← Back
BuildNYC
Elevator apt, fireproof without stores
1730 OCEAN AVENUE
BROOKLYN · Midwood · BIN 3428965
💬 Discuss this project
2020Year Built
7Stories
D3Building Class
R6AZoning
27,781 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized2 Active Violations ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 1730 Ocean Avenue Development · 7,575 sf lot · 3.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1730 Ocean Avenue Development LLC45p · 5 filings · 20 docs
Bulkhead1730 Ocean Avenue Development LLC3p · 3 filings · 20 docs
Floor 71730 Ocean Avenue Development LLC46p · 5 filings · 20 docs
Floor 61730 Ocean Avenue Development LLC45p · 5 filings · 20 docs
Floor 51730 Ocean Avenue Development LLC43p · 5 filings · 20 docs
Floor 41730 Ocean Avenue Development LLC43p · 5 filings · 20 docs
Floor 31730 Ocean Avenue Development LLC45p · 5 filings · 20 docs
Floor 21730 Ocean Avenue Development LLC45p · 5 filings · 20 docs
Floor 11730 Ocean Avenue Development LLC50p · 7 filings · 20 docs
Site & exterior1730 Ocean Avenue Development LLC36p · 4 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1730 Ocean Avenue Development3607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/25/2020$3.2M—1730 OCEAN AVENUE LLC → 1730 Ocean Avenue Development$117/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Levin Engineering706/14/2022
Paul Perdek, Professional Engineering307/22/2021
Solomon Rosenzweig P.E106/23/2020
Studio Gallos206/22/2020
LMW Engineering Group112/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Levin Engineering1403/21/2026
AE Design Solution603/21/2026
Richard Wainer Architect603/21/2026
Binyan Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jacobs DevelopmentGeneral Contractor803/22/2026
Rom Piping & HeatingPlumbing207/08/2026
Berger Quality Electrical ConElectrical103/22/2026
Jacobs DevelopmentScaffold107/08/2026
Rom Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Levin Engineering1267406/14/2022
Regional Testing394112/06/2019
Building Lifecycle
08/12/2026
Elevator Category 1 inspection report filed
08/10/2026
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE…
HPD violation · open
05/11/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
08/25/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CHAIN DOOR GUARD IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM…
HPD violation · closed
08/25/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT BATHTUB IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 2nd…
HPD violation · closed
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offJacobs Development09/22/2021
DOB NOWMechanical SystemsSigned-offJacobs Development06/28/2021
DOB NOWPlumbingSigned-offRom Piping & Heating03/30/2021
DOB NOWSprinklersSigned-offRom Piping & Heating03/30/2021
DOB NOWPlumbingSigned-offRom Piping & Heating03/08/2021
BISOTISSUEDKamtech Restoration01/26/2022
BIS—ISSUEDJacobs Development10/12/2021
BIS—ISSUEDJacobs Development06/24/2021
BISEQISSUEDCore Scaffold Systems02/02/2021
BISEQISSUEDCore Scaffold Systems01/26/2021
BIS—ISSUEDJacobs Development12/07/2020
4 projects · most recent 01/28/2022
General Wiring
FiledStatusContractorScope
01/28/2022CompleteBerger Quality Electrical Con—
01/26/2022CompleteA.L. ElectricalGeneral Wiring
06/02/2021CompleteR.C.M. Electric—
01/20/2021CompleteV. Vass Electric—
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/14/2022FinalDmitry Levinprogress
06/14/2022Maintenance informationDmitry Levinenergy_progress
06/14/2022HVAC-R and service water heating equipmentDmitry Levinenergy_progress
06/14/2022HVAC-R and service water heating system controlsDmitry Levinenergy_progress
06/14/2022HVAC-R and service water piping design and insulationDmitry Levinenergy_progress
06/14/2022Heating SystemsDmitry Levinspecial
06/14/2022Mechanical SystemsDmitry Levinspecial
08/31/2021HVAC-R and service water piping design and insulationDmitry Levinenergy_progress
08/31/2021HVAC-R and service water heating system controlsDmitry Levinenergy_progress
08/31/2021Maintenance informationDmitry Levinenergy_progress
08/31/2021HVAC-R and service water heating equipmentDmitry Levinenergy_progress
08/25/2021Maintenance informationDmitry Levinenergy_progress
08/25/2021HVAC-R and service water piping design and insulationDmitry Levinenergy_progress
08/25/2021HVAC-R and service water heating system controlsDmitry Levinenergy_progress
08/25/2021HVAC-R and service water heating equipmentDmitry Levinenergy_progress
07/26/2021FinalPaul Perdekprogress
07/23/2021HVAC-R and service water piping design and insulationDmitry Levinenergy_progress
07/23/2021HVAC-R and service water heating system controlsDmitry Levinenergy_progress
07/23/2021HVAC-R and service water heating equipmentDmitry Levinenergy_progress
07/23/2021Maintenance informationDmitry Levinenergy_progress
170 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account