← Back
Primarily 2 family with 1 store or office
1732 UNIONPORT ROAD
BRONX · Pelham Parkway-Van Nest · BIN 2043011
💬 Discuss this project
1905Year Built
2.5Stories
S2Building Class
R5Zoning
2,280 sfGross Floor Area
3Units
Primarily 2 family with 1 store or office · Owner of record: 1732 UNION LLC · 2,510 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 218p · 2 filings · 20 docs
Floor 119p · 2 filings · 20 docs
Cellar1p · 1 filing · 3 docs
Sub-Basement18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ABD CONSTRUCTION CORP1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2018$509K—U.S. BANK NATIONAL ASSOCIATION → 1732 UNION LLC$223/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES MORAN ARCHITECTURE & INTERIOR305/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABD CONSTRUCTION CORPGeneral Contractor303/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing106/28/2026
Building Lifecycle
All (36)Filed (3)Permit Issued (2)Inspection (3)Special Inspection (28)
11/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2025
Permit issued — Plumbing
X01226503-I1-PL
05/19/2025
Filed — Alteration
FILING FOR NEW PLUMBING FIXTURES & NEW ROUGHINGS ON EXISTING WASTE & VENT STACK FOR BLDG. FILING FOR NEW ELECTRIC HOT WATER HEATER IN THE BSMT. THERE IS NO GAS WORK IN THE BLDG. HEATING IS TO BE ELECTRIC HVAC FILED UNDER DOB NOW #X001174234.
X01226503-I1
05/16/2025
Permit issued — General Construction
X01203631-I1-GC
05/12/2025
Filed — Alteration
X01203631-P1
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
James Moran
05/12/2025
Special inspection requirement — Preliminary
James Moran
05/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
James Moran
05/12/2025
Special inspection requirement — Final
James Moran
05/12/2025
Special inspection requirement — Insulation placement and R values
James Moran
05/12/2025
Special inspection requirement — Fenestration air leakage
James Moran
05/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
James Moran
05/12/2025
Special inspection requirement — Fenestration areas
James Moran
05/12/2025
Special inspection requirement — Lighting in dwelling units
James Moran
05/12/2025
Special inspection requirement — Interior lighting power
James Moran
05/12/2025
Special inspection requirement — Lighting controls
James Moran
05/12/2025
Special inspection requirement — Air barrier - visual inspection
James Moran
05/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
James Moran
05/12/2025
Special inspection requirement — Exterior lighting power
James Moran
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
James Moran
05/09/2025
Special inspection requirement — Final
James Moran
05/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
James Moran
05/09/2025
Special inspection requirement — Preliminary
James Moran
05/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
James Moran
05/09/2025
Special inspection requirement — Fenestration air leakage
James Moran
05/09/2025
Special inspection requirement — Air barrier - visual inspection
James Moran
05/09/2025
Special inspection requirement — Lighting controls
James Moran
05/09/2025
Special inspection requirement — Exterior lighting power
James Moran
05/09/2025
Special inspection requirement — Fenestration areas
James Moran
05/09/2025
Special inspection requirement — Insulation placement and R values
James Moran
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
James Moran
05/09/2025
Special inspection requirement — Lighting in dwelling units
James Moran
05/09/2025
Special inspection requirement — Interior lighting power
James Moran
05/05/2025
Filed — Alteration
X01203631-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHORBRIDGE PLUMBING & HEAT05/27/2025
DOB NOWGeneral ConstructionPermit IssuedABD CONSTRUCTION CORP05/16/2025
1 project · most recent 05/19/2025
Water/Sanitary
FiledStatusContractorScope
05/19/2025Permit IssuedHORBRIDGE PLUMBING & HEATWater/Sanitary
1 project · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/12/2025Energy Code Compliance InspectionsJames Moranprogress
05/12/2025PreliminaryJames Moranprogress
05/12/2025Fire-Resistance Rated ConstructionJames Moranprogress
05/12/2025FinalJames Moranprogress
05/12/2025Insulation placement and R valuesJames Moranenergy_progress
05/12/2025Fenestration air leakageJames Moranenergy_progress
05/12/2025Fenestration and door U-factor and product ratingsJames Moranenergy_progress
05/12/2025Fenestration areasJames Moranenergy_progress
05/12/2025Lighting in dwelling unitsJames Moranenergy_progress
05/12/2025Interior lighting powerJames Moranenergy_progress
05/12/2025Lighting controlsJames Moranenergy_progress
05/12/2025Air barrier - visual inspectionJames Moranenergy_progress
05/12/2025HVAC-R and service water piping design and insulationJames Moranenergy_progress
05/12/2025Exterior lighting powerJames Moranenergy_progress
05/09/2025Energy Code Compliance InspectionsJames Moranprogress
05/09/2025FinalJames Moranprogress
05/09/2025Fire-Resistance Rated ConstructionJames Moranprogress
05/09/2025PreliminaryJames Moranprogress
05/09/2025Fenestration and door U-factor and product ratingsJames Moranenergy_progress
05/09/2025Fenestration air leakageJames Moranenergy_progress
05/09/2025Air barrier - visual inspectionJames Moranenergy_progress
05/09/2025Lighting controlsJames Moranenergy_progress
05/09/2025Exterior lighting powerJames Moranenergy_progress
05/09/2025Fenestration areasJames Moranenergy_progress
05/09/2025Insulation placement and R valuesJames Moranenergy_progress
Latest 25 of 28.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026X01203631-I1Request digital key ↗
08/19/2026X01203631-P1Request digital key ↗
08/19/2026X01226503-I1Request digital key ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature27
08/29/2026X01203631-I1Open ↗
08/29/2026X01203631-I1Open ↗
08/29/2026X01203631-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026X01203631-I1Open ↗
08/19/2026X01203631-P1Open ↗
08/13/2026X01226503-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026X01203631-I1Open ↗
08/19/2026X01203631-P1Open ↗
08/13/2026X01226503-I1Open ↗