← Back
BuildNYC
Walk-up cooperative
Clearview Gardens
1732 166TH STREET · BIN 4540542
💬 Discuss this project
1951Year Built
2Stories
C6Building Class
R3-2Zoning
229,508 sfGross Floor Area
240Units
LL97 CoveredRent Stabilized2 Active Violations 1 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 16th Ave and Willets · 480,568 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2New riser installation and gas piping1p · 1 filing · 10 docs
Floor 1New riser installation and gas piping1p · 1 filing · 10 docs
CellarNew riser installation and gas piping4p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Clearview Gardens703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Revans Design PE202/15/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.D.S. Mechanical PBG & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Revans Design PE4617202/15/2024
Building Lifecycle
All (7)Filed (2)Permit Issued (1)Signed Off (1)Inspection (3)
06/12/2025
Signed off — Alteration
REPLACE LOW PRESSURE GAS DISTRIBUTION PIPING AS PER PLANS. RECONNECT TO EXISTING STOVES & DRYERS. INSTALL NEW SPRINKLER HEADS OFF OF DOMESTIC WATER LINE. WORK IN CONJUNCTION WITH Q00969651. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
Q00965037-I1
02/15/2024
Filed — Alteration
REPLACE LOW PRESSURE GAS DISTRIBUTION PIPING AS PER PLANS. RECONNECT TO EXISTING STOVES & DRYERS. INSTALL NEW SPRINKLER HEADS OFF OF DOMESTIC WATER LINE. WORK IN CONJUNCTION WITH Q00969651. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
Q00965037-P1
02/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/26/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/22/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/16/2024
Permit issued — Plumbing
Q00965037-I1-PL
01/10/2024
Filed — Alteration
REPLACE LOW PRESSURE GAS DISTRIBUTION PIPING AS PER PLANS. RECONNECT TO EXISTING STOVES & DRYERS. INSTALL NEW SPRINKLER HEADS OFF OF DOMESTIC WATER LINE. WORK IN CONJUNCTION WITH Q00969651. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
Q00965037-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating01/16/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/26/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/22/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/15/2024Fire-Resistant Penetrations and JointsPAUL REVANSspecial
02/15/2024Tenant Protection Plan CompliancePAUL REVANSspecial
02/15/2024Fire-Resistant Penetrations and JointsPAUL REVANSspecial
02/15/2024Tenant Protection Plan CompliancePAUL REVANSspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00965037-I1Request digital key ↗
08/23/2026Q00965037-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q00965037-I1Open ↗
08/29/2026Q00965037-I1Open ↗
08/23/2026Q00965037-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00965037-I1Open ↗
08/23/2026Q00965037-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00965037-I1Open ↗
08/23/2026Q00965037-P1Open ↗