| Owner | Filings | Most Recent |
|---|---|---|
| 1730 BEDFORD REALTY | 134 | 07/08/2026 |
| LIDL US | 16 | 07/08/2026 |
| OWNERS REP | 9 | 07/08/2026 |
| N TECH DESIGN OF AMERICA | 1 | 03/22/2026 |
| EURO BUILING GROUP INC | 18 | 03/22/2026 |
| GWT ENTERPRISE INC | 2 | 03/22/2026 |
| 1730 BEDFORD OWNER LLC | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CS ENGINEERING PC (CBP ENGINEERING) | 2 | 05/07/2026 |
| RISE ARCHITECTURE | 7 | 02/05/2026 |
| BOWMAN CONSULTING GROUP | 3 | 08/04/2025 |
| RICHARD WAINER ARCHITECT, PLLC | 12 | 07/14/2025 |
| MURDOCH ENGINEERING | 1 | 07/14/2025 |
| NEW YORK ENGINEERS LLC | 5 | 05/07/2025 |
| UG ENGINEERING SERVICES PC | 5 | 05/01/2025 |
| ZYSCOVICH ARCHITECTS | 2 | 04/25/2025 |
| DESIMONE CONSULTING ENGINEERING | 1 | 04/10/2025 |
| YORK TOWER CONSULTING ENGINEERING | 9 | 04/01/2025 |
| LEON SKVIRSKY PE | 2 | 03/21/2025 |
| INTERIOR ARCHITECTS | 1 | 03/13/2025 |
| BOWMAN CONSULTING ENGINEERING, LAND | 1 | 03/13/2025 |
| BRITT PETERS & ASSOCIATES, INC | 1 | 03/13/2025 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 11/27/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| JACK JAFFA ASSOCIATES | 36 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 9 | 03/21/2026 |
| D R BROWN | 26 | 03/21/2026 |
| J A EXPEDITING | 12 | 03/21/2026 |
| THE GREEN STUDIO | 1 | 03/21/2026 |
| BUILDING BROTHERS | 4 | 03/21/2026 |
| MILLENNIUM DESIGNS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| EURO BUILDING GROUP INC | General Contractor | 15 | 07/08/2026 |
| N Y SIGN ART | Scaffold | 11 | 07/08/2026 |
| PRIME PIPING & HEATING IN | Fire Protection | 6 | 07/08/2026 |
| LORICH CONSTRUCTION MANAGEMENT | General Contractor | 5 | 07/08/2026 |
| SOUTH EAST CONSTRUCTION G | General Contractor | 4 | 07/08/2026 |
| GWT ENTERPRISES INC | General Contractor | 4 | 07/08/2026 |
| PRIME PIPING & HEATING IN | Plumbing | 3 | 07/08/2026 |
| SIGNSTAR NYC | Scaffold | 2 | 07/08/2026 |
| MANHATTAN D ENTERPRISES | General Contractor | 2 | 07/08/2026 |
| DENALI ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| NY SIGN ART INC | General Contractor | 1 | 04/09/2026 |
| RISE ARCHITECTURE | General Contractor | 1 | 03/22/2026 |
| CMA PLUMBING & HEATING IN | Fire Protection | 1 | 07/08/2026 |
| ADVANCED PLBG LLC | Plumbing | 1 | 07/08/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 1 | 07/08/2026 |
| ADVANCED PLUMBING LLC | Fire Protection | 1 | 07/08/2026 |
| SPECTRUM ON BROADWAY-ELEC | Electrical | 1 | 03/22/2026 |
| GREAT CITY MECHANICAL INC | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| WHITESTONE ASSOCIATES ENG | 8144 | 10 | 05/07/2026 |
| GREGORY V. PEROTTO, P.E. | 947 | 1 | 07/14/2025 |
| REGIONAL TESTING CORP. | 394 | 16 | 05/07/2025 |
| SGM ENGINEERING | 2366 | 5 | 03/17/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | EURO BUILDING GROUP INC | 09/16/2025 |
| DOB NOW | Curb Cut | Signed-off | EURO BUILDING GROUP INC | 08/28/2025 |
| DOB NOW | Structural | Signed-off | NY SIGN ART INC | 08/14/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 08/11/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/18/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/18/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/18/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/18/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/17/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/17/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/17/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/17/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/17/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 07/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SOUTH EAST CONSTRUCTION G | 06/02/2025 |
| DOB NOW | General Construction | Signed-off | SOUTH EAST CONSTRUCTION G | 05/30/2025 |
| DOB NOW | Structural | Signed-off | LORICH CONSTRUCTION MANAGEMENT | 04/21/2025 |
| DOB NOW | Sprinklers | Signed-off | A M B MECHANICAL INC | 04/08/2025 |
| DOB NOW | Standpipe | Signed-off | A M B MECHANICAL INC | 04/08/2025 |
