNHOUSE APARTMENT. NO CHANGE IN USE,EGRESS OR OCCUPANCY PROPOSED UNDER THISAPPLICATION.
M00697505-I1
03/04/2025
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM ON FLOORS, CELLAR,BASEMENT, 001-005, AND INSPECTOR'S TEST TEE AT THE FIFTH FLOOREXTERIOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY, OREGRESS.
M00697518-I1
02/25/2025
Special inspection requirement — Sprinkler Systems
Paul Collins
02/05/2025
Objection resolved — Addressed
02/04/2025
Objection raised — Scope
01/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2025
Permit issued — Plumbing
M00697511-I1-PL
01/13/2025
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM ON FLOORS, CELLAR,BASEMENT, 001-005, AND INSPECTOR'S TEST TEE AT THE FIFTH FLOOREXTERIOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY, OREGRESS.
M00697518-P3
12/27/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/03/2024
Signed off — Alteration
M08046428-I1
11/07/2024
Signed off — Alteration
REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00615395-I1
10/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/21/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/24/2024
Signed off — Alteration
M07998081-I1
09/24/2024
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M07998126-I1
09/24/2024
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M07998053-I1
09/24/2024
Signed off — Alteration
M07998061-I1
09/24/2024
Signed off — Alteration
M07998074-I1
09/20/2024
Special inspection requirement — Maintenance information
Paul Collins
09/19/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/10/2024
Objection resolved — Addressed
09/05/2024
Objection raised — Scope
08/23/2024
Filed — Alteration
MECHANICAL RENOVATION OF AN EXISTINGTOWNHOUSE APARTMENT. NO CHANGE IN USE,EGRESS OR OCCUPANCY PROPOSED UNDER THISAPPLICATION.
M00697505-P3
08/23/2024
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM ON FLOORS, CELLAR,BASEMENT, 001-005, AND INSPECTOR'S TEST TEE AT THE FIFTH FLOOREXTERIOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY, OREGRESS.
M00697518-P2
08/08/2024
Filed — Alteration
INSTALLATION OF NEW 2.5" COMBINED SPRINKLER WATER SERVICE WITH 2"DOMESTIC TAKE-OFF, A NEW 2.5" DCDA, NEW WATER HEATERS (2), NEWCONSTANT PRESSURE SET, AND NEW PLUMBING SYSTEM ON FLOORS, CELLAR,BASEMENT, 001-005, AND PLUMBING VENT TO ROOF, AS SHOWN ON PLANS
M00697511-P3
07/25/2024
Permit issued — General Construction
M00641264-I1-GC
07/03/2024
Objection resolved — Addressed
07/03/2024
Objection resolved — Addressed
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC01/23/2025
DOB NOWGeneral ConstructionPermit IssuedREGELE BUILDERS, INC07/25/2024
DOB NOWConstruction FenceSigned-offREGELE BUILDERS, INC03/11/2024
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC01/23/2024
DOB NOWMechanical SystemsSigned-offREGELE BUILDERS, INC11/17/2023
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC11/02/2023
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*09/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*09/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*09/05/2023
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*09/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*09/05/2023
DOB NOWSupport of ExcavationSigned-offREGELE BUILDERS, INC07/20/2023
DOB NOWGeneral ConstructionPermit IssuedREGELE BUILDERS, INC07/20/2023
DOB NOWGeneral ConstructionPermit IssuedREGELE BUILDERS, INC07/20/2023
DOB NOWConstruction FenceSigned-offREGELE BUILDERS, INC03/17/2023
DOB NOWGeneral ConstructionPermit IssuedREGELE BUILDERS, INC03/17/2023
DOB NOWSupport of ExcavationSigned-offREGELE BUILDERS, INC03/17/2023
DOB NOWFoundationSigned-offREGELE BUILDERS, INC03/17/2023
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP02/14/2023
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC02/01/2023
DOB NOWConstruction FenceSigned-offREGELE BUILDERS, INC12/10/2022
DOB NOWMechanical SystemsSigned-offREGELE BUILDERS, INC12/09/2022
DOB NOWSupport of ExcavationSigned-offREGELE BUILDERS, INC11/28/2022
DOB NOWGeneral ConstructionPermit IssuedREGELE BUILDERS, INC10/22/2022
DOB NOWStructuralSigned-offREGELE BUILDERS, INC10/21/2022
DOB NOWFoundationSigned-offREGELE BUILDERS, INC10/04/2022
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*09/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*09/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*09/14/2022
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*09/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*09/14/2022
