← Back
Elevator apt, semi-fireproof with stores
173 HENRY STREET
MANHATTAN · BIN 1003614
💬 Discuss this project
1920Year Built
8Stories
D7Building Class
R7-2Zoning
33,601 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized24 Open Violations 23 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: KING HENRY REALTY INC · 5,180 sf lot · 6.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof3p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY209/13/2026
KYC PROPERTY1207/08/2026
TOPLINE NYC CONTRACTING707/08/2026
WAAN ENTERPRISE707/08/2026
KING HENRY REALTY6003/22/2026
AT&T503/22/2026
BETHEL MANAGEMENT303/22/2026
GREEN CITY REALTY203/22/2026
HENRY ST ASSOCIA203/22/2026
HENRY STREET ASSOCIATES1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VOLUME SPACE CONSULTING INC.104/06/2026
HUAN DESIGN INC.402/21/2025
STEFANO MORISI R.A.110/19/2022
KMB DESIGN GROUP, LLC209/22/2022
SYED ENGINEERING, P.C.107/30/2020
MCRB SERVICE CORP103/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.203/21/2026
PERMIT SERVICES203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor707/08/2026
TEAMWORK ENTERPRISES INCGeneral Contractor303/21/2026
ETAK SYSTEMS LLCGeneral Contractor303/21/2026
JACOBS TELECOMMUN. INCGeneral Contractor303/21/2026
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
ACE GROUP NY CORPGeneral Contractor104/09/2026
TOPLINE NYC INCGeneral Contractor107/08/2026
WAAN ENTERPRISES INCGeneral Contractor107/08/2026
INTERBORO PLBG & HTG CORPElectrical103/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
KANE, PAPAElectrical103/21/2026
LOUIS DEMICHELEElectrical103/21/2026
ON GUK TSEElectrical103/21/2026
SPADARO, JERRYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669402/21/2025
DYO DESIGN OFFICE LLC6701110/19/2022
KMB DESIGN GROUP, LLC513209/22/2022
Building Lifecycle
All (125)Filed (10)Permit Issued (11)Signed Off (6)Facade (FISP) (11)Violation (60)Inspection (3)Objection (6)Special Inspection (18)
06/29/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGES IN USE, EGRESS OR OCCUPANCY IN THIS APPLICATION.
M01383005-I1
04/06/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGES IN USE, EGRESS OR OCCUPANCY IN THIS APPLICATION.
M01383005-I1
04/06/2026
Permit issued — Sidewalk Shed
M01383005-I1-SH
03/03/2025
Signed off — Alteration
INTERIOR RENOVATION ON 2ND FLOOR (APT. #2E) OF AN EXIST'G 8 STORY, MIXED USE BUILDING WITH, REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01102228-S1
03/03/2025
Signed off — Alteration
INTERIOR RENOVATION ON 2ND FLOOR (APT. #2E) OF AN EXIST'G 8 STORY, MIXED USE BUILDING WITH, REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01102228-I1
02/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
02/22/2025
Violation issued (HPD, closed)
B
02/22/2025
Violation issued (HPD, closed)
B
02/21/2025
Filed — Alteration
INTERIOR RENOVATION ON 2ND FLOOR (APT. #2E) OF AN EXIST'G 8 STORY, MIXED USE BUILDING WITH, REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01102228-P2
02/21/2025
Filed — Alteration
INTERIOR RENOVATION ON 2ND FLOOR (APT. #2E) OF AN EXIST'G 8 STORY, MIXED USE BUILDING WITH, REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01102228-P1
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
02/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
02/19/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
02/19/2025
Special inspection requirement — Final
ZHENHUAN XU
02/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
02/19/2025
Special inspection requirement — Interior lighting power
ZHENHUAN XU
02/05/2025
Violation issued (HPD, closed)
C
02/05/2025
Violation issued (HPD, closed)
C
02/05/2025
Violation issued (HPD, closed)
C
02/05/2025
Violation issued (HPD, closed)
C
01/30/2025
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
A
11/08/2024
Signed off — Alteration
ATT-Inst/Replac of antennas with inst/replac/relo of RRH units on roof.Relo of antenna sector on roof. Retrofit of cabinet in the existing equipment room in the ground floor. All work in compliance with TPPN 5/98.No change to occupancy, use, or egress
M00459723-I1
09/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/03/2024
Permit issued — Plumbing
M01102228-S1-PL
09/03/2024
Permit issued — General Construction
M01102228-I1-GC
08/29/2024
Filed — Alteration
INTERIOR RENOVATION ON 2ND FLOOR (APT. #2E) OF AN EXIST'G 8 STORY, MIXED USE BUILDING WITH, REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01102228-S1
08/29/2024
Filed — Alteration
INTERIOR RENOVATION ON 2ND FLOOR (APT. #2E) OF AN EXIST'G 8 STORY, MIXED USE BUILDING WITH, REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
M01102228-I1
02/01/2024
Violation issued (ECB, closed)
Local Law
01/26/2024
Cycle 9 facade report signed — SAFE
01/16/2024
Permit issued — Sidewalk Shed
M00377862-I1-SH
12/04/2023
Cycle 9 facade report submitted
11/14/2023
Cycle 9 facade inspection completed
11/13/2023
Signed off — Alteration
M08003695-I1
07/10/2023
Signed off — Alteration
