← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
173 PERRY STREET
MANHATTAN · West Village · BIN 1086051
💬 Discuss this project
2001Year Built
15Stories
RMBuilding Class
C1-7Zoning
79,123 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized1 Active Violation 5 likely answered ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 14,219 sf lot · 5.56 FAR built · Flood zone AE
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 162 filings
Floor 15
Floor 14
Floor 13
Floor 12
Floor 111 filing
Floor 101 filing
Floor 9
Floor 82 filings
Floor 7
Floor 6
Floor 5
Floor 4
Floor 31 filing
Floor 2
Floor 1
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
West Perry9203/21/2026
West Perry Street Condo1103/21/2026
Perry1003/21/2026
West Perry Holding303/21/2026
Brwon Harris Stevens Residential103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ Engineering108/19/2026
CES Engineering308/14/2026
Vincent J. Liotta P.E.102/27/2026
Hgoldsteinarchitect102/12/2026
Socotec110/14/2025
Jung H. Choi, Architect201/30/2025
All City Engineering311/10/2023
IP Group508/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Agouti Construction Consulting603/21/2026
Socotec103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Matco ServiceGeneral Contractor507/08/2026
Ganic Plumbing & HeatingPlumbing307/08/2026
Metrotech MechanicalPlumbing303/22/2026
Backflow Prevention of NYPlumbing207/08/2026
HobbsGeneral Contractor207/10/2026
Cresco ElectricalElectrical103/22/2026
Arsenal ScaffoldScaffold108/22/2026
Donato PlumbingPlumbing107/08/2026
KG SprinklerFire Protection107/08/2026
RCD RestorationsGeneral Contractor108/16/2026
Salzman ElectricElectrical103/21/2026
The Metro Group ElectricElectrical103/22/2026
NY Signature BuildersGeneral Contractor104/09/2026
PerfectaireGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vincent J. Liotta P. E1974102/27/2026
Integrity Consulting Service666202/20/2026
Socotec301110/14/2025
Jung H Choi Architect3020201/30/2025
All City Engineering7115311/10/2023
IP Group2542207/22/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/01/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
M01355158-S2-MS
09/28/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2026
Elevator Category 1 inspection report filed
186 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
Nothing on file for this building.
550 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account