| DOB NOW | Plumbing | Signed-off | PRIME PIPING & HEATING IN | 04/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | LORICH CONSTRUCTION MANAGEMENT | 04/07/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SOUTH EAST CONSTRUCTION G | 03/31/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED PLUMBING LLC | 03/31/2025 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 03/26/2025 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 03/26/2025 |
| DOB NOW | Plumbing | Signed-off | ADVANCED PLBG LLC | 03/20/2025 |
| DOB NOW | General Construction | Signed-off | SOUTH EAST CONSTRUCTION G | 03/20/2025 |
| DOB NOW | Sprinklers | Signed-off | CMA PLUMBING & HEATING IN | 03/06/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 03/05/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | EURO BUILDING GROUP INC | 03/05/2025 |
| DOB NOW | General Construction | Signed-off | LORICH CONSTRUCTION MANAGEMENT | 03/04/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | LORICH CONSTRUCTION MANAGEMENT | 03/04/2025 |
| DOB NOW | Supported Scaffold | Signed-off | GWT ENTERPRISES INC | 01/07/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | GWT ENTERPRISES INC | 01/07/2025 |
| DOB NOW | Construction Fence | Signed-off | EURO BUILDING GROUP INC | 12/02/2024 |
| DOB NOW | General Construction | Permit Issued | EURO BUILDING GROUP INC | 11/20/2024 |
| DOB NOW | Plumbing | Signed-off | A M B MECHANICAL INC | 04/10/2024 |
| DOB NOW | Sprinklers | Signed-off | PRIME PIPING & HEATING IN | 04/10/2024 |
| DOB NOW | Standpipe | Signed-off | A M B MECHANICAL INC | 04/10/2024 |
| DOB NOW | Structural | Signed-off | EURO BUILDING GROUP INC | 02/02/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/07/2026 | Signed-off | LORICH CONSTRUCTION MANAG | Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems | Refrigeration Guntner GFWP 090.0/4-N(2)-F(6)/03/4P M 220kW/460V/Aluminum 750,000 BTU · Cooling Tower ×1 GFWP 090.0/4-N(2)-F6/03/4P M 750,000 BTU · Refrigeration Unit ×1 S-GFWP 090.0/5-N(2)-F6/03/2P.M 1,136,712 BTU · Refrigeration Unit ×1 Heat / Cool Mitsubishi Electric PEFY-P96NMHSU-E 96,000 BTU · Vrf Indoor ×5 PURY-EP192YSNU-A1 215,000 BTU · Vrf Outdoor ×5 PEFY-P48NMHSU-E 48,000 BTU · Vrf Indoor ×3 PEFY-P72NMHSU-E 72,000 BTU · Vrf Indoor ×3 PMFY-P15NBMU-ER6 15,000 BTU · Vrf Indoor ×1 Lennox ×2 Ventilation Airius PEAR A1-15-SP 406 CFM ×12 Greenheck SP-B110 100 CFM · Exhaust Fan ×2 Tjernlund M-8 600 CFM ×2 Aaon ERC-5262C 6,000 CFM · Doas ×1 Captiveaire SIF13DD-HE 814 CFM · Kitchen Exhaust ×1 |
| 08/04/2025 | Signed-off | SOUTH EAST CONSTRUCTION G | Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems | Heat / Cool Carrier 40RFQA12A3A5 4,000 CFM ×2 Johnson Controls TVAHP144B32S 126,000 BTU · Heat Pump Outdoor ×2 Indeeco 931U03000V 160 CFM · Electric Heater ×1 Ventilation Captiveaire DFA 100CA 100 CFM · Exhaust Fan ×1 FA 200CA 150 CFM · Exhaust Fan ×1 USB120DD-RM 1,900 CFM · Exhaust Fan ×1 Refrigeration Kolpak PC98MZOP-3 1 BTU · Refrigeration Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/07/2026 | Signed-off | CMA PLUMBING & HEATING IN | Sprinkler System |
| 08/04/2025 | Signed-off | ADVANCED PLUMBING LLC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/07/2026 | Signed-off | BEDROCK PLBG. & HTG., INC | Water/Sanitary |
| 08/04/2025 | Signed-off | ADVANCED PLBG LLC | Water/Sanitary |
| 05/07/2025 | Signed-off | PRIME PIPING & HEATING IN | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/18/2025 | Permit Issued | D & W ELECTRICAL CONT COR | 70 meters, 70 new_meters |
| 10/06/2025 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 10/06/2025 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 10/06/2025 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 10/06/2025 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 10/06/2025 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 10/06/2025 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 04/27/2025 | Complete | EMPIRE STATE ECT'L CON IN | General Wiring |