Removal of condensing unit on grade. Installation of new condensing unit on new steel dunnage on rooftop. Replacement of air handling unit in equipment room on 1st floor. Related condensate piping per plans. No change to occupancy, use, or egress
M00593629-I1
06/22/2023
Violation issued (FDNY_ORDER, closed)
06/22/2023
Violation issued (FDNY_ORDER, closed)
04/20/2023
Violation issued (FDNY_NOV, closed)
12/16/2022
Permit issued — General Construction
M08003695-I1-GC
10/19/2022
Filed — Alteration
M08003695-I1
10/12/2022
Permit issued — Structural
M00593629-I1-GC-CX
09/22/2022
Filed — Alteration
Removal of condensing unit on grade. Installation of new condensing unit on new steel dunnage on rooftop. Replacement of air handling unit in equipment room on 1st floor. Related condensate piping per plans. No change to occupancy, use, or egress
M00593629-I1
09/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ekata Shah
09/22/2022
Special inspection requirement — Post-installed Anchors
Ekata Shah
09/22/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Ekata Shah
09/22/2022
Special inspection requirement — Maintenance information
Ekata Shah
09/22/2022
Special inspection requirement — Air barrier - visual inspection
Ekata Shah
09/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
Ekata Shah
07/23/2022
Violation issued (ECB, closed)
Construction
07/21/2022
Permit issued — Sidewalk Shed
M00377862-I1-SH
11/24/2021
Violation issued (ECB, closed)
Local Law
11/13/2021
Violation issued (ECB, closed)
Construction
09/29/2021
Special inspection requirement — Structural Steel - Details
Ekata Shah
09/14/2021
Special inspection requirement — Final
Ekata Shah
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP04/06/2026
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/03/2024
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN09/03/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC01/16/2024
DOB NOWGeneral ConstructionSigned-offTEAMWORK ENTERPRISES INC12/16/2022
DOB NOWStructuralSigned-offETAK SYSTEMS LLC10/12/2022
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING07/21/2022
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING07/27/2021
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR07/08/2021
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING07/31/2020
DOB NOWSupported ScaffoldPermit IssuedWAAN ENTERPRISES INC03/23/2018
BISOTISSUEDTEAMWORK ENTERPRISES INC11/22/2019
BISPLISSUEDTOP PLUMBING GROUP,INC07/23/2018
BISOTISSUEDHIGH QUALITY CONSTRUCTION07/20/2018
BISOTISSUEDTEAMWORK ENTERPRISES INC05/10/2018
BISOTISSUEDTEAMWORK ENTERPRISES INC04/04/2018
BISEQISSUEDWAAN ENTERPRISES INC09/21/2017
BISMHISSUEDWIRELESS NETWORK GROUP IN09/14/2017
BISOTISSUEDJACOBS TELECOMMUN. INC03/16/2017
BISBLISSUEDSO PLUMBING & HEATING INC03/21/2016
BISPLISSUEDSO PLUMBING & HEATING INC03/21/2016
BISPLISSUEDCATMAN PLUMBING INC03/14/2016
BISOTISSUEDIHOME IMPROVEMENT & WINDO01/16/2016
BISPLISSUEDAAA TOTAL PLUMBING, INC11/12/2015
BISOTISSUEDPETRA REPAIR & MAINTENANC11/10/2015
BISEQISSUEDJ & G GNRL CONTRACT INC09/24/2015
BISFPISSUEDFIRE COMMAND CO, INC04/14/2015
BISOTISSUEDPETRA REPAIR & MAINTENANC03/23/2015
BISMHISSUEDPRESTIGIOUS MAINTENANCE I02/20/2015
BISPLISSUEDAAA TOTAL PLUMBING, INC12/23/2014
BISOTISSUEDPETRA REPAIR & MAINTENANC12/19/2014
BISMHISSUEDEMPIRE TELECOM USA,LLC11/17/2014
BISPLISSUEDMETROPOLITAN HEAT & POWER CO02/10/2012
BISPLISSUEDMETROPOLITAN HEAT & POWER CO01/20/2012
BISBLISSUEDMETROPOLITAN HEAT & POWER CO02/14/2011
BISPLISSUEDMETROPOLITAN HEAT & POWER CO10/06/2010
BISMHISSUEDCELLULAR TELEPHNE COMPANY04/18/1994
BISOTISSUEDCELLULAR TELEPHNE COMPANY04/06/1994
BISPLISSUEDREEM PLBG & HTG CORP01/28/1994
BISPLISSUEDREEM PLBG & HTG CORP01/27/1994
+ 8 more permits on file
4 projects · most recent 04/06/2026
General Wiring
FiledStatusContractorScope
04/06/2026CompleteHIGH QUALITY ELEC.OF NYC—
07/30/2020Permit IssuedRICHARD NEU—
08/23/2018CompleteKJK ELECTRIC INCGeneral Wiring
03/16/2018Permit IssuedWCK ELECTRIC CORP.—
2 projects · most recent 07/30/2020
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/30/2020Permit IssuedTOPLINE NYC INCSidewalk Shed
03/16/2018Permit IssuedWAAN ENTERPRISES INCScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
02/25/2025Tenant Protection Plan ComplianceZHENHUAN XUspecial
02/25/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
02/25/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
02/19/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
02/19/2025Tenant Protection Plan ComplianceZHENHUAN XUspecial
02/19/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
02/19/2025FinalZHENHUAN XUprogress
02/19/2025Fire-Resistance Rated ConstructionZHENHUAN XUprogress
02/19/2025Interior lighting powerZHENHUAN XUenergy_progress
09/22/2022HVAC-R and service water heating equipmentEkata Shahenergy_progress
09/22/2022Post-installed AnchorsEkata Shahspecial
09/22/2022Structural Steel - High Strength BoltingEkata Shahspecial
09/22/2022Maintenance informationEkata Shahenergy_progress
09/22/2022Air barrier - visual inspectionEkata Shahenergy_progress