DOB NOWGeneral ConstructionPermit IssuedREGELE BUILDERS, INC08/22/2022
DOB NOWGeneral ConstructionPermit IssuedREGELE BUILDERS, INC08/02/2022
DOB NOWGeneral ConstructionSigned-offREGELE BUILDERS, INC07/15/2022
DOB NOWGeneral ConstructionSigned-offREGELE BUILDERS, INC11/19/2021
1 project · most recent 10/27/2021
Water/Sanitary
FiledStatusContractorScope
10/27/2021——Water/Sanitary
3 projects · most recent 01/24/2025
FiledStatusContractorScope
01/24/2025CompleteROMCON ELECTRIC, INC1 meters, 1 new_meters
02/16/2023CompleteTITAN ELEC'L & ELEV CONTR—
09/07/2022CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/27/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
10/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/06/2023Pass-Final PL - UndergroundPassView ↗
05/16/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
04/23/2025Fire-Resistance Rated ConstructionEric Sheffieldprogress
04/23/2025Energy Code Compliance InspectionsEric Sheffieldprogress
04/23/2025Fenestration air leakageEric Sheffieldenergy_progress
04/23/2025Air barrier - visual inspectionEric Sheffieldenergy_progress
04/23/2025Interior lighting powerEric Sheffieldenergy_progress
04/23/2025Insulation placement and R valuesEric Sheffieldenergy_progress
04/23/2025Fenestration and door U-factor and product ratingsEric Sheffieldenergy_progress
04/23/2025Fenestration areasEric Sheffieldenergy_progress
04/23/2025Exterior lighting powerEric Sheffieldenergy_progress
04/23/2025Chimneys and ventsEric Sheffieldspecial
04/23/2025Lighting controlsEric Sheffieldenergy_progress
04/23/2025MasonryEric Sheffieldspecial
04/23/2025Structural Stability – Alterations of existing buildingsEric Sheffieldspecial
04/23/2025Fire-Resistant Penetrations and JointsEric Sheffieldspecial
04/07/2025Air barrier - visual inspectionEric Sheffieldenergy_progress
04/07/2025Fenestration areasEric Sheffieldenergy_progress
04/07/2025Interior lighting powerEric Sheffieldenergy_progress
04/07/2025Fenestration and door U-factor and product ratingsEric Sheffieldenergy_progress
04/07/2025Lighting controlsEric Sheffieldenergy_progress
04/07/2025Fire-Resistance Rated ConstructionEric Sheffieldprogress
04/07/2025Energy Code Compliance InspectionsEric Sheffieldprogress
04/07/2025Structural Stability – Alterations of existing buildingsEric Sheffieldspecial
04/07/2025MasonryEric Sheffieldspecial
04/07/2025Fire-Resistant Penetrations and JointsEric Sheffieldspecial
04/07/2025Chimneys and ventsEric Sheffieldspecial
Latest 25 of 88.
▾Documents — 185 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
09/03/2026M00615395-S2Request digital key ↗
09/02/2026M00727999-P1Request digital key ↗
09/02/2026M00727999-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026M00641264-I1Open ↗
08/24/2026M00641264-P3Open ↗
08/24/2026M00641264-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/24/2026M00641264-I1Open ↗
08/24/2026M00641264-P3Open ↗
08/13/2026M00641264-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00641264-I1Open ↗
▸Seals & Professional Certifications110
▸DOB NOWProgress Inspector Seal & Signature48
09/22/2026M00697570-P1Open ↗
08/29/2026M00727999-P1Open ↗
08/28/2026M00641264-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/22/2026M00697570-P1Open ↗
09/22/2026M00697570-P1Open ↗
09/22/2026M00697570-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/02/2026M00727999-I1Open ↗
09/02/2026M00727999-P1Open ↗
09/01/2026M07998074-I1Open ↗
Showing 3 of 31 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/24/2026M00641264-I1Open ↗
08/24/2026M00641264-P1Open ↗
08/24/2026M00641264-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/02/2026M00727999-I1Open ↗
08/26/2026M00697505-I1Open ↗
08/15/2026M00697511-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026M00641264-I1Open ↗
08/13/2026M00697505-I1Open ↗
08/13/2026M00615395-I1Open ↗
▸Other Documents21
▸DOB NOWPlot Diagram6
08/24/2026M00641264-P3Open ↗
08/24/2026M00641264-I1Open ↗
08/24/2026M00641264-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/24/2026M00641264-I1Open ↗
08/24/2026M00641264-P3Open ↗
08/13/2026M00641264-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/24/2026M00641264-P3Open ↗
08/24/2026M00641264-I1Open ↗
08/13/2026M00641264-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026M00641264-I1Open ↗
08/24/2026M00641264-P3Open ↗
08/24/2026M00641264-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00641264-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00698917-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00641264-I1Open ↗