| 03/26/2025 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 03/26/2025 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 03/13/2025 | Permit Issued | ELECTRIC ESSENTIALS CORP | General Wiring |
| 12/12/2024 | Complete | D & W ELECTRICAL CONT COR | 1 meters, 1 new_meters |
| 10/22/2024 | Permit Issued | DENALI ELECTRIC CORP | — |
| 03/06/2024 | Permit Issued | CAPUTEK ELEC'L SERVICES, | — |
| 03/06/2024 | Complete | D & W ELECTRICAL CONT COR | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/07/2026 | Signed-off | LORICH CONSTRUCTION MANAG | Steel |
| 08/04/2025 | Signed-off | SOUTH EAST CONSTRUCTION G | Steel, Concrete |
| 07/14/2025 | Signed-off | NY SIGN ART INC | 1 scope_items |
| 05/07/2025 | Signed-off | PRIME PIPING & HEATING IN | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/14/2025 | Signed-off | NY SIGN ART INC | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 01/06/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 01/06/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 12/10/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/01/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/01/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/01/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 09/22/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 09/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/16/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/12/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/12/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/03/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/16/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/20/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/05/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/30/2025 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 05/30/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/30/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 05/28/2025 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 05/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/28/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 04/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/10/2026 | Mechanical Systems | Mudar Khantamr | special |
| 04/10/2026 | Final | Mudar Khantamr | progress |
| 07/16/2025 | Final | Richard Wainer | progress |
| 07/11/2025 | Final | Richard Wainer | progress |
| 05/21/2025 | Standpipe Systems | Paul Raymond | special |
| 05/21/2025 | Fire-Resistant Penetrations and Joints | Paul Raymond | special |
| 05/21/2025 | Post-installed Anchors | Paul Raymond | special |
| 05/21/2025 | Sprinkler Systems | Paul Raymond | special |
| 05/21/2025 | HVAC-R and service water heating equipment | Paul Raymond | energy_progress |
| 05/21/2025 | HVAC-R and service water heating system controls | Paul Raymond | energy_progress |
| 05/21/2025 | Maintenance information | Paul Raymond | energy_progress |
| 05/21/2025 | HVAC-R and service water piping design and insulation | Paul Raymond | energy_progress |
| 05/09/2025 | Fenestration areas | Paul Raymond | energy_progress |
| 05/09/2025 | Vestibules | Paul Raymond | energy_progress |
| 05/09/2025 | Insulation placement and R values | Paul Raymond | energy_progress |
| 05/09/2025 | Air barrier — testing | Paul Raymond | energy_progress |
| 05/09/2025 | Fenestration and door U-factor and product ratings | Paul Raymond | energy_progress |
| 05/09/2025 | Protection of exposed foundation insulation | Paul Raymond | energy_progress |
| 05/09/2025 | Air barrier continuity plan testing | Paul Raymond | energy_progress |
| 05/09/2025 | Air barrier - visual inspection | Paul Raymond | energy_progress |
| 05/09/2025 | Fenestration air leakage | Paul Raymond | energy_progress |
| 05/09/2025 | Fire-Resistance Rated Construction | Paul Raymond | progress |
| 05/09/2025 | Concrete - Cast-In-Place | Paul Raymond | special |
| 05/09/2025 | Fire-Resistant Penetrations and Joints | Paul Raymond | special |
| 05/09/2025 | Exterior Insulation and Finish Systems (EIFS) | Paul Raymond | special |