09/22/2022HVAC-R and service water heating system controlsEkata Shahenergy_progress
09/29/2021Structural Steel - DetailsEkata Shahspecial
09/14/2021FinalEkata Shahprogress
09/14/2021Mechanical SystemsEkata Shahspecial
▾Documents — 327 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
09/06/2026M00026104-I1Request digital key ↗
09/01/2026M00593629-I1Request digital key ↗
09/01/2026M08003695-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00377862-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/14/2026M00459723-I1Request digital key ↗
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION40
11/19/2019140878101Open ↗
07/24/2019123485335Open ↗
07/16/2019123485335Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION26
11/22/2019140878101Open ↗
07/27/2018123485335Open ↗
07/23/2018123485335Open ↗
Showing 3 of 26 on file for this type
▸Seals & Professional Certifications67
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
12/12/2019140878101Open ↗
12/12/2019140878101Open ↗
04/12/2019140739976Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026M08003695-I1Open ↗
08/26/2026M01102228-P2Open ↗
08/26/2026M01102228-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
11/19/2019140878101Open ↗
07/23/2018123485335Open ↗
02/28/2018140739976Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
11/19/2019140878101Open ↗
02/28/2018140739976Open ↗
09/07/2017140687399Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
11/19/2019140878101Open ↗
02/28/2018140739976Open ↗
09/07/2017140687399Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026M01102228-P2Open ↗
08/29/2026M01102228-P2Open ↗
08/29/2026M01102228-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026M01102228-P2Open ↗
08/28/2026M00593629-I1Open ↗
08/23/2026M01102228-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/23/2018123485335Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING7
03/17/2016140471503Open ↗
12/30/2015140444776Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
07/23/2018123485335Open ↗
08/03/2016140444776Open ↗
07/25/2016140444776Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
03/17/2016140471503Open ↗
Showing 1 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
02/15/2017122693497Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/27/2016122106256Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026M00459723-I1Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
02/14/2019123485335Open ↗
07/23/2018123485335Open ↗
02/29/2016122693497Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00377862-I1Open ↗
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
11/19/2019140878101Open ↗
07/23/2018123485335Open ↗
02/28/2018140739976Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026M08003695-I1Open ↗
08/26/2026M01102228-P1Open ↗
08/26/2026M01102228-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/14/2019123485335Open ↗
01/31/2019123485335Open ↗
07/23/2018123485335Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
12/12/2019140878101Open ↗
04/12/2019140739976Open ↗
03/14/2019123485335Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
11/19/2019140878101Open ↗
02/28/2018140739976Open ↗
12/30/2015140444776Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/19/2019140878101Open ↗
02/28/2018140739976Open ↗
03/17/2016140471503Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/07/2017140687399Open ↗
▸BISNYCECC ANALYSIS1
11/19/2019140878101Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00459723-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/19/2019140878101Open ↗
02/28/2018140739976Open ↗
03/17/2016140471503Open ↗
Showing 3 of 6 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
08/19/2019123485335Open ↗
01/31/2019123485335Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/23/2015122211230Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
11/23/2015122211230Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
12/12/2019140878101Open ↗
08/19/2019123485335Open ↗
07/29/2019123485335Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/10/2016140444776Open ↗
03/17/2016140471503Open ↗
01/15/2016140444776Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT24
12/12/2019140878101Open ↗
11/19/2019140878101Open ↗
04/12/2019140739976Open ↗
Showing 3 of 24 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST4
04/03/2018140739976Open ↗
09/21/2017140687399Open ↗
06/10/2016140444776Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms36
▸BISBOROUGH INTAKE FORM11
12/12/2019140878101Open ↗
08/19/2019123485335Open ↗
07/29/2019123485335Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET10
07/23/2018123485335Open ↗
03/07/2017123035081Open ↗
02/29/2016122693497Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION8
09/07/2017123035081Open ↗
02/15/2017122693497Open ↗
02/15/2017122693497Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
11/19/2019140878101Open ↗
02/28/2018140739976Open ↗
09/07/2017140687399Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDHCR DOCUMENT1
04/12/2019140739976Open